J2 FM-66 Submittal Tracker.xls
XLS spreadsheet 116 KB Posted
- Solicitation number
- 1240LT23R0063
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a submittal tracker for a federal contract opportunity to perform HVAC repairs at the Rocky Mountain Research Station in Flagstaff, Arizona. The solicitation number is 1240LT23R0063 and was issued by the U.S. Department of Agriculture Forest Service. The submittal tracker outlines five required submissions from the contractor, including a project schedule and health and safety plan due prior to on-site work, as well as water treatment and access panel shop drawings, O&M manuals and warranty documentation, all which require approval from the contracting office by specified deadlines in order to complete the HVAC repair work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rev2 1240LT23R0063 RFI Answers.docx | DOCX document | |
| 1240LT23R0063 RFI Answers.docx | DOCX document | |
| 1240LT23R0063.pdf | ||
| J1 Wage Determinations Coconino County AZ.txt | TXT text file | |
| SOW Flagstaff HVAC Repairs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NO. | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | ||||||||||||||||||
| Flagstaff HVAC Repairs | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||
| LINE NUMBER | Note: Provide Electronic PDF submittals via email to the CO and COR. Markup each submi | CERTIF. OF COMPLIANCE | SHOP DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | DRAWINGS | REPORT | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | NOTES |
| GENERAL | |||||||||||||||||||||
| 1 | Project Schedule | X | Prior to on-site work | ||||||||||||||||||
| 2 | Contractor's Health and Safety Plan | X | Prior to on-site work | Provide Safety Plan showing compliance with 29 CFR 1910.147 | |||||||||||||||||
| MECHANICAL | |||||||||||||||||||||
| 3 | Water Treatment System for the Cooling Tower | X | X | X | X | X | Prior to on-site work | ||||||||||||||
| 4 | Access panel for the Cooling Tower | X | X | X | X | Prior to on-site work | |||||||||||||||
| CLOSEOUT | |||||||||||||||||||||
| 5 | O&M maint data and maint manuals & Manufacturer's Warranty for the Cooling Tower Water Treatment System | X | X | X | X | Before Acceptance |
&L&"Arial,Bold"&6FORM 66, OCT 99 &"Arial,Regular"Previous Edition Will Be Used