Rev2 1240LT23R0063 RFI Answers.docx

DOCX document 122 KB Posted

Attached to
Rocky Mountain Research Station - Flagstaff HVAC Repair
Solicitation number
1240LT23R0063
Issued by

About this file

This document contains responses to questions from offerors regarding solicitation number 1240LT23R0063 from the Rocky Mountain Research Station - Flagstaff HVAC Repair. The responses provide details on the equipment and controls for the project, including confirmation that the VFDs currently installed operate evaporative cooling fans at a variable speed and will need to be removed and replaced with government furnished equipment. It also identifies Pueblo Mechanical Systems as the preferred controls contractor and notes the BAS software for the greenhouse and lab is KMC Connect. No other salient details are included regarding products, services, pricing or terms for the solicitation.

View the file

Other files

File Type Posted
1240LT23R0063 RFI Answers.docx DOCX document
1240LT23R0063.pdf PDF
J1 Wage Determinations Coconino County AZ.txt TXT text file
J2 FM-66 Submittal Tracker.xls XLS spreadsheet
SOW Flagstaff HVAC Repairs.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rocky Mountain Research Station - Flagstaff HVAC Repairs Notice ID: 1240LT23R0063 RFI Answers

Atlantic Pacific Standard 07/17/2023

1. Is there a way to get the serial number from the unit? There are some items in the request that would be better defined if I had that number.

A: Model No: F1343-N Serial No: 912018-0 Belt No: 5-B120

1. Who is your current control contractor for this project? If you don't have one, who is your preferred controls contractor?

A: The BAS Software for both the Greenhouse and the lab is KMC Connect. Our Controls contractor is typically Pueblo Mechanical Systems 800-840-9170. Offerors are free to utilize other vendors to integrate equipment into the BAS systems.

07/31/2023

1. What pieces of equipment do the VFD’s get connected to? Will these be at a fixed speed or variate? Will a DP be required?

A: The VFDs operate (wet wall) evaporative cooling fans at a variable speed. The fans already have VFDs installed which the contractor shall remove and replace with the government furnished equipment, then re-integrate into the BAS. There is no Differential Pressure switch, the fan speed is set from the temperature. The Configuration can be set from the two remaining VFDs from the other two Greenhouses.