About this file

This document outlines requirements for the installation of additional environmental monitors at the Southeast Louisiana Veterans Health Care System in New Orleans, Louisiana. The contractor shall provide all labor, materials, tools, equipment, expertise, administration, supervision and other necessities to install additional room pressure monitors, temperature and humidity sensors, and upgrade the existing Johnson Controls building automation system. The contractor must have experience with the specified products and complete the work within 104 calendar days of receiving the notice to proceed. The solicitation will be issued as a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses through request for proposal procedures. The prime contractor must perform at least 15-25% of the contract cost using its own employees or employees of other eligible SDVOSBs. Interested offerors must be registered in the System for Award Management database and Vendor Information Pages database with Center for Veterans Enterprise verification by the time of proposal submission. The estimated construction cost is between $500,000 to $1 million.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Installation of Additional Environmental Monitors, newest first.
File Type Posted
S04 Site Visit Sign-In Sheet (06.17.2021).pdf PDF
36C25621R0131 0001.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
MANUAL Setra Installation and Operating Manual.pdf PDF
PHOTO 4CC01A.jpg JPG image
PHOTO 4BC02.jpg JPG image
DRAWING 1AI102 M1 IP OVERALL SECOND FLOOR PLAN.pdf PDF
DRAWING 1A104-QUESTION MARK M3 IP OVERALL FOURTH FLOOR PLAN.pdf PDF
26 05 11 Requirements for Electrical Installations.pdf PDF
01 45 00 Quality Control.pdf PDF
GENERAL DECISION NUMBER LA20210041.pdf PDF
36C25621R0131 SOL.docx DOCX document
EXHIBIT G LIST OF RETURNABLES.docx DOCX document
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
DRAWING 2AI104-D2 M4 DNT FOURTH FLOOR PLAN - AREA D1 AND D2.pdf PDF
DRAWING 2AI103-D2 M5 DNT THIRD FLOOR PLAN - AREA D1 AND D2.pdf PDF
DRAWING 2AI102-G2 M8 DNT SECOND FLOOR PLAN - AREA G1 AND G2.pdf PDF
DRAWING 1AI103-QUESTION MARK M2 IP OVERALL THIRD FLOOR PLAN.pdf PDF
26 05 33 Raceway and Boxes for Electrical Systems.pdf PDF
23 09 23 Direct Digital Control System For HVAC.pdf PDF
01 42 19 Reference Standards.pdf PDF
Justification and Approval (Brand Name).pdf PDF
DRAWING 2AI104-E2 M7 DNT FOURTH FLOOR PLAN - AREA E1 AND E2.pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
JCI Temperature Humidity Sensor Cutsheet.pdf PDF
CUTSHEET Serta Room Pressure Monitor Cutsheet.pdf PDF
DRAWING 8AS103 M9 RESEARCH THIRD FLOOR PLAN.pdf PDF
DRAWING 2AI102-F2 M10 DNT SECOND FLOOR PLAN - AREA F1 AND F2.pdf PDF
DRAWING 1AI104-C1 IP Fourth Wall Types Building C1.pdf PDF
DRAWING 1AI104-B1 IP Fourth Wall Types Building B1.pdf PDF
2AI102-E2 M6 DNT SECOND FLOOR PLAN -AREA E1 AND E2.pdf PDF
09 29 00 Gypsum Board.pdf PDF
07 84 00 Firestopping.pdf PDF
01 35 26 Safety Requirements.pdf PDF
ICRA ILSM.xlsx XLSX spreadsheet
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
DRAWING 1AI104-B2 IP Fourth Wall Types Building B2.pdf PDF
CHART M11 Environmental Monitor Room Location List.pdf PDF
26 05 19 Low Voltage Electrical Power Conductors and Cables 600 Volts and Below.pdf PDF
23 05 11 Common Work Results for HVAC.pdf PDF
09 91 00 Painting.pdf PDF
02 41 00 Demolition.pdf PDF
01 33 23 Shop Drawings Product Data and Samples.pdf PDF
01 00 00 General Requirements.pdf PDF
00 01 10 Table of Contents.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25621R0131

INSTALLATION OF ADDITIONAL ENVIRONMENTAL MONITORS

Statement of Work

Installation of Additional Environmental Monitors Project # 629-21-102

1. BACKGROUND:

The current VA facility was constructed as a hospital to address Veterans patient care needs in the New Orleans, Louisiana area. During March 2020, the Inpatient Building HVAC Mechanical systems were temporarily modified to create negative air pressure differentials at entries to the Patient wards. This action was needed for employee safety and infection control due to the COVID-19 pandemic.

This project is the construction to install additional room pressure monitors and temperature/humidity monitors to correct inspection findings. In addition, this will reduce current manpower requirements for manually logging environmental conditions in Medical Supply and Reusable Medical Equipment (RME) storage locations. By automating the temperature and humidity readings, it will allow nursing numerous hours to dedicate to patient care that are currently used to manually log and review temperature and humidity readings. This project will also include an upgrade of the Building Automation System (BAS) server to support adding additional data points to the existing Johnson Controls System.

2. PLACE OF PERFORMANCE:

The place of performance is located at Southeast Louisiana Veterans Health Care System, 2400 Canal Street, New Orleans, LA. 70119.

3. PERIOD OF PERFORMANCE AND COORDINATION:

a) Work shall be performed during normal business hours when it does not interfere with building operations. When work will interfere with building operations it shall be performed after normal business hours or weekends. Normal business hours are between the hours of 7:30 a.m. to 4:00 p.m., Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closing.

b) The Contractor shall complete all work required under this Statement of Work (SOW) within 104 calendar days of issuance of the Notice-To-Proceed.

c) Work shall not be considered complete until accepted by the Contracting Officer.

d) No parking is guaranteed on site. Parking is as space allows in the Patient Garage on

Galvez Street, above Level 5.

e) This contract type shall be a firm-fixed price.

f) There will not be made available areas at the VA for contractor storage of materials.

4. GENERAL:

a) The contractor or vendor shall provide all labor, materials, tools, equipment and supervision necessary to complete the work outlined in this Statement of Work (SOW). This shall include hiring and providing all required sub-contractors with experience in the principal trades and expertise described.

b) The contractor or subcontractor performing this work shall have no fewer than three (3) years of experience with the specified products. This shall include projects installing room pressure monitors, temperature/humidity sensors and Johnson building automation controls. Room pressure monitors shall be certified by a SERTA factory service professional.

c) The construction shall be in accordance with and meet the following general requirements:

i. Follow all applicable VA Design Guides and Manuals.

ii. The contractor is highly recommended to visit the site to review the existing conditions and proposed work prior to submitting any proposals to construct the project. Verify all existing dimensions, BAS systems, materials and equipment.

iii. Refer to attached drawings provided for room locations and recommended quantities as part of the scope of work.

iv. Work shall be in accordance with the plans and specifications attached to this statement of work.

v. The work shall include, but not limited to room pressure monitor additions, temperature/humidity sensor additions, electrical wiring, temperature control wiring, temperature control additions to BAS including graphics, dry wall demolition and construction, painting and final testing of all new products.

vi. Any proposals must include all work to provide a complete and finished product. When work is completed with this project, it is expected the Government will be able to take full benefit of the finished product without additional work required.

vii. Provide a warranty for one year on all work (materials, equipment and labor) effective after all work has been accepted by the VA.

viii. The project superintendent shall be dedicated to work on site for this specific project only.

ix. The contractor shall have daily briefings with the COR to discuss planned construction activities for each day. This is to include detailing the personnel on site and the tasks involved.

x. A weekly construction schedule shall be provided to the COR noting the up to date progress of construction. In addition, a two week look ahead shall be provided at the end of each work week.

xi. The project site shall be cleaned up at the end of each day of construction debris in the work site area. All debris shall be disposed of off the VA site. The Superintendent shall walk and inspect the work areas at the end of each day before leaving the site to note the existing conditions and work completed.

xii. A phasing plan for each area of construction shall be proposed one week before work is to proceed in those specific planned areas. This shall include detailing infection control and closing normal traffic access to spaces. Refer to Quality Control specification.

xiii. New dry walls shall be constructed to match existing wall types, including any 2-hour rated fire walls.

xiv. New walls constructed shall be painted to match existing. Painting shall include the entire side of existing walls adjacent to new dry walls.

xv. The government will issue non-PIV badges for contractors expected to work at least 30 consecutive days. Access to the site will be limited to the areas of construction and public areas only. Otherwise, a visitor’s badge will be issued as needed for others with an PIV escort to be required. A VA escort will provide access to required locked spaces when needs should arise.

5. ROOM PRESSURE MONITORS & TEMPERATURE / HUMIDITY SENSORS SCOPE:

a) Provide and install additional environmental monitors per plans and specifications.

b) Provide and install Serta Model SRPM OR1WBA2E Room Pressure Monitor, BACnet capable, +-0.10” w.c. for measuring low differential pressure in critical applications. Install at elevation with centerline of monitor at 62” AFF.

c) Provide and install Serta Model RPS Remote Pressure Snubber for each new monitor.

d) Provide and install Johnson Controls vertical wall box mounted or surface mounted NS

Series Network Sensor with LCD electronic zone sensor. Temperature measurement range -

32 deg. F to 104 deg. F, Humidity measurement range – 0% to 10% RH. Sensors shall monitor the temperature setpoint, zone temperature and humidity, and transmit this data to a field controller. Initial set point to be 72 degrees, 50% relative humidity. Install at elevation with centerline of sensor at 48” AFF.

e) Provide submittals and wiring / control diagrams for VA approval of all proposed products before installation.

f) Install all monitors per manufacturers installation manual and instructions.

g) All room pressure monitors shall be certified in writing to be accurate and without defect by a

Serta manufacturer’s service professional experienced with this product. Final required set points (positive or negative) for all monitors will be provided by the VA to the contractor before installation is complete.

h) Provide and install electrical conduit, wiring, air tubing and control wiring necessary for proper operation of all new environmental monitors. All work inside of walls shall be routed in conduit. At no time can wiring be run exposed inside walls.

i) Coordinate with the COR for available existing electrical and temperature controls connection points for power sources above ceiling for all new environmental monitors.

j) Refer to attached floor plans, M1 thru M10, for environmental monitor locations. Refer to attached Environmental Monitor Room Location List, M11, for required quantity of monitors.

k) Provide dry wall demolition to access behind walls for routing of new electrical conduit, wiring and air pressure tubes. New walls shall be installed with same rating type and mold/moisture resistant construction as existing walls.

l) All new walls shall be painted to match existing. This shall include the entire side of walls affected by the scope. Paint with primer and two coats. Paint shall match existing colors at the facility (Sherwin-Williams OC-17 White Dove and Sherwin-Williams AF-100 Pashmina).

Coordinate with the COR before start of work.

m) Phasing of work shall be planned for each area of hospital where patients and staff will be affected. Inform and coordinate with the VA two weeks ahead for any planned obstructions in

Corridors for Infection Control measures to mitigate dust and debris.

n) The contractor shall notify and coordinate with the VA one week in advance of any planned electrical outages.

6. BUILDING AUTOMATION SYSTEM (BAS) SCOPE:

a) Provide and install an upgrade to the existing VA Campus Johnson Controls building automation system. This shall include upgrading to the latest version of Johnson Controls

Metasys 11. Provide and install all materials, labor and services required for a complete operating system at conclusion of work. The contractor shall verify all components and quantities of the existing BAS. The COR shall be contacted for anything outside of the scope of work found to be necessary not mentioned in this solicitation.

This upgrade shall include the following at a minimum:

• (2 ea) Updating the current unsupported Metasys 7.0 ADX version of Window SQL server software to Metasys 11 ADX server software with Fault Detection and Diagnostics and Fault Detection Diagnostics Triage.

• (23 ea) Updating the current unsupported Metasys 7.0 NAE version of Window WES7 Kernel to Metasys 11 Linux Kernel to close the “wormable” RDP ports.

• (57 ea) Updating the current unsupported Metasys 7.0 NCE version of Window CE Kernel to Metasys 11 Linux Kernel to close the “wormable” RDP ports.

• (1 ea) Replace damaged NAE8500 with a new NAE8500.

• (2 ea) Three-year software subscription.

• (1 ea) New MUI graphics for entire site.

• (20 ea) A fully TLS 1.2 encrypted network.

• (2 ea) Updating the current unsupported Metasys 7.0 ADX version of Window SQL server software to Metasys 11 server software NAE8500.

• (2 ea) Labor to update the ADX Server SW.

• (2 ea) Labor to update the NAE8500 Server SW.

• 8 hours training. This shall include at a minimum basic operating system changes, graphics, reporting, trending, icons, updates and new techniques.

b) Provide and install at the VA BAS front end workstations new graphics similar to the existing displays for all new environmental monitors. This should include at a minimum the monitor set points, space readings, trending history and alarms. Provide and install all required control work connections to existing controllers, panels and network for communication and reporting of all new additional environmental monitors.

c) Provide submittals and wiring / control diagrams for VA approval of all proposed products before installation.

d) The existing servers are located in the CEP Electrical Room 2N133.

7. SPECIFICATIONS INDEX:

a) 00 01 10 Table of Contents

b) 01 00 00 General Requirements

c) 01 33 23 Shop Drawings, Product Data, and Samples

d) 01 35 26 Safety Requirements

e) 01 42 19 Reference Standards

f) 01 45 00 Quality Control

g) 02 41 00 Demolition

h) 07 84 00 Firestopping

i) 09 29 00 Gypsum Board

j) 09 91 00 Painting

k) 23 05 11 Common Work Results for HVAC

l) 26 05 11 Requirements for Electrical Installations

m) 26 05 19 Low-Voltage Electrical Power Conductors and Cables

n) 26 05 33 Raceway and Boxes for Electrical Systems

8. DRAWINGS & IMAGE INDEX:

a) M1 IP Overall Second Floor Plan

b) M2 IP Overall Third Floor Plan

c) M3 IP Overall Fourth Floor Plan

d) M4 DNT Fourth Floor Plan – Area D1 and D2

e) M5 DNT Third Floor Plan – Area D1 and D2

f) M6 DNT Second Floor Plan – Area E1 and E2

g) M7 DNT Fourth Floor Plan – Area E1 and E2

h) M8 DNT Second Floor Plan – Area G1 and G2

i) M9 Research Third Floor Plan

j) M10 DNT Second Floor Plan – Area F1 and F2

k) M11 Environmental Monitor Room Location List

l) IP Fourth Wall Types Building B1

m) IP Fourth Wall Types Building B2

n) IP Fourth Wall Types Building C1

o) Image 4BC02

p) Image 4CC01A

9. PRODUCT CUTSHEET INDEX:

a) SERTA Room Pressure Monitor Cut Sheet

b) SERTA Installation and Operating Manual

c) Johnson Controls Temperature / Humidity Sensor Cut Sheet

File details come from the government source that posted it. Updated .