01 33 23 Shop Drawings Product Data and Samples.pdf

PDF 87 KB Posted

Attached to
Z1DA--Installation of Additional Environmental Monitors Federal contract opportunity
Solicitation number
36C25621R0131
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document includes a presolicitation notice for the installation of additional environmental monitors and a specification section related to shop drawings, product data, and samples. The presolicitation notice is for the Southeast Louisiana Veterans Health Care System project to install additional environmental monitors with a budget between $500,000 to $1,000,000. The primary NAICS code is 238220 and small business size standard is $16.5 million. The solicitation will be issued on or around June 4, 2021 on beta.SAM.gov. The specification section provides requirements and procedures for submittals including shop drawings, product data, test reports, manufacturer's instructions, and operation and maintenance data. Submittals must be scheduled and approved prior to acquiring materials or equipment to avoid delays.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Installation of Additional Environmental Monitors, newest first.
File Type Posted
S04 Site Visit Sign-In Sheet (06.17.2021).pdf PDF
36C25621R0131 0001.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
MANUAL Setra Installation and Operating Manual.pdf PDF
PHOTO 4CC01A.jpg JPG image
PHOTO 4BC02.jpg JPG image
DRAWING 1AI102 M1 IP OVERALL SECOND FLOOR PLAN.pdf PDF
DRAWING 1A104-QUESTION MARK M3 IP OVERALL FOURTH FLOOR PLAN.pdf PDF
26 05 11 Requirements for Electrical Installations.pdf PDF
01 45 00 Quality Control.pdf PDF
GENERAL DECISION NUMBER LA20210041.pdf PDF
36C25621R0131 SOL.docx DOCX document
EXHIBIT G LIST OF RETURNABLES.docx DOCX document
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
DRAWING 2AI104-D2 M4 DNT FOURTH FLOOR PLAN - AREA D1 AND D2.pdf PDF
DRAWING 2AI103-D2 M5 DNT THIRD FLOOR PLAN - AREA D1 AND D2.pdf PDF
DRAWING 2AI102-G2 M8 DNT SECOND FLOOR PLAN - AREA G1 AND G2.pdf PDF
DRAWING 1AI103-QUESTION MARK M2 IP OVERALL THIRD FLOOR PLAN.pdf PDF
26 05 33 Raceway and Boxes for Electrical Systems.pdf PDF
23 09 23 Direct Digital Control System For HVAC.pdf PDF
01 42 19 Reference Standards.pdf PDF
Justification and Approval (Brand Name).pdf PDF
DRAWING 2AI104-E2 M7 DNT FOURTH FLOOR PLAN - AREA E1 AND E2.pdf PDF
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
DRAWING 1AI104-B2 IP Fourth Wall Types Building B2.pdf PDF
CHART M11 Environmental Monitor Room Location List.pdf PDF
26 05 19 Low Voltage Electrical Power Conductors and Cables 600 Volts and Below.pdf PDF
23 05 11 Common Work Results for HVAC.pdf PDF
09 91 00 Painting.pdf PDF
02 41 00 Demolition.pdf PDF
01 00 00 General Requirements.pdf PDF
00 01 10 Table of Contents.pdf PDF
SOW (Final).pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
JCI Temperature Humidity Sensor Cutsheet.pdf PDF
CUTSHEET Serta Room Pressure Monitor Cutsheet.pdf PDF
DRAWING 8AS103 M9 RESEARCH THIRD FLOOR PLAN.pdf PDF
DRAWING 2AI102-F2 M10 DNT SECOND FLOOR PLAN - AREA F1 AND F2.pdf PDF
DRAWING 1AI104-C1 IP Fourth Wall Types Building C1.pdf PDF
DRAWING 1AI104-B1 IP Fourth Wall Types Building B1.pdf PDF
2AI102-E2 M6 DNT SECOND FLOOR PLAN -AREA E1 AND E2.pdf PDF
09 29 00 Gypsum Board.pdf PDF
07 84 00 Firestopping.pdf PDF
01 35 26 Safety Requirements.pdf PDF
ICRA ILSM.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05-01-17

01 33 23 - 1

SECTION 01 33 23

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

PART 1 – GENERAL

1.1 DESCRIPTION

A. This specification defines the general requirements and procedures for submittals. A submittal is information submitted for VA review to establish compliance with the contract documents.

B. Detailed submittal requirements are found in the technical sections of the contract specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective technical specifications at no additional cost to the government.

C. VA approval of a submittal does not relieve the Contractor of the responsibility for any error which may exist. The Contractor is responsible for fully complying with all contract requirements and the satisfactory construction of all work, including the need to check, confirm, and coordinate the work of all subcontractors for the project.

Non-compliant material incorporated in the work will be removed and replaced at the Contractor’s expense.

1.2 DEFINITIONS

A. Shop Drawings: Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be integrated and coordinated.

B. Product Data: Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions, and brochures, which describe and illustrate size, physical appearance, and other characteristics of materials, systems, or equipment for some portion of the work.

C. Test Reports: Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work. Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

D. Manufacturer's Instructions: Pre-printed material describing installation of a product, system, or material, including special notices and MSDS concerning impedances, hazards, and safety precautions.

E. Manufacturer's Field Reports: Documentation of the testing and verification actions taken by manufacturer's representative at the job

05-01-17

01 33 23 - 2 site on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must indicate whether the material, product, or system has passed or failed the test.

F. Operation and Maintenance Data: Manufacturer data that is required to operate, maintain, troubleshoot, and repair equipment, including manufacturer's help, parts list, and product line documentation. This data shall be incorporated in an operations and maintenance manual.

G. Closeout Submittals: Documentation necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a phase of construction on a multi-phase contract.

1.3 SUBMITTAL SCHEDULING

A. Submittals are to be scheduled, submitted, reviewed, and approved prior to the acquisition of the material or equipment.

B. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow time for potential resubmittal.

C. No delay costs or time extensions will be allowed for time lost in late submittals or resubmittals.

D. All submittals are required to be approved prior to the start of the specified work activity.

1.4 OPERATION AND MAINTENANCE DATA

A. Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.

1.5 APPROVED SUBMITTALS

A. The VA approval of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing, and other information are satisfactory.

- - - E N D - - -

PART 1 – GENERAL

File details come from the government source that posted it. Updated .