EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx

DOCX document 30 KB Posted

Attached to
Z1DA--Installation of Additional Environmental Monitors Federal contract opportunity
Solicitation number
36C25621R0131
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document contains a past performance questionnaire and notice of a federal contract opportunity for the installation of additional environmental monitors. The past performance questionnaire is for a contractor to provide to references on a previous contract for installation of environmental controls. It requests ratings on a scale of 1 to 6 for 21 performance categories and asks references to provide remarks on any ratings of 1 or 2. The related federal contract opportunity is to install additional environmental monitors at the Southeast Louisiana Veterans Health Care System in New Orleans, with an estimated value between $500,000 and $1,000,000. The work must be performed by June 4, 2021. The opportunity is open only to verified Service-Disabled Veteran-Owned Small Businesses. Interested contractors must register in the Vendor Information Pages database and System for Award Management to be considered for award.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Installation of Additional Environmental Monitors, newest first.
File Type Posted
S04 Site Visit Sign-In Sheet (06.17.2021).pdf PDF
36C25621R0131 0001.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
MANUAL Setra Installation and Operating Manual.pdf PDF
PHOTO 4CC01A.jpg JPG image
PHOTO 4BC02.jpg JPG image
DRAWING 1AI102 M1 IP OVERALL SECOND FLOOR PLAN.pdf PDF
DRAWING 1A104-QUESTION MARK M3 IP OVERALL FOURTH FLOOR PLAN.pdf PDF
26 05 11 Requirements for Electrical Installations.pdf PDF
01 45 00 Quality Control.pdf PDF
GENERAL DECISION NUMBER LA20210041.pdf PDF
36C25621R0131 SOL.docx DOCX document
EXHIBIT G LIST OF RETURNABLES.docx DOCX document
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
DRAWING 2AI104-D2 M4 DNT FOURTH FLOOR PLAN - AREA D1 AND D2.pdf PDF
DRAWING 2AI103-D2 M5 DNT THIRD FLOOR PLAN - AREA D1 AND D2.pdf PDF
DRAWING 2AI102-G2 M8 DNT SECOND FLOOR PLAN - AREA G1 AND G2.pdf PDF
DRAWING 1AI103-QUESTION MARK M2 IP OVERALL THIRD FLOOR PLAN.pdf PDF
26 05 33 Raceway and Boxes for Electrical Systems.pdf PDF
23 09 23 Direct Digital Control System For HVAC.pdf PDF
01 42 19 Reference Standards.pdf PDF
Justification and Approval (Brand Name).pdf PDF
DRAWING 2AI104-E2 M7 DNT FOURTH FLOOR PLAN - AREA E1 AND E2.pdf PDF
DRAWING 1AI104-B2 IP Fourth Wall Types Building B2.pdf PDF
CHART M11 Environmental Monitor Room Location List.pdf PDF
26 05 19 Low Voltage Electrical Power Conductors and Cables 600 Volts and Below.pdf PDF
23 05 11 Common Work Results for HVAC.pdf PDF
09 91 00 Painting.pdf PDF
02 41 00 Demolition.pdf PDF
01 33 23 Shop Drawings Product Data and Samples.pdf PDF
01 00 00 General Requirements.pdf PDF
00 01 10 Table of Contents.pdf PDF
SOW (Final).pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
JCI Temperature Humidity Sensor Cutsheet.pdf PDF
CUTSHEET Serta Room Pressure Monitor Cutsheet.pdf PDF
DRAWING 8AS103 M9 RESEARCH THIRD FLOOR PLAN.pdf PDF
DRAWING 2AI102-F2 M10 DNT SECOND FLOOR PLAN - AREA F1 AND F2.pdf PDF
DRAWING 1AI104-C1 IP Fourth Wall Types Building C1.pdf PDF
DRAWING 1AI104-B1 IP Fourth Wall Types Building B1.pdf PDF
2AI102-E2 M6 DNT SECOND FLOOR PLAN -AREA E1 AND E2.pdf PDF
09 29 00 Gypsum Board.pdf PDF
07 84 00 Firestopping.pdf PDF
01 35 26 Safety Requirements.pdf PDF
ICRA ILSM.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project No. 629-21-102 Installation of Additional Environmental Controls 36C25621R0131

EXHIBIT B

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

INSTRUCTIONS TO CONTRACTOR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions, below.

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named below is submitting an offer for a United States Department of Veterans Affairs contract requirement, and has sent this form to you, in your role as a past performance reference contact. Please complete this form in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contract Specialist via postal mail or email, directly to:

Department of Veterans Affairs NCO 16 Contracting Office Attn: Bill Geary, Contract Specialist REF: 36C25621R0131 400 Veterans Avenue, Bldg. T-102, Room A106 Biloxi, MS 39531 Email Address: bill.geary@va.gov

Please return the completed form no later than the time set for receipt of proposals. If you have any questions, please contact Mr. Geary via email. Thank you for your assistance in this matter.

GENERAL INFORMATION [completed by Contractor]

Contractor Company Name

Street Address

Contractor Point of Contact Name

City

Point of Contact Phone Number

State

Reference Project Title

Zip Code

Contract Period of Performance (start to finish):

Email

Contract Number

Contract Dollar Value

Description of Work

Role of Contractor on This Project (check appropriate box) ☐ Prime Contractor ☐ Sub-contractor ☐ Key Personnel

RESPONDENT INFORMATION [completed by Reference Contact]

Company Name

Street Address

POC Name

City

Phone Number

State

Fax Number

Zip Code

Email

PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 6 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2 in the Remarks section, below (text box will expand to whatever extent is necessary).

1
2
3
4
5
6
UNSATISFACTORY
MARGINAL
SATISFACTORY
VERY GOOD
EXCEPTIONAL
NEUTRAL
Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.
Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner.
No record of past performance or the record is inconclusive.[endnoteRef:1] [1: Respondent Signature]
The Contractor …
1
2
3
4
5
6
1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
☐☐☐☐☐☐
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
☐☐☐☐☐☐
3.
Delegated authority to project managers and supervisors commensurate with contract requirements.
☐☐☐☐☐☐
4.
Home office participated in solving significant local problems.
☐☐☐☐☐☐
5.
Followed approved quality control plan.
☐☐☐☐☐☐
6.
Provided effective quality control and/or inspection procedures to meet contract requirements.
☐☐☐☐☐☐
7.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
☐☐☐☐☐☐
8.
Provided timely resolution of contract discrepancies
☐☐☐☐☐☐
9.
Identified problems as they occurred.
☐☐☐☐☐☐
10.
Suggested alternative approaches to problems.
☐☐☐☐☐☐
11.
Displayed initiative to solve problems.
☐☐☐☐☐☐
12.
Developed realistic progress schedules.
☐☐☐☐☐☐
13.
Met established project schedules.
☐☐☐☐☐☐
14.
Provided timely resolution of warranty defects.
☐☐☐☐☐☐
15.
Was responsive to contract changes.
☐☐☐☐☐☐
16.
Provided adequate project supervision.
☐☐☐☐☐☐
17.
Obtained consent of surety for increases in bonding as work-in-progress increased.
☐☐☐☐☐☐
18.
Paid subcontractors/suppliers in a timely manner.
☐☐☐☐☐☐
19.
Provided accurate and complete line item cost proposals including all aspects of work required for each task.
☐☐☐☐☐☐
20.
Cooperated with Government personnel after award.
☐☐☐☐☐☐
21.
How would you rate the contractor's overall performance?
☐☐☐☐☐☐
22.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
☐YES
☐NO
23
Would you award another contract to this contractor? If not, please explain in “remarks.”
☐YES
☐NO
24
To the best of your knowledge, is the contractor rated in CPARS?
☐YES
☐NO

REMARKS (Please use as much space as is needed – the box will expand as you type).

File details come from the government source that posted it. Updated .