07 84 00 Firestopping.pdf

PDF 118 KB Posted

Attached to
Z1DA--Installation of Additional Environmental Monitors Federal contract opportunity
Solicitation number
36C25621R0131
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document contains a technical specification for firestopping and a notice of a federal contract opportunity for the installation of additional environmental monitors.

The technical specification outlines requirements for firestopping systems to maintain the fire resistance of walls and partitions at openings. It specifies testing and certification standards for through-penetration firestop systems and firestop devices. Product data and manufacturer instructions must be submitted, along with inspection reports. Firestopping sealants must be non-toxic and contain no hazardous chemicals or volatile organic compounds above limits. Installation must follow approved details and the work will undergo inspections.

The federal contract opportunity is a presolicitation notice for a project to install additional environmental monitors at the Southeast Louisiana Veterans Health Care System between $500,000 to $1,000,000. The NAICS code is 238220 and it is open only to verified Service-Disabled Veteran-Owned Small Businesses. Interested offerors should check the beta.SAM website for the official solicitation and any amendments. The response due date and other details will be provided in the forthcoming solicitation. The contracting officer is Bill Geary.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Installation of Additional Environmental Monitors, newest first.
File Type Posted
S04 Site Visit Sign-In Sheet (06.17.2021).pdf PDF
36C25621R0131 0001.docx DOCX document
EXHIBIT E SURETY FORM.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
JCI Temperature Humidity Sensor Cutsheet.pdf PDF
CUTSHEET Serta Room Pressure Monitor Cutsheet.pdf PDF
DRAWING 8AS103 M9 RESEARCH THIRD FLOOR PLAN.pdf PDF
DRAWING 2AI102-F2 M10 DNT SECOND FLOOR PLAN - AREA F1 AND F2.pdf PDF
DRAWING 1AI104-C1 IP Fourth Wall Types Building C1.pdf PDF
DRAWING 1AI104-B1 IP Fourth Wall Types Building B1.pdf PDF
2AI102-E2 M6 DNT SECOND FLOOR PLAN -AREA E1 AND E2.pdf PDF
09 29 00 Gypsum Board.pdf PDF
01 35 26 Safety Requirements.pdf PDF
ICRA ILSM.xlsx XLSX spreadsheet
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
MANUAL Setra Installation and Operating Manual.pdf PDF
PHOTO 4CC01A.jpg JPG image
PHOTO 4BC02.jpg JPG image
DRAWING 1AI102 M1 IP OVERALL SECOND FLOOR PLAN.pdf PDF
DRAWING 1A104-QUESTION MARK M3 IP OVERALL FOURTH FLOOR PLAN.pdf PDF
26 05 11 Requirements for Electrical Installations.pdf PDF
01 45 00 Quality Control.pdf PDF
GENERAL DECISION NUMBER LA20210041.pdf PDF
36C25621R0131 SOL.docx DOCX document
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
DRAWING 1AI104-B2 IP Fourth Wall Types Building B2.pdf PDF
CHART M11 Environmental Monitor Room Location List.pdf PDF
26 05 19 Low Voltage Electrical Power Conductors and Cables 600 Volts and Below.pdf PDF
23 05 11 Common Work Results for HVAC.pdf PDF
09 91 00 Painting.pdf PDF
02 41 00 Demolition.pdf PDF
01 33 23 Shop Drawings Product Data and Samples.pdf PDF
01 00 00 General Requirements.pdf PDF
00 01 10 Table of Contents.pdf PDF
SOW (Final).pdf PDF
EXHIBIT G LIST OF RETURNABLES.docx DOCX document
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
DRAWING 2AI104-D2 M4 DNT FOURTH FLOOR PLAN - AREA D1 AND D2.pdf PDF
DRAWING 2AI103-D2 M5 DNT THIRD FLOOR PLAN - AREA D1 AND D2.pdf PDF
DRAWING 2AI102-G2 M8 DNT SECOND FLOOR PLAN - AREA G1 AND G2.pdf PDF
DRAWING 1AI103-QUESTION MARK M2 IP OVERALL THIRD FLOOR PLAN.pdf PDF
26 05 33 Raceway and Boxes for Electrical Systems.pdf PDF
23 09 23 Direct Digital Control System For HVAC.pdf PDF
01 42 19 Reference Standards.pdf PDF
Justification and Approval (Brand Name).pdf PDF
DRAWING 2AI104-E2 M7 DNT FOURTH FLOOR PLAN - AREA E1 AND E2.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-01-21

07 84 00 - 1

SECTION 07 84 00

FIRESTOPPING

PART 1 - GENERAL

1.1 DESCRIPTION

A. Provide UL or equivalent approved firestopping system for the closures of openings in walls against penetration of flame, heat, and smoke or gases in fire resistant rated construction.

B. Provide UL or equivalent approved firestopping system for the closure of openings in walls against penetration of gases or smoke in smoke partitions.

1.2 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Manufacturers literature, data, and installation instructions for types of firestopping and smoke stopping used.

C. List of FM, UL, or WH classification number of systems installed.

D. Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use.

E. Submit certificates from manufacturer attesting that firestopping materials comply with the specified requirements.

1.3 DELIVERY AND STORAGE

A. Deliver materials in their original unopened containers with manufacturer’s name and product identification.

B. Store in a location providing protection from damage and exposure to the elements.

1.4 QUALITY ASSURANCE

A. FM, UL, or WH or other approved laboratory tested products will be acceptable.

1.5 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.

B. ASTM International (ASTM):

E84-20..................Surface Burning Characteristics of Building

Materials

07 84 00 - 2

E699-16.................Standard Specification for Agencies Involved in

Testing, Quality Assurance, and Evaluating of

Manufactured Building Components

E814-13a(2017)..........Fire Tests of Penetration Firestop Systems

E2174-20a...............Standard Practice for On-Site Inspection of

Installed Firestop Systems

E2393-20................Standard Practice for On-Site Inspection of

Installed Fire Resistive Joint Systems and

Perimeter Fire Barriers

C. FM Global (FM):

Annual Issue Approval Guide Building Materials

4991-13.................Approval of Firestop Contractors

D. Underwriters Laboratories, Inc. (UL):

Annual Issue Building Materials Directory

E. Environmental Protection Agency (EPA):

40 CFR 59(2014).........National Volatile Organic Compound Emission

Standards for Consumer and Commercial Products

PART 2 - PRODUCTS

2.1 FIRESTOP SYSTEMS

A. Provide either factory built (Firestop Devices) or field erected

(through-Penetration Firestop Systems) to form a specific building system maintaining required integrity of the fire barrier and stop the passage of gases or smoke. Firestop systems to accommodate building movements without impairing their integrity.

B. Through-penetration firestop systems and firestop devices tested in accordance with ASTM E814 or UL 1479 using the "F" or "T" rating to maintain the same rating and integrity as the fire barrier being sealed. "T" ratings are not required for penetrations smaller than or equal to 4 inches nominal pipe or 16 square inches in overall cross sectional area.

C. Firestop sealants used for firestopping or smoke sealing to have the following properties:

1. Contain no flammable or toxic solvents.

2. Release no dangerous or flammable out gassing during the drying or curing of products.

3. Water-resistant after drying or curing and unaffected by high humidity, condensation or transient water exposure.

07 84 00 - 3

4. When installed in exposed areas, capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.

5. VOC Content: Firestopping sealants and sealant primers to comply with the following limits for VOC content when calculated according to 40 CFR 59, (EPA Method 24):

a. Sealants: 250 g/L.

b. Sealant Primers for Nonporous Substrates: 250 g/L.

c. Sealant Primers for Porous Substrates: 775 g/L.

D. Firestopping system or devices used for penetrations by plastic pipe or conduits, unenclosed cables, or other non-metallic materials to have following properties:

1. Classified for use with the particular type of penetrating material used.

2. Penetrations containing loose electrical cables, computer data cables, and communications cables protected using firestopping systems that allow unrestricted cable changes without damage to the seal.

E. Maximum flame spread of 25 and smoke development of 50 when tested in accordance with ASTM E84 or UL 723. Material to be an approved firestopping material as listed in UL Fire Resistance Directory or by a nationally recognized testing laboratory.

F. FM, UL, or WH rated or tested by an approved laboratory in accordance with ASTM E814.

G. Materials to be nontoxic and noncarcinogen at all stages of application or during fire conditions and to not contain hazardous chemicals.

Provide firestop material that is free from Ethylene Glycol, PCB, MEK, and asbestos.

H. For firestopping exposed to view, traffic, moisture, and physical damage, provide products that do not deteriorate when exposed to these conditions.

1. For piping penetrations for plumbing and wet-pipe sprinkler systems, provide moisture-resistant through-penetration firestop systems.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Submit product data and installation instructions, as required by article, submittals, after an on-site examination of areas to receive firestopping.

07 84 00 - 4

B. Examine substrates and conditions with installer present for compliance with requirements for opening configuration, penetrating items, substrates, and other conditions affecting performance of firestopping.

Do not proceed with installation until unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Remove dirt, grease, oil, laitance and form-release agents from concrete, loose materials, or other substances that prevent adherence and bonding or application of the firestopping or smoke stopping materials.

B. Prime substrates where required by joint firestopping system manufacturer using that manufacturer’s recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces.

C. Masking Tape: Apply masking tape to prevent firestopping from contacting adjoining surfaces that will remain exposed upon completion of work and that would otherwise be permanently stained or damaged by such contact or by cleaning methods used to remove smears from firestopping materials. Remove tape as soon as it is possible to do so without disturbing seal of firestopping with substrates.

3.3 INSTALLATION

A. Do not begin firestopping work until the specified material data and installation instructions of the proposed firestopping systems have been submitted and approved.

B. Install firestopping systems with smoke stopping in accordance with FM, UL, WH, or other approved system details and installation instructions.

C. Install smoke stopping seals in smoke partitions.

3.4 CLEAN-UP

A. As work is completed, remove materials, litter, and debris.

B. Clean up spills of liquid type materials.

C. Clean off excess fill materials and sealants adjacent to openings and joints as work progresses by methods and with cleaning materials approved by manufacturers of firestopping products and of products in which opening and joints occur.

D. Protect firestopping during and after curing period from contact with contaminating substances or from damage resulting from construction operations or other causes so that they are without deterioration or damage at time of Substantial Completion. If, despite such protection, 07 84 00 - 5 damage or deterioration occurs, cut out and remove damaged or deteriorated firestopping immediately and install new materials to provide firestopping complying with specified requirements.

3.5 INSPECTIONS AND ACCEPTANCE OF WORK

A. Do not conceal or enclose firestop assemblies until inspection is complete and approved by the Contracting Officer Representative (COR).

B. Furnish service of approved inspector to inspect firestopping in accordance with ASTM E2393 and ASTM E2174 for firestop inspection, and document inspection results. Submit written reports indicating locations of and types of penetrations and type of firestopping used at each location; type is to be recorded by UL listed printed numbers.

- - - E N D - - -

SECTION 07 84 00 FIRESTOPPING
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 SUBMITTALS
1.3 DELIVERY AND STORAGE
1.4 QUALITY ASSURANCE
1.5 APPLICABLE PUBLICATIONS
PART 2 - PRODUCTS
2.1 FIRESTOP SYSTEMS
PART 3 - EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.3 INSTALLATION
3.4 CLEAN-UP
3.5 INSPECTIONS AND ACCEPTANCE OF WORK