This Statement of Work (SOW) details a garage door repair and replacement project for the Boulder Ranger District of the U.S. Forest Service in Nederland, Colorado. The project encompasses a comprehensive overhaul of six 10'x10' garage doors, including full servicing of barrel and hood components, removal and replacement of five industrial duty hoist operators, and installation of five commercial grade infrared safety sensor systems. The work must be completed between August 25, 2025, and February 28, 2026, with all activities restricted to 0800-1700 hours, Monday through Friday, and must not interfere with Forest Service fire operations.

Key technical requirements include installing components in compliance with state and federal regulations, using LiftMaster or equivalent parts, ensuring 100% functionality through system testing, and meeting UL 325 Safety Standards. Contractors must submit a schedule, material submittals, an accident prevention plan, and provide a minimum one-year warranty on all materials, parts, and labor. The project is solicited under Solicitation Number 1240LP25Q0069, with the contractor responsible for removing and disposing of old components, maintaining safety protocols, and completing the entire scope of work within 30 days of starting. The total project site is located at 534 Ridge Road, Nederland, CO 80466, with electrical, water, and restroom facilities available on-site.

View the file

Other files

File Type Posted
Site visit questions and photos.docx DOCX document
Work Center Map.pdf PDF
WD 2015-5421_30_7-15-2025.pdf PDF
1240LP25Q0069 BRD Nederland Garage Door Replacement.pdf PDF
Project location map.pdf PDF
Project overview map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Government Furnished3
5.0 Deliverables / Schedule3
6.0 Travel4
7.0 Contractor’s Key Personnel4
8.0 Security Requirements4
9.0 Data Rights4
10.0 Section 508 – Electronic and Information Technology Standards4
Attachment4

Project BRD Nederland Garage Door Repair

General Information

1.0 Scope of Work

The Boulder Ranger District needs servicing, repairing and replacing of various parts of their commercial garage doors. This work includes, but is not limited to, the following:

· Full commercial garage door hardware overhaul to restore function, safety, and longevity.

· Servicing all barrels and hoods, replacing springs and other associated hardware, and completing a full system test ensuring 100% functionality of all six garage doors.

· Existing garage doors are to remain.

· Removal and replacement of five industrial duty hoist operators.

· Installation of five commercial grade infrared safety sensor systems.

2.0 Background

The Nederland Work Center Engine Bay is located in Nederland, CO. There are various existing garage door components that are not functioning properly and need servicing, repairing, and/or replacing.

3.0 Technical Requirements / Tasks

The contractor shall install the garage doors components according to State and Federal laws and regulations. All work must occur between 0800-1700, Monday through Friday, and no work shall occur on weekends or Federal holidays.

Period Of Performance: 08/25/2025-02/28/2026

Contractor must ensure that they do not interfere with U.S. Forest Service fire operations and personnel, which may occur in the work area. Contractor must allow Forest Service personnel, engines and equipment to come and go at any given moment. Contractor must submit a proposed plan on how they will allow Fire operations to continue during construction.

Contractor must ensure that doors do not remain open after working hours and can be secured.

Definition of Pay Items:

Base Items (BI):

1. Base Item No. 1 – Mobilization

a. This base item consists of all preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site. This base item applies to work included in the base items only.

b. Warranties are required for all materials, parts, and labor for a 1 year min.

c. Payment shall be made at the contract lump-sum price.

2. Base Item No. 2 – Full Servicing (Repairing and Replacing) of Barrel and Hood Components, 10’x10’ Doors

a. This base item includes the repair of six (6) barrels and hoods, and all associated hardware, including disassembly, spring removal replacement and installation, fine-tuning bearings and end guides, removal of existing safety edges and associated parts (to be replaced with photo eye sensors), full re-assembly back onto existing doors, and performance of a full system test to ensure 100% functionality. Existing garage doors are to remain.

b. This base item consists of all materials, personnel, labor, equipment, hardware, and supplies to ensure 100% functionality of the interface between garage door operations and barrel and hood components.

c. All removed associated parts from this line item must be hauled off-site to a state-approved Landfill, or recycled.

d. Payment shall be made for each servicing of barrel and hood components. All work necessary to ensure 100% functionality of the garage door/barrel and hood interface are incidental to this line item.

3. Base Item No. 3 – Removal and Replacement of Industrial Duty Hoist Operators, 10’x10’ Doors

i. This base item includes the removal and replacement of five (5) industrial duty hoist operators, including the performance of a full system test to ensure 100% functionality. All newly installed hoist operators must be bolted through the total thickness of the concrete block wall. Existing hoist operators are LiftMaster Gearhead Hoist 501 Logic 5.0 (LiftMaster GH501L5). Replacement hoist operators’ parts shall be compatible with salient characteristics LiftMaster or equal. Product must be right-hand mount, left-hand drive; ¾ Horsepower; 115 Volt, Single-phase.

ii. Product must meet UL 325 Safety Standards.

iii. Install must include a 3-button station with open/close/stop and maintenance alert parts shall be compatible with salient characteristics LiftMaster or equal. 3-Button Indoor Surface Mount Station. The existing is NMA 1 02-103-L. Replacement shall be parts shall be compatible with salient characteristics NMA or equal.

iv. Product must be include solenoid actuated brake

v. Product must be compliant with infrared safety sensor system technology to be installed in Base Item No. 4.

b. This base item consists of all materials, personnel, labor, equipment, hardware, and supplies necessary to remove and replace industrial duty hoist operators.

c. All removed associated parts from this line item must be hauled off-site to a state approved landfill or recycled.

d. All electrical work and wiring needed to connect and ensure the function of the new hoist to the existing electrical for the existing hoist is incidental to this work item.

e. Payment shall be made for each hoist operator removed, replaced and tested for 100% functionality. All work necessary to perform the above tasks are incidental to this line item.

4. Base Item No. 4 – Installation of Commercial Grade Infrared Safety Sensor Systems, 10’x10’ Doors

a. This base item consists of the installation of five (5) commercial infrared safety sensor systems, including but not limited to bell wire, mounting brackets, and all other hardware necessary for installation on both sides of each garage door. The existing safety sensor system is LiftMaster CPS-U Commercial Grade Photo Eye/Safety Sensors. Replacement parts shall be compatible with salient characteristics LiftMaster or equal.

b. This base item consists of all materials, personnel, labor, equipment, hardware, and supplies necessary to install all components of the infrared safety systems.

c. All electrical and wiring work needed to connect and ensure function of the new sensor systems is incidental to this work item.

d. Payment shall be made for each infrared safety sensor system installed. All work necessary to perform the above tasks are incidental to this line item.

The contractor must install and/or service garage door components safely and according to State and Federal laws and regulations. The installation company is responsible for removing and disposing of old components that are to be replaced. The company is responsible for completing this work within 30 days of starting the work. The Contracting Officer’s Representative will inspect the work after completion for final inspection.

The Contractor shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman’s compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract.

The Contractor shall provide complete and accurate activity records throughout the duration of the contract and provide the Government with legible, readable copies of such records upon completion of a unit of work on the contract, and prior to or accompanying the invoice.

The contractor is responsible for always maintaining safe operations. The Forest Service is not responsible for the safety of the Contractor nor any operators or assistants. The Contractor shall provide and maintain work procedures which will safeguard the public and Government personnel, as well as the Contractor’s own personnel. The Contractor shall be expected to use reasonable safety procedures and equipment while operating on National Forest lands.

Government Inspection and Acceptance The Contractor must notify the COR upon completion of installing the doors. The COR may inspect the site up to 15 days following completion of work to verify work was performed according to contract requirements. If the contractor fails to meet the specifications, the contractor must rework the site(s). The COR must be notified of work completion prior to submitting an invoice.

4.0 Government Furnished

The contractor will need to schedule a date and time to meet the COR or Government Technical Monitor for this contract. There is electrical, water, and restroom facilities on site for contractor use as it pertains to this contract.

5.0 Deliverables / Schedule

Key Deliverables

Item No.
Deliverable / Item Title
Description
Frequency
Delivery Format
Due By
1
Schedule
A schedule outlining the proposed service timeline, from mobilization to demobilization
Before Award
With proposal
Before Award
2
Material Submittals
Submit all materials for this contract, including but not limited to:

· Industrial Duty Gearhead Hoist Operator Product

· Commercial Grade Photo Eye / Safety Sensors Product

· Proposed Design for Hoist Operator Attachment System

· Plan to allow for Continuous Fire Operations During Construction

Before Award
With proposal
Before Award
3
Accident Prevention Plan
Submit a site-specific accident prevention plan to ensure contractor and public safety
Before Award
With proposal
Before Award
4
Warranties
Warranties for materials, parts, and labor for a 1 year min.
Before Final Payment
With proposal
Before Award

6.0 Travel

The project location is in the Engine Bay in the U.S. Forest Service Nederland Work Center, located at 534 Ridge Road, Nederland, CO 80466. The contractor will not be permitted to stay overnight on site.

7.0 Contractor’s Key Personnel

Contractor Representative: The contractor shall provide a contract representative for the performance of work. The name of this person and an alternate(s) who can act for the contractor when the contractor is absent should be designated in writing to the Contracting Officer.

Certification and Personnel Requirements: The contractor and employees shall be experienced in servicing, repairing, and replacing various components associated with industrial garage doors. The contractor and employees shall be proficient in following the specifications of the contract. The contractor installing the garage door under this contract must meet all State of Colorado and Federal licenses and requirements. Personnel employed by the Contractor must be briefed and trained in service and safety techniques.

8.0 Security Requirements

The contractor must coordinate with the COR, Government Technical monitor, or other designated U.S. Forest Service personnel for daily access to the project site.

9.0 Data Rights

N/A

10.0 Section 508 – Electronic and Information Technology Standards N/A