SOW Elevator Inspections.docx
DOCX document 30 KB Posted
- Attached to
- H139--Elevator Inspection Services Sheridan, WY
- Solicitation number
- 36C25926Q0479
About this file
This is a Statement of Work (SOW) for elevator inspection services at the Sheridan VA Medical Center in Sheridan, Wyoming. The contract is structured as an Indefinite Delivery Indefinite Quantity (IDIQ) agreement with a 60-month term consisting of an initial base year plus four one-year ordering periods. The contractor must provide all certified and trained personnel, labor, supervision, equipment, tools, materials, insurance, and transportation necessary to perform annual, semi-annual, and five-year elevator inspections on 21 total elevators and lifts from manufacturers including Dover, Otis, Thyssen Krupp, Langley Freight, and Harmar Summit. All inspections must comply with ASME A17.1, NFPA Life Safety and Fire Codes, OSHA regulations, and applicable state and local safety codes.
Work shall be performed during normal VA business hours (7:30 a.m. to 4:00 p.m., Monday through Friday, excluding federal holidays) with a minimum two-week advance notice to the Contracting Officer's Representative (COR). The contractor must immediately report all safety-related deficiencies during inspection visits and submit comprehensive inspection reports within 45 calendar days, along with maintenance checklists within one week of completion. Reports must include specific technical data such as elevator speed, rated load, manufacturer information, governor speed test results, safety tests, and door operation details. The contractor's personnel must maintain current QEI certification, wear VA-issued ID badges, and coordinate all work directly with the COR. The five-year periodic inspection is due before August 13, 2026. Performance is measured on compliance with scheduling requirements, safety protocols, timely reporting, and personnel certification, with unsatisfactory performance resulting in poor CPARS ratings and potential corrective action notices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25926Q0479.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Elevator Inspection Services Sheridan VAMC The contractor shall provide Elevator Inspection services in accordance with the terms and conditions stated within this “Statement of Work” (SOW). All work shall be coordinated with the Sheridan VA Health Care System’s (VA HCS) Contracting Officer’s Representative (COR).
1. PURPOSE: Contractor shall provide all certified and trained personnel, labor, supervision, equipment, tools materials, supplies, insurance, and transportation necessary to perform annual, semi-annual, and five-year elevator inspections. An Indefinite Delivery Indefinite Quantity 60-month contract is anticipated with an initial Base year and four (4) 1-year ordering periods.
2. GENERAL REQUIREMENTS:
a. Contractor shall determine if the equipment is in safe operating condition, that it has not been altered except in conformity to the applicable codes or regulations, and that each elevator performs in accordance with all applicable inspection requirements.
b. The contractor shall perform to the standards in accordance with the SOW.
c. Contractor shall clean equipment when necessary to properly inspect and test equipment.
d. Contractor shall remove parts where necessary to determine the exact condition of other parts which could not otherwise be determined.
e. In the performance of this contract the contractor must take such safety precautions as determined by Sheridan VA Fire/Safety and Engineering departments and local, state and federal safety regulations and guidelines to be reasonably necessary to protect the lives and health of occupants of the building.
f. Work requiring shutdown, interruption, infection control, or potential interruption of power to critical areas of the Medical Center will require extensive coordination and planning with the COR and will require at least two weeks’ notice to the COR. Major shutdowns may have to occur on weekends.
3. SAFETY COMPLIANCE: Contractor must conduct all routine inspections and tests in compliance with current American Society of Mechanical Engineers (ASME) A17.1 requirements, National Fire Protection Agency (NFPA) Life Safety and Fire Codes, Occupational Safety and Health Administration (OSHA) rules and regulations and following all local, state, and federal occupational safety and health codes and regulations.
4. SCHEDULING ARRANGEMENTS: Except by special alternative arrangements, scheduled work will be performed only during VA HCS normal working hours (7:30 a.m. to 4:00 p.m. Monday through Friday excluding federal holidays).
a. Contractor shall coordinate with the COR to schedule services.
b. A minimum of two weeks’ notice is required prior to performing the work.
c. Work must be conducted when the COR or his/her designate is available on site to monitor the work
d. *Annual Period Inspection and Test shall be scheduled and conducted in conjunction with, and in addition to, the Semi-Annual Routine Inspection and Test annually.
e. *Five Year Periodic Inspection and Test shall be scheduled and conducted in conjunction with, and in addition to, the Annual Periodic Inspection and Test.
f. Five Year Periodic Inspection and Test to be performed and is due before 8/13/2026.
*Contractor may elect to conduct inspections during the same visit, or during the same month.
5. CHECK IN/OUT PROCEDURES:
a. Prior to commencement of and immediately after each service visit, the contractor and/or contractor’s authorized repair technician must check in and out with the COR.
b. Contractor performing services will be required to wear an ID Badge.
c. ID Badge must be signed for at checkin and returned, after each visit.
6. FEDERAL HOLIDAYS: Federal holidays are any calendar days designated by statute or executive order as federal holidays.
7. CONTRACTOR REPORTING: Contractor shall provide to the COR with individual service reports, which describes the inspection services performed on the equipment, within 45 calendar days of inspection.
a. All safety-related deficiencies shall be immediately reported to the COR, during the inspection visit.
b. All maintenance checklists shall be submitted to COR within 1 week of completion of work including any recommendations for items needing repaired/replaced.
c. The inspection report shall include but not be limited to:
i. Building Name
ii. Building Address
iii. Building Owner
iv. Contractor Contact Information
v. Elevator Inspection
vi. Speed
vii. Rated Load
viii. Manufacturer
ix. Serial / Sales #
x. Date of Installation
xi. Powered by
xii. Machine Type
xiii. Type of Safety Location
xiv. Guide Rails
xv. Buffers
xvi. Type of Governor
xvii. Governor Speed Test
xviii. Periodic Test & Acceptance / Governors and Safeties (Required every 12 months)
xix. Full Load Maintenance Test & Acceptance (Required every 3/5 years)
xx. Car Speed for Governor / Safety Test (if applicable)
xxi. Car Speeds (if applicable)
xxii. Roped Hydraulic Elevator / Lift Test & Acceptance (if applicable)
xxiii. Number of Stops
xxiv. Car Door Pressure
xxv. Opening Front
xxvi. Opening Rear (if applicable)
xxvii. Door Operation xxviii. Fire Service Tested
xxix. Identify Components not Inspected
8. DELIVERABLES
a. All equipment listed in the SOW shall be inspected annually, semi-annually, and every five-years.
b. Five year inspection due before 8/13/2026.
c. Annual Periodic Inspection and Test shall be scheduled and conducted in conjunction with, and in addition to, the Semi-Annual Routine Inspection and Test scheduled for the same month.
d. Five Year Periodic Inspection and Test shall be scheduled and conducted in conjunction with, and in addition to, Annual Periodic Inspection and Test scheduled for the same month.
e. Contractor shall provide a comprehensive report for each elevator inspection. Inspection report shall be received by COR within 45 days of inspection.
f. Provide one (1) printed and bound copy of the inspection report.
g. Provide one (1) electronic file of the inspection report in PDF/Excel/Word.
9. PROTECTION FROM DAMAGE: Contractor shall provide all labor, materials, and equipment necessary for protection of VA HCS personnel, furnishings, equipment and buildings from damage, and shall replace or repair any damage due to work performed under this contract equal to its original construction and finish.
10. RESPONSE REQUESTS: Contractor shall only respond to requests for service from VA HCS CO or COR. If service is requested from any other source the Contractor is to advise the caller of this requirement and refuse to respond. Any billing resulting from unauthorized service will not be paid by the government.
11. CHECK IN/OUT PROCEDURES: Prior to commencement of, and immediately after each service visit, the Contractor or his authorized repair technician must check in and out with the VA HCS COR (during normal working hours). Contractor will be required to obtain and wear ID Badges provided by the VA HCS.
12. LOCATION
Sheridan VA Health Care System 1898 Fort Road Sheridan, WY 82801 -8320
13. EQUIPMENT INVENTORY
| Manufacturer |
| SERIAL NUMBER |
| BUILDING |
| ELEVATOR PUMP |
| Dover Elevator |
| EE5040 |
| 1 |
| Hydraulic |
| Dover Elevator |
| FM5382 |
| 4 |
| Hydraulic |
| Dover Elevator |
| EU0503 |
| 6 |
| Hydraulic |
| Dover Elevator |
| FD6373 |
| 7 |
| Hydraulic |
| Dover Elevator |
| FE3299 |
| 8 |
| Hydraulic |
| Dover Elevator |
| BE3301 |
| 35 |
| Freight (Drum) |
| Dover Elevator |
| FE3300 |
| 64 |
| Hydraulic |
| Dover Elevator |
| ED7502 |
| 71 |
Controls in Bldg. 9 Hydraulic
| Dover Elevator |
| FB6072 |
| 71N |
| Hydraulic |
| Dover Elevator |
| BP6376 |
| 86 (B86 1) |
| Traction |
| Dover Elevator |
| BDL095 |
| 86 (B86 2) |
| Freight (Traction) |
| Dover Elevator |
| ED7312 |
| 86A (B86 3) |
| Hydraulic |
| Otis Elevator |
| 230912 |
| 7 |
| Freight (Traction) |
| Thyssen Krupp Elevator |
| CCE729 |
| 3 |
| Traction |
| Thyssen Krupp Elevator |
| EDR184 |
| B64 |
| Hydraulic |
Langley Freight Elevator
| M10265 |
| 31 |
| Laundry |
(Material Lift)
| Harmar Summit, CPL Series, Hercules Ameriglide |
| Unknown |
| B2 |
| Wheel Chair Lift |
15. LIABILITY INSURANCE: Contractor must provide this VA HCS with written confirmation that Contractor has adequate insurance protection against negligent work and other forms of liability. The nature and level of protection must be acceptable to this VA HCS.
16. PERFORMANCE STANDARDS
The table below defines the Performance Standards and Acceptable Levels of Performance associated with this effort.
| PERFORMANCE OBJECTIVE |
| PEFORMANCE STANDARD |
| PERFORMANCE |
REQUIREMENTS
| MONITOR |
| ACCEPTABLE LEVEL OF PERFORMANCE |
| ELEVATOR INSPECTIONS AND TESTS FOR SAFE OPERATIONS |
| Conduct thorough inspection and testing Sheridan IAW ASME-A17.1 and the NFPA Life Safety and Fire Code and applicable State Codes. |
| A. Parts shall be removed where necessary to determine the exact condition of other parts which could not otherwise be determined. |
B. Contractor shall clean equipment when necessary to make the proper inspection and test.
| VA Facility Safety Officer |
| 100% COMPLIANCE |
Passing VA Facility Safety Officer inspection will result in a “Satisfactory” Contractors Annual Performance Rating (CPARS)
Failure to pass the VA Safety Officer inspections will result in an “Unsatisfactory” CPARS.
| SCHEDULING |
| Scheduling coordinated with the COR as outlined in this SOW. |
A. Contractor shall schedule and coordinate all work with the COR providing a minimum of two weeks’ notice prior to performing the work.
B. Annual Periodic Inspection and Test is to be conducted in conjunction with and in addition to the Semi-Annual Routine Inspection and Test scheduled for the same month.
C. Five Year Periodic Inspection and Test is to be conducted in conjunction with and in addition to Annual Periodic Inspection and Test scheduled for the same month.
D. Inspection and Test to be performed in the design year only (FY2026).
| COR |
| 100% COMPLIANCE |
results in a Satisfactory CPARS
| COMMUNICATION |
| Reporting of safety issues |
| All safety-related deficiencies shall be immediately reported to the COR, during the inspection visit. |
| COR |
| 100% COMPLIANCE |
results in a Satisfactory CPARS
| REPORTING |
| Inspection report shall be received by COR within 45 days of inspection. |
| Reporting will address and include all attributes as outlined in this SOW |
| COR |
| 99% of reports provided timely results in a Satisfactory CPARS |
| CERTIFICATION OF PERSONNEL |
| Contractor personnel performing work shall have current QEI Certification |
| QEI Certification |
| COR |
| 100% COMPLIANCE |
results in a Satisfactory CPARS
| SAFETY |
| Compliance with VA HCS, ASME, NFPA, OSHA, and local, state, federal safety regulations |
| Safety protocols shall be followed. |
All safety-related deficiencies shall be immediately reported to the COR, during the inspection visit.
| COR and Safety Officer |
| 100% COMPLIANCE |
results in a Satisfactory CPARS
Acceptable Performance: The Government shall document positive or negative performance. Any report may become a part of the supporting documentation for any contractual action.
Unacceptable Performance: When unacceptable performance occurs, the COR shall work with the Contracting Officer (CO) inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case, the COR shall document the discussion and place it in the COR file.
To assure that the contractor receives impartial, fair, and equitable treatment under this contract, the COR will work with the contractor to increase performance to an acceptable level. When the COR and CO determines formal written communication is required, the COR and CO shall prepare a Notification (Letter or Concern (LOC), Cure Notice, Show Cause Notice) and present it to the Contractor.
1. The contractor shall acknowledge receipt of the LOC Notice in writing.
2. The LOC will specify if the contractor is required to prepare a corrective action plan (CAP) to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The Notice will also state how long after receipt the contractor shall present this corrective action plan to the CO.
3. The Government shall review the contractor's corrective action plan to determine acceptability.
Any Notice may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
File details come from the government source that posted it. Updated .