SOW EHRM Tampa Bay - Final.pdf

PDF 621 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Design Tampa Federal contract opportunity
Solicitation number
36C77621R0121
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides a statement of work and scope of design services for an Architect-Engineer firm to complete infrastructure upgrades at the Tampa VA Healthcare System-James A Haley VA Medical Center in Tampa, Florida to support the new Electronic Health Record Modernization system. Key details include:

The scope of design services includes site visits, studies, and preparing drawings, specifications and cost estimates to upgrade facility fiber, electrical systems, IT infrastructure including network cabling and outlets, HVAC distribution, physical security, and hazardous material remediation. Design submittals are required at 10%, 35%, 65%, 95% and 100% completion with a total design schedule of 295 calendar days. Construction period services are optional and include responding to requests for information, submittal reviews, site visits and record drawing production. Relevant standards include VA Technical Information Library criteria and the VA OEHRM Site Infrastructure Requirements.

The document provides instructions for Architect-Engineer firms to respond by submitting Standard Form 330 qualifications packages for consideration, with a response deadline of July 1, 2021 and anticipated design contract award by August 15, 2021. The estimated construction cost is between $20-25 million.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Design Tampa, newest first.
File Type Posted
36C77621R0121 0006.docx DOCX document
36C77621R0121 0005.docx DOCX document
S05 - Technical Question Tracking Sheet - Tampa - Final.docx DOCX document
36C77621R0121 0004.docx DOCX document
SF330 Request - Tampa.docx DOCX document
Technical Question Tracking Sheet - Tampa.docx DOCX document
36C77621R0121 0003.docx DOCX document
36C77621R0121 0002.docx DOCX document
S05 - Technical Question Tracking Sheet - Tampa.docx DOCX document
36C77621R0121 0001.docx DOCX document
36C77621R0121.docx DOCX document
PPQ - PR EHRM.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tampa VA Healthcare System 13000 Bruce B Downs Blvd 2021-07-01 Tampa FL 33612

ARCHITECT-ENGINEER DESIGN SCOPE OF WORK

EHRM INFRASTRUCTURE UPGRADES

PROJECT NO: 673-20-107

PROJECT NAME: EHRM Infrastructure Upgrades – Tampa VA Healthcare System, James A Haley VA Hospital

ESTIMATED CONSTRUCTION COST: $20,000,000 to $25,000,000

**The Certification and Accreditation (C&A) does not apply, a Security Accreditation Package is not required**

1. GENERAL INTENT:

The Contractor (herein referred to as “A/E”) shall provide Architect/Engineer (A/E) services to design a construction project at the Tampa VA Healthcare System-James A Haley VA Medical Center in accordance with this design scope of work.

2. STATEMENT OF WORK:

A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The project shall include, but is not limited to, upgrading facility fiber throughout the buildings to each Tele/Comm Rooms (87), provide a redundant fiber run throughout the facility to each Tele/Comm Room, provide redundant fiber mains to the PBX/Telecom Demarcation and Data Center Rooms from the provider point, install or upgrade potentially (8400) IT outlets located throughout end user spaces, and (175) 48 port patch panels in (87) Tele/Comm Rooms throughout campus buildings (Requires field verification), install or upgrade potentially (8400) electrical outlets located throughout the end user spaces and (87) Dual Power Outlets in (87) Tele/Comm Rooms throughout the campus (Requires field verification) , upgrade facility power distribution as required, upgrade facility HVAC distribution as required, physical security assessment and upgrades, and hazardous materials remediation and abatement Reference: Building 1 AHERA Report_Appendix C (SOW Attachment 3), Final Asbestos Survey Report - JAHVA Building 2 (Appendix B) (SOW Attachment 2).

A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 2 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. All Part Two Services are optional line items and will not be exercised at the time of award.

The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of the Tampa VA Healthcare System-James A Haley VA Medical Center record drawings and the EHRM infrastructure readiness assessment documents will be made available to the highest rated A/E firm; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design. (SOW Attachment 5) – James A Haley VAMC Campus and James A Haley – Facility Map (SOW Attachment 4) will give AE firm a basic understanding of the Tampa VA Healthcare System-James A Haley VA Medical Center.

The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project.

APPLICABLE SITE-SPECIFIC INFLUENZA/COVID REQUIREMENTS

To gain entry onto campus all contractors must follow current in force screening protocols. The A/E firms’ representatives performing site investigations on campus must have the following additional requirements before starting site investigations on campus:

1. A/E will utilize off shift and evening hours to accommodate field investigations and evaluations if required to prevent interruptions of clinical care activities.

2. Contractors follow our Universal Masking mandate, all individuals in VA buildings or on Federal lands must wear face masks. Masks should meet CDC requirements for suitable source control (no exhalation valves or vents for example.) Masks must be replaced when damaged or soiled.

3. Daily visit at check-in station for COVID and temperature screening.

4. Annual influenza shot is required for all staff performing work on Tampa VA Healthcare System- James A Haley Healthcare Center.

5. VA PIV Contractor badge must always be obtained and worn by contractor or representative while on campus. Utilize VA FORM 0711 OCT 2006.

6. Building 30 and building 38 some areas contractors and A/E will be required COVID test twice a week to enter.

The temperature checks are performed on the Tampa VA Healthcare System-James A Haley VA Medical Center campus and must be performed immediately when the contractor arrives on site. Temperature checks are currently performed at Building 1, main entrance, Building 1, Emergency Department entrance, building 32, RTU entrance, Building 38, (SCI) main entrance. If at any time an employee of the A/E firm is found in deficiency of the listed a stop work order will be issued for safety of Tampa VA Healthcare System-James A Haley VA Medical Center patients. Any further questions please reference to the Tampa VA Healthcare System- James A Haley VA Medical Center Infectious Control Dept.

3. DESIGN WITHIN FUNDING LIMITATIONS:

The design shall be prepared by the A/E to permit the award of a construction contract, using Federal Acquisition Regulation FAR 52.236-22 and procedures for the construction of the facilities, at a cost that does not exceed the project’s estimated construction contract price of $20,000,000 to $25,000,000.

4. DESIGN INDEPENDENCE, FURNITURE AND EQUIPMENT: Designs for construction must produce a “complete and usable” facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately. Equipment that can be part of the design in the includes those items to meet code requirements for building occupancy, items covered in the VA’s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00. IT Equipment and Software proposed shall be approved VA OIT.

The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design’s independence.

5. DESIGN CRITERIA: The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the VA TIL, including (but not limited to) the following listed Department of Veterans Affairs References:

PG-18-1 Master Construction Specifications SOW Attachment 6 VHA Required Division 01 Specification Section List PG-18-3 Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders] PG-18-4 Standard Details and CAD Standards PG-18-5 Equipment Guide List H-18-8 Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis]

PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual http://www.cfm.va.gov/til/index.asp http://www.cfm.va.gov/CFM/TIL/spec.asp http://www.cfm.va.gov/CFM/TIL/cPro.asp http://www.cfm.va.gov/CFM/TIL/sDetail.asp http://www.cfm.va.gov/CFM/TIL/equip.asp http://www.cfm.va.gov/CFM/TIL/seismic.asp http://www.cfm.va.gov/CFM/TIL/planning.asp http://www.cfm.va.gov/cfm/til/dManual.asp http://www.cfm.va.gov/cfm/til/dGuide.asp http://www.cfm.va.gov/CFM/TIL/accessibility.asp http://www.cfm.va.gov/cfm/til/room/RoomFinishes.pdf http://www.cfm.va.gov/til/aeDesSubReq.asp http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf

Tampa FL 33612

H-7545 VA Cultural Resource Management Procedures OIT Infrastructure Standard for Telecommunications Spaces v3.0 (21 August 2020)

The following references should also be used to complete the design documents:

VA Standards Alert 017 – Infrastructure Standards for Telecommunications Spaces and all standards, guides, and manuals incorporated by reference (https://www.cfm.va.gov/til/sAlert/sAlert017.pdf) v3.0 (21 Aug 2020)

00 VA OEHRM Site Infrastructure Requirements v2.0 (SOW Attachment 7) SOW Attachment 08 - HEFP SEP (SOCAMES 6) Design Alerts 1-4 (SOW Attachment 8) Building 1 AHERA Report Appendix C (SOW Attachment 3) Final Asbestos Survey Report - JAHVA Building 2 (Appendix B) (SOW Attachment 2)

Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide.

6. DESIGN COLLABORATION: The A/E during this design project shall collaborate with the VHA Office of Healthcare Environment and Facilities Programs Special Engineering Program (HEFP/SEP) staff, VISN 8 and the Independent Life Safety Review Agent (LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEPF/SEP and/or VISN deliverables shall be coordinated with the A/E’s design submittals to ensure compliance with all requirements are met. The A/E is required to ensure all elements of the design adhere to the Life Safety Code for OIT Occupied Spaces (Data Server Rooms, Computer Labs, and PBX Telecom Rooms) including recommendations for temporary construction barriers, prior to the Independent Life Safety review.

Unoccupied spaces shall meet Uniform Building and Fire Codes (Telecom Rooms).

7. INDEPENDENT LIFE SAFETY REVIEW: The A/E shall incorporate any comments from the VA 3rd party life safety review.

8. ENVIRONMENTAL PROTECTION: The A/E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the Tampa VA Healthcare System-James A Haley VA Medical Center. If the NEPA assessment results in potential environmental impacts, the A/E shall be responsible for completing any auxiliary documentation required per PG-18-17 NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal.

9. PHYSICAL SECURITY: The A/E must include a certified physical security specialist. The specialists must be involved with the design beginning with the concept phase and the qualifications must be submitted to the COR for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the Physical Security Design Manual for Mission Critical Facilities located on the TIL (http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf). The A/E shall ensure that all aspects of the applicable VA Physical Security Design Manual (either Life-Safety http://www.va.gov/vapubs/viewPublication.asp?Pub_ID=584&FType=2 https://www.cfm.va.gov/til/sAlert/sAlert017.pdf http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf

Tampa FL 33612

Protected or Mission Critical Facilities; both will be applicable depending on the area the work is taking place) are incorporated into the design and shall prepare a written report acknowledging compliance as required by the VAMC. The A/E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase of the design and assist the VA with waiver requests as necessary.

10. TELECOMMUNICATIONS DESIGN: In accordance with “Telecommunications and Special Telecommunications Systems Design Manual,” February 2016 (https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf), paragraph 1.2 (d), Telecommunications design must be performed and stamped by a BICSI Registered Communications Distribution Designer (RCDD) for all projects.11. SUBMITTAL REQUIREMENTS: Design submittals shall follow the requirements of Program Guide, PG-18-15, Volume C - A/E Submission Instructions for Minor and NRM Construction Program dated November 2008. This document is included as (SOW Attachment 9).

Submittal documents shall be prominently marked “For Official Use Only (FOUO)” if they contain qualifying data as defined in VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification – For Official Use Only (FOUO). This memo is included as (SOW Attachment 10), as it is hosted on a non-public VHA site (https://vaww.va.gov/vhapublications/ViewPublication.asp?pub_ID=8949).

The A/E shall deliver design submittal documents that follow the iterative phase breakdown for design work in PG-18-15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG-18-15; it is expected for the phase of design that each of the checked items in the SD/DD/CD columns will be completed for the submittal. The A/E shall attend a review meeting following each design submittal as indicated under the Project Schedule section of this Scope of Work. Each new submittal will incorporate all VA comments from the previous submittal. The Asbestos and Lead Abatement requirements in PG-18-15 are applicable at the Tampa VA Healthcare System-James A Haley VA Medical Center due to the age of the campus (construction began in 1969’s). Reference: Building 1 AHERA Report_Appendix C (SOW Attachment 3), Final Asbestos Survey Report - JAHVA Building 2 (Appendix B) (SOW Attachment 2).

The following submittals will be required for this project:

Quality Assurance/Quality Control (QA/QC) Plan Basis of Design (BD) - 10% - In addition to the requirements in PG-18-15, a Basis of Design is required. Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details, and their ultimate presentation in the final drawings and specifications, will be based on sound architectural and engineering decisions. Conceptual drawings of the planned design and the initial cost estimate will additionally be included.

Schematic Design (SD)- 35% Design Development One (DD) – 65% Construction Documents (CD)- 95% Final Bid Documents (Bid) – 100%

12. DRAWING FORMAT: All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software should be Revit 2019 or the latest version available to Tampa VA Healthcare System-James A Haley VA Medical Center.

https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf https://vaww.va.gov/vhapublications/ViewPublication.asp?pub_ID=8949 http://www.cfm.va.gov/til/projReq.asp

The A/E shall provide a computer 3D model and prepare various 3D renderings to present to VA throughout the design phase to adequately represent architectural, mechanical/electrical/plumbing (MEP), site conditions and other items in the design to aide with facility visualization and contractor coordination.

The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the Tampa VA Healthcare System-James A Haley VA Medical Center Master Record Drawing – pending facility expertise). The deliverable model at the SD, DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase.

Architectural/Interior Design Square Footage/Volume Room Names and Numbers Architectural Schedules Architectural Specialties and Woodwork Doors Windows Louvers Roof Floors Ceilings Vertical Circulation Walls/Curtain Wall Sizes, Shapes, & Material Data General Signage Schedules Furniture Equipment Structural Foundations

Shafts and Pits Mechanical

HVAC

Plumbing Electrical/Telecommunications Power and Lighting Steam Distribution Other Engineering Data as Required Exterior Building Information Nurse Call System Asbestos/Hazardous Material Info Security System Information (Access Control, Security

Cameras, Panic Alarms, Overhead Paging) Life Safety Information (Fire Extinguishers, Wall

Ratings, Door Ratings, Fire Protection/Alarms) Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition)

13. SUBMITTAL FORMATS: Submittals shall be submitted in electronic format and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp) and Autodesk Revit Project (.rvt) files are acceptable. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at http://www.section508.gov/. The A/E shall be responsible for providing:

Meeting/Conference Minutes Meeting minutes for all formal meetings and conferences held with the VA; including weekly construction meetings. Meeting minutes shall be submitted within seven (7) calendar days of the meeting or conference. All documents in any of the electronic formats listed above.

Minimum meeting minutes requirements

• Project name, number, meeting host, Meeting Name http://www.section508.gov/

Tampa FL 33612

• Date, Time, meeting ID, call in number, Duration, and consecutive number of total related meetings

• Participant list (Name, Title, Phone number (office and Mobile), Email, Attended Meeting (yes/no Check box)

• Meeting purpose, Roll call, COVID-19, and Additional Items

• Agenda items (Decisions, action items, and fixes or next steps)

• Next meeting date and time

• Detailed attachment list

Construction Cost Estimates Construction cost estimates shall comply with Manual for Preparation of Cost Estimates & Related Documents for VA Facilities dated March 8, 2011. This document is available on the TIL at http://www.cfm.va.gov/cost/index.asp. All estimates in any of the electronic formats listed above.

Quality Assurance/Quality Control (QA/QC) Plan All documents in any of the electronic formats listed above.

Basis of Design (BD) All documents in any of the electronic formats listed above.

Two (2) half-size paper bond sets of drawings – 2 to VA

Schematic Design (SD) All documents in any of the electronic formats listed above.

Two (2) half-size paper bond sets of drawings – 2 to VA Two (2) paper bond sets of specifications – 2 to VA

Two (2) paper bond sets of investigation reports, design calculations, space planning data and cost estimate - 2 to VA

Design Development (DD), and Construction Documents (CD)

All documents in any of the electronic formats listed above.

Memo annotating what was not upgraded and corresponding justifications.

One (1) full size paper bond sets of drawings - 1 to VA Two (2) half-size paper bond sets of drawings – 2 to VA Two (2) paper bond sets of specifications – 2 to VA Two (2) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW) and cost estimate - 2 to VA

Final Bid Documents (Bid)

AE will provide one extra set of any of these docs if requested by VA in the future, so they are available for AE to print and ship out to OCAMES, PCAC, or any other parties if needed.

PDF files of drawings, specifications, and any miscellaneous design analysis documents such as submittal log and physical security compliance report.

Certified memo annotating what areas/times were not upgraded and the corresponding justifications.

http://www.cfm.va.gov/cost/index.asp

Certified memo that the A/E design is independent of future projects and includes all equipment required for the project to be activated/full functional.

Word files of specifications.

Revit and AutoCAD files of drawings.

One (1) full size paper bond sets of drawings - 1 to VA Two (2) half-size paper bond sets of drawings – 2 to VA Two (2) paper bond sets of specifications – 2 to VA One (1) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction SOW and cost estimate - 1 to VA

Construction Period Services (CPS)

Requests for Information (RFI)

VA may require turnaround in less than 7 days if taking 7 days will impact contractor's ability to perform work or schedule.

Requests for Information shall be submitted within three (3) calendar days of submittal to the A/E.

Submittal Reviews Submittal reviews shall be submitted within seven (7) calendar days of submittal to the A/E.

Site Visit Reports Site visit reports shall be submitted within seven (7) calendar days of the visit. All documents in any of the electronic formats listed above.

Modification/Change Order Requests Modification requests shall be submitted within seven (7) calendar days of submittal to the A/E.

This includes the review of the contractor’s change order/modification proposal for construction change orders, as well as the formulation of an IGCE for the modification, as requested. The A/E's reply regarding his/her review of cost proposals and his/her recommendations shall include an independent breakdown of costs in detail, quantities, and unit prices and shall cover both additions and deductions of labor, materials, and equipment. The A/E shall also supply cost estimates as requested by the COR for Request for Proposals for anticipated changes.” All documents in any of the electronic formats listed above. Note - If major modification, VA will provide additional time and document format guidance.

Punch List Punch list shall be submitted within seven (7) calendar days of the final acceptance inspection.

All documents in any of the electronic formats listed above. Certifications of all fiber, cable runs and systems startups shall be documented and turned over to VA prior to acceptance.

Record Drawings Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. Autodesk 2019 Revit Project (.rvt) format and 2019 AutoCAD (.dwg) format.

Tampa FL 33612

14. PROJECT SCHEDULE/PERIOD OF PERFORMANCE: The A/E shall perform Part One Services/Design Phase work according to the schedule shown below. The A/E is also responsible for following specification Section 01 32 16.10 Architectural and Engineering CPM Schedules, which is located in 01 32

16.01 EHRM Architectural and Engineering CPM Schedule (SOW Attachment 11). If a due date on the timeline below falls on a Holiday or Weekend, the submittal shall be due the following business day. The remaining timeline will not be shifted to accommodate Holidays or Weekends.

Design Submittal Schedule: Design time allotted to be followed in working days from award date or Notice of Award (NOA). Where an Accelerated Package may be included with a Base Design submittal, it will have the same schedule as the Base Design Package associated with it in the design submittals requirement:

1) PCAC Admin Time 14 calendar days after receipt of NOA

2) Kick-off Meeting, A/E Site and HazMat visits 6 calendar days after end of PCAC Administrative Time

3) Begin Schematic/Preliminary drawings 45 calendar days after NOA

4) Receive schematic design manual 60 calendar days after NOA

5) Schematic design meeting with VA 65 calendar days after NOA

6) Schematic comments by VA back to A/E 70 calendar days after NOA

7) VA Receive 35% working drawing, specifications 85 calendar days after NOA

8) 35% design meeting with VA 115 calendar days after NOA

9) 35% Comments by VA back to A/E 120 calendar days after NOA

10) Receive 65% working drawings, specifications 185 calendar days after NOA

11) 65% design meeting with VA 200 calendar days after NOA

12) 65% Comments by VA back to A/E 205 calendar days after NOA

13) Receive 95% working drawings, specifications 240 calendar days after NOA

14) 95%design meeting with VA 255 calendar days after NOA

15) 95% comments by VA back to A/E 270 calendar days after NOA

16) Complete construction docs and specs 285 calendar days after NOA

17) Final Bid Documents Acceptance Meeting 295 calendar days after NOA

Total Part One Services/design Phase Schedule 295 calendar days

The 295 days listed in part one project schedule may fluctuate based on when 95% CD submittal meets all VA guidelines and acceptance is issued. If 95% CD submittal is not accepted due to insufficient design requirements throughout the design period and additional time is deemed necessary. It is the responsibility of the AE firm to cover all costs associated with such delays.

Part Two; Bidding Support Services/Construction Period Services and shall be OPTIONAL LINE ITEMS and not a BASE ITEM and shall be performed for the length of time between the time the option(s) are exercised and acceptance of Construction Completion. The VA has 365 calendar days from final acceptance of the design to exercise the option(s) for Construction Period Services.

15. CONTRACT OVERSIGHT: All contracts for this project shall be awarded by the Program Contracting Activity Central (PCAC); only a warranted VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders and changes to the statement of work.

PCAC shall designate a Contracting Officer’s Representative (COR) to monitor and manage the A/E’s performance under the design project contract. The COR shall be a representative of the Tampa VA Healthcare System-James A Haley VA Medical Center Engineering Service Project Section and have the technical knowledge required to monitor and oversee the project.

A COR from the Tampa VA Healthcare System-James A Haley VA Medical Center Engineering Service Project Section shall also be designated for the construction project contract to monitor and manage the construction contractor’s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of “Owner’s Representative” and does not supersede or eliminate the A/E’s responsibility for Part Two Services/Construction Period Services. The A/E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase.

16. OI&T INFRASTRUCTURE STANDARD FOR TELECOMMUNICATION SPACE:

The current version for this standard is version 3.0, dated August 21, 2020 (https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf). The design for this project at The Tampa VA Healthcare System-James A Haley VA Medical Center must meet the Campus Support Center (CSC) requirements of the Infrastructure Standard for Telecommunications Spaces.

The Infrastructure Standard for Telecommunications Spaces (The Standards) serves as the master reference document of criteria for Department of Veterans Affairs (VA) facility Information Technology (IT) support infrastructure. It defines the technical requirements necessary to maintain optimum reliability and efficiency within VA facilities and computing centers. IT Support Infrastructure is defined https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf

Tampa FL 33612 as all passive telecommunications and information technology equipment, and supporting physical space and equipment.

This standard is owned and maintained by Solution Delivery (SD) Data Center and Infrastructure Engineering and questions or concerns should be directed to the following email group: OIT ITOPS SD Data Center and Infrastructure Engineering.

Users must ensure their use of this technology/standard is consistent with VA policies and standards, including, but not limited to, VA Handbooks 6102 and 6500; VA Directives 6004, 6513, and 6517; and National Institute of Standards and Technology (NIST) standards, including Federal Information Processing Standards (FIPS). Users must ensure sensitive data is properly protected in compliance with all VA regulations. Prior to use of this technology, users should check with their supervisor, Information Security Officer (ISO), Facility Chief Information Officer (CIO), or local Office of Information and Technology (OI&T) representative to ensure that all actions are consistent with current VA policies and procedures prior to implementation.

17. EXEMPTIONS TO VA OEHRM SITE INFRASTRUCTURE REQUIREMENTS:

Any variances or exemptions to (SOW Attachment 7), most recent version, must be referenced, documented and discussed with CO, COR and HEFP SEP. Following approval of variance or exemption, AE shall submit documentation describing variance or exemption, indicating reference in VA documentation, describe any mitigating measures, and include an attachment with documentation of discussion with CO, COR and HEFP SEP.

18. REPORTING REQUIREMENTS:

The Contractor shall be required to report to the VA Tampa Engineering Project Service (Building 42) to log in during normal working hours as well as after normal working hours. This check-in is mandatory.

VA Bay Pines Engineering Project Service will issue a badge that will expire after duration of visit. The Contractor will clear through the Engineering Project Section, Facility Management Service, BLDG. 42 RM 202 to log in during normal working hours. This check-in is mandatory. When the service is completed, the Contractor shall document services rendered on a legible field service report. The Contractor shall return to the same service and building to submit the field service report to the COR for signature during normal working hours.

19. SOW and ATTACHMENTS:

The following list of documents are attached to this SOW for A/E use and incorporation into the project documents:

Final Asbestos Survey Report - JAHVA Building 2 (Appendix B) (SOW Attachment 2) James A Haley Building 1 AHERA Report_ Appendix (SOW Attachment 3) James A Haley – Facility Map (SOW Attachment 4) James A Haley Campus Map (SOW Attachment 5) VHA Required DIV 01 Specification Sections (SOW Attachment 6) 00 VA OEHRM Site Infrastructure Requirements 1.9 (SOW Attachment 7)

Tampa FL 33612

SOW Attachment 08 - HEFP SEP (SOCAMES 6) Design Alerts 1-4 (SOW Attachment 8) Program guide, PG-18-15 Volume C – A/E Submission Instructions for Minor and NRM

Construction program dates November 2008 (SOW Attachment 9) Sensitive Infrastructure Data Classification FOUO (See SOW Attachment 10) 01 32 16.01 EHRM Architecture and Engineering CPM Schedule (See SOW Attachment 11)

END OF SOW