SOW - Duct Cleaning.doc

DOC document 95 KB Posted

Attached to
HVAC air duct cleaning services at Coast Guard Station Lake Worth Inlet
Solicitation number
70Z02824Q0000010
Issued by

About this file

This document includes a Scope of Work (SOW) for HVAC air duct cleaning services and the related federal contract opportunity solicitation. The SOW requires contractors to provide all labor, materials, tools and equipment to clean, disinfect, and treat for mold the air duct systems and surrounding areas in the main and shop buildings at Coast Guard Station Lake Worth Inlet. The work must be completed within 30 calendar days of notice to proceed. The related solicitation is seeking quotes for these HVAC air duct cleaning services at the specified location. Quotes are due by February 16, 2024 with anticipated award by March 1, 2024. The solicitation is set aside for small businesses and will result in a fixed price contract awarded based on lowest price technically acceptable. Offerors must include past performance documentation and pricing breakdown with their proposals.

View the file

Other files

File Type Posted
Q and A for duct cleaning work.docx DOCX document
SF_30.pdf PDF
Q and A for duct cleaning work.docx DOCX document
Air Duct Diagram.pdf PDF
15-4573.txt TXT text file
Clauses and Provisions (Supply and Service).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work for HVAC air duct services CG STA Lake Worth Inlet

1 DESCRIPTION OF WORK

Contractor is to provide all labor, materials, tools, equipment, and supervision necessary to clean, disinfect and treat for mold of main and shop building. Provide clean-up of all work areas.

Work to include the following:

1) Entire air duct system supply and return vents need to be cleaned, disinfected, and treated for mold in main and shop building 2) Clean, disinfect and treat for mold all air register grills (appx. 160) 3) Clean, disinfect and treat for mold all area surrounding the air register grills.

4) Identify and replace grills that need to be replaced in main and shop building.

5) Clean, disinfect and treat for mold coil condensers for 24 HVAC units in main and shop building 6) Clean and drain 24 drainage piping units from HVAC units to end points.

7) Clean-up of all work areas Contractor shall ensure upon completion all grounds related to the project are safe for use. Final product shall comply with all applicable federal, state, and local requirements.

2 SUBMITTALS AND OUTCOMES

2.1 Safety Plan (see 20.3)

2.2 The Contractor shall submit a work schedule including all milestones within seven (7) calendar days following contract award.

2.3 Submit installation details showing method of leveling.

2.4 Submit product data and installation planning.

3 PROJECT PERFORMANCE TIME

The contractor must complete all work, deliverables, and outcomes within 30 calendar days after notice to proceed is given by the Government.

4 LOCATION

All work shall take place at the following location:

CG STA Lake Worth Inlet 3300 Lake Shore Drive Riviera Beach, FL 33404

5 POINT OF CONTACT

The Government Point of Contact (POC) for this work is MKC Gavin M. Kozak, (561) 718-0424, Gavin.M.Kozak@uscg.mil or DC2 Jared Kearns (845) 901-9398, Jared.P.Kearns@uscg.mil. The Contractor shall coordinate with the POC to minimize interference with Coast Guard operations or personnel. All work shall be coordinated with other trades involved in the project and carefully laid out in advance.

6 WORK PHASING

6.1 Work shall be completed as expeditiously as possible; Contractor shall coordinate with the POC to coordinate phasing and job sequencing. Contractor shall submit construction schedule for Government review and approval prior to commencing in any work to be performed.

6.2 The facility shall remain in operation throughout the service. Contractor access to the service site shall be limited to the following: 8:00am to 4:00pm, Monday through Friday, excluding holidays. Access to the site shall not be permitted on the weekends without prior approval from the Coast Guard (COR).

7 AVAILABILITY OF UTILITIES

7.1 Reasonable amounts of the following utilities will be made available to the Contractor without charge.

7.2 Electricity

7.3 Potable Water

7.4 The Contractor shall pay all costs incurred in connecting, converting, and transferring the utilities to the work. The Contractor shall be responsible for making connections including providing back flow preventer devices on connections to domestic water lines, providing transformers, and for disconnections. The POC shall designate the outlets available to the Contractor.

8 CONTRACTOR USE OF PREMESES

The Contractor will be working on a Coast Guard operational military installation. Become familiar with and obey installations’ fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the Government.

9 LAYDOWN AREA

The Contractor will be provided with an uncovered lay-down area in the immediate vicinity of the work. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings or pavement as a result of storage activities.

10 STORM PROTECTION

Should warnings of extreme weather (such as high waves, storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, relocating barges, closing all openings, removing all loose materials, tools, and equipment from exposed locations, and removing or securing fencing, scaffolding and other temporary work.

11 ENVIRONMENTAL PROTECTION

All Federal, State, and local laws must be strictly adhered to. Demolition and construction debris shall be disposed of at a permitted facility.

12 DELIVERY AND STORAGE

Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items shall be replaced. Location of storage and staging area shall be designated by the POC. The contractor will be responsible for security of all materials and equipment.

13 RECEIPT OF MATERIALS

Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments.

14 CLEANUP

The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials on a daily basis and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters.

15 UTILITY OUTAGES

Before interrupting or shutting down any utility, make a request for the interruption to the POC at least two (2) working days before the anticipated interruption. Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the POC.

16 SECURITY

16.1 Working Personnel List.

The Contractor shall provide the COR with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site.

16.2 Personnel Identification

All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license, or a company issued ID. The identification must be laminated and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises.

17 QUALITY

Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications.

18 WARRANTIES

All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government.

19 FINAL INSPECTION AND ACCEPTANCE

When the work is complete and ready for final inspection, submit a written request to schedule final inspection to the Government. Prior to such requests, all submittals must be complete and approved. Such requests shall allow a minimum of two (2) days’ notice prior to final inspection date.

20 SAFETY

20.1 General

The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules, and regulations.

20.2 Compliance

The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the “Accident Prevention” clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquish the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule, or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations.

20.3 Safety Plan

The Contractor shall submit a written safety plan within seven (7) calendar days following contract award. At a minimum, this plan shall describe the Contractor's general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, working over water, working from floating work platforms, overhead crane operations or similar conditions of the work. This Safety Plan shall be approved prior to commencing any work on site.

File details come from the government source that posted it. Updated .