SOW.pdf

PDF 1016 KB Posted

Attached to
Base Electrical System Study Federal contract opportunity
Solicitation number
W50S9320B5004
Issued by
Department of the Army National Guard

About this file

This scope of work document outlines requirements for an electrical system study of the Muniz Air National Guard Base in Puerto Rico. The study will include performing an electrical load assessment and power quality analysis across the base distribution system through the use of power recorders and harmonic analyzers. A site visit is scheduled for April 28, 2020. Quotes are due by May 11, 2020 for the following deliverables: as-built drawings of the one-line diagram and site plan utilizing base CADD standards; a comprehensive electrical system study report analyzing the existing conditions, scenarios evaluated, equipment loadings, voltage and current distortions, inspection findings, and recommendations; and submission of the final report in Word and PDF formats on compact disks. The period of performance is 90 days from award. The solicitation is set aside for small businesses with a NAICS code of 238210 and size standard of $16.5M.

View the file

Other files for this federal contract opportunity

Other files attached to Base Electrical System Study, newest first.
File Type Posted
Industry Questions and Answers (PDF).pdf PDF
Electric utility bills.pdf PDF
Combined Synopsis - Solicitation.pdf PDF
DD369 - Police Record Check.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL PROVISIONS

FROM:

156th AW/MSG BASE CIVIL ENGINEER

PUERTO RICO AIR NATIONAL GUARD

CAROLINA, PUERTO RICO

SCOPE OF WORK FOR

BASE ELECTRICAL SYSTEM STUDY

TUMR192102

FOR:

156th AW/MSG CONTRACTING OFFICER

PUERTO RICO AIR NATIONAL GUARD

CAROLINA, PUERTO RICO

TECHNICAL PROVISIONS

SCOPE OF WORK FOR

BASE ELECTRICAL SYSTEM STUDY

TUMR192102

GENERAL INDEX

SECTION CONTENTS PAGE NO.

1 General Scope 1

2 Project Description 1

3 Objective and Milestones 1

4 Detailed Description of Submittals 2

5 General Requirements 3

6 Reference Drawings 4

SCOPE OF WORK

FOR

TUMR192102 Base Electrical System Study

1.0 GENERAL SCOPE:

The Architect-Engineer shall provide all materials and services for Base Electrical System

Study

2.0 PROJECT DESCRIPTION:

2.1 Muniz Air National Guard Base Power Electrical Distribution system consist of a main underground three phase 4,160V electrical feeder coming from Puerto Rico Electrical

Power Authority (PREPA) existing switch unit 24 (SU-24).This feeder provide power to a main switch unit located next to building 11. Electrical system metering equipment is located in this switch. From the main switch seven underground 4,160V electrical feeders conform the backbone of the base primary distribution system.

2.2 Perform an electrical system study to the Power distribution system of Muniz Air

National Guard Base, Carolina, Puerto Rico. The evaluation should consider the health of the facility’s electrical power distribution system. With the results of the evaluation, provide documentation of existing electrical system configuration, overall system condition, improvement needs and electrical system availability and reliability.

3.0 OBJECTIVES AND MILESTONES:

3.1 Perform an electrical load study (Voltages, VA, Watts, Power factors currents etc.) and power quality assessment throughout the installation of power recorders and or harmonic analyzer at the main switch unit (4.16kV) and to all the distribution transformers.

3.2 Perform visual inspection as necessary to the Base Main electrical distribution system, including main switch unit, substation A and B, distribution transformers, underground primary feeders, electrical manholes etc.

3.3 Contractor is responsible of provide manpower and materials to open manholes and provide dewatering system if necessary to perform the electrical manholes inspections.

3.4 The contractor shall provide all labor, equipment, supplies, consultant services and all site investigations, surveys, analysis and verification of existing electrical system in order to complete this study.

3.5 Attend a preliminary conference to discuss the requirements and walk through of the area. Gather required information to begin the assessment.

3.6 Contractor Qualifications: The study shall be prepared by a qualified Registered

Professional Electrical Engineer licensed in Puerto Rico working for an Electrical

Testing Company (NETA Full member Company) with a least 10 years of experience performing this type of studies and analysis.

3.7 Develop an Electrical System Study Report. Attend a report review meeting.

TUMR192102 Base Electrical System Study

3.8 .Incorporate report review comments into report. Submit Final report package. Include all requirements from contract.

4.0 DETAILED DESCRIPTION OF SUBMITTALS

4.01 (Provide a minimum of the following) The contractor shall prepare an as built drawings (22" X 34") of the electrical system one line diagram and electrical site plan for the electrical primary distribution system, utilizing Muniz ANG Base

CADD standards at working scale with a Cover Sheet in Standard format depicting the project name and number, half size sets are 11” x 17”.

4.02 A complete Electrical System Study Report which includes as a minimum the following:

1. Basis, description, purpose, and scope of study.

2. Tabulations of the data used to model the system components and a corresponding one line diagram.

3. Descriptions of the scenarios evaluated and the basis of each.

4. Tabulations of power, RMS current, RMS Voltage, Peak Voltage, power factor versus equipment ratings. The tabulation shall identify percentage of rated load and the scenario for the percentage is based. Overloaded equipment shall be clearly noted.

5. Tabulations of calculated voltage distortion factors, current distortion and individual harmonics vs the limits specified by ANSI/IEEE519.

6. Comparison equipment nameplate data with available drawings and specifications.

7. Inspection of physical and mechanical conditions.

8. Inspection of anchorage, alignment, grounding, and required area clearances.

9. Conclusions,recommendations and recommendations estimated cost.

4.03 The 100% Final report specifications shall be submitted using Word for Windows version 6.0. In addition a PDF copy of the final report will be required. The report shall be placed on compact disks. All report shall be typed on 8 1/2" X 11" pages

(maps, drawings, and spreadsheets may be fold out pages).

TUMR192102 Base Electrical System Study

5.0 GENERAL REQUIREMENTS:

5.1 Only the Contracting Officer can change the scope of the work described in this

Statement of Work. The government is under no obligation to compensate the

Contractor for work performed outside of the scope of this task order without prior written approval of the Contracting Officer. The Contractor is therefore cautioned that performing work beyond that described here, without first receiving written direction, will be done at the Contractor’s expense without recourse against the government or its agents.

5.2 Changes to the scope of this task assignment, which the Contractor feels to be in the best interest of the government, may be submitted to the Contracting Officer for consideration. Any such request for changes must be made at or before the preliminary submittal.

Submittal Schedule

Data Gathering 30 Calendar Days

Report Preparation 20 Calendar Days

Government Review 5 Calendar Days

Pre-final Submittal 5 Calendar Days

Government Review 5 Calendar Days

Final Submittal 7 Calendar Days

TOTAL 72 Calendar Days

TRANSFOMERS PLAN

GENERATORS

STOP

STOP

MUÑIZ ANG BASE

156th AIRLIFT WING

MUÑIZ ANG BASE LUIS MUÑOZ MARIN INTERNATIONAL AIRPORT

BASE MASTER PLAN

SCALE

SHEET

DATE

ANG NO.

PRANG

APPROVED

DRAWN BY

TRACED BY

OF

ANG CIVIL ENGINEER

SUBMITTED