OFFLOAD OF HYPERBARIC RECOMPRSSION CHAMBER AND ANCILLARY EQUIPMENT
Solicitation number
70Z08426QPCAR0001
Issued by

About this file

This is a Statement of Work (SOW) for the US Coast Guard PAC-3DSF Dive Force Management concerning the offload of a hyperbaric recompression chamber and ancillary equipment from the USCGC Polar Star.

The contractor must provide all necessary labor, materials, equipment, and transportation to safely remove the hyperbaric recompression chamber (RCC) and ancillary equipment (AE) from the CGC Polar Star's flight deck at US Coast Guard Base Seattle (Pier 46, 1519 Alaskan Way S., Seattle, WA 98136) and load it onto a commercial shipping truck. The RCC has an estimated weight of 30,000 lbs and requires a crane with minimum load capacity of 30,000 lbs at over 100 feet horizontal reach. The contractor must supply a certified crane operator and qualified rigger/signal person for the entire operation, coordinate with the Base Seattle Point of Contact regarding timing and location, and provide a written quote detailing pricing, lifting capacity, labor, and transportation. If the shipping truck is delayed, the contractor shall offload the RCC and AE to a designated area on Pier 46 as directed. The work is scheduled for April 17, 2026, with April 18, 2026 as a backup date due to operational or weather-related issues. All work must comply with OSHA and USCG safety regulations, and the contractor is responsible for site safety and provision of all required personal protective equipment. Payment will be made upon successful completion and acceptance by the US Coast Guard. The vendor must maintain an active SAM registration at the time of quote submission and comply with all applicable federal, state, and local laws and regulations.

View the file

Other files

File Type Posted
REVISION 3_SOW.pdf PDF
SF30_Amendment P00002.pdf PDF
Solicitation_SF30.pdf PDF
REVISION 2_SOW.pdf PDF
Updated ODF 26 RCC OFFLOAD - SOW.pdf PDF
ODF 26 RCC SPEC SHEET.pdf PDF
ODF 26 LOAD OUT LIST.pdf PDF
70Z08426QPCAR0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8. VENDOR REQUIREMENTS

• Vendor must have an active registration in the System for Award Management (SAM) at the time of quote submission (www.sam.gov).

• Vendor must comply with all applicable federal, state, and local laws and regulations.

9. PAYMENT TERMS

• Payment will be made upon successful completion of the services and acceptance by the

US Coast Guard.

Attachments:

• RCC and AE Specification Sheet