This Statement of Work (SOW) details the remanufacturing requirements for the F100-PW-220 Rear Turbine Case (Part Number 4062252, NSN 2840-01-242-8335). The document specifies comprehensive technical and quality assurance procedures for returning the turbine case to a serviceable, like-new condition, including detailed instructions for disassembly, cleaning, inspection, corrosion control, and remanufacturing processes. The contractor must follow specific technical orders, particularly TO 2J-F100-13-9, and comply with rigorous quality management standards including ISO-9001 certification.

Key requirements include performing detailed inspections, replacing condemned parts with serviceable components, identifying remanufactured items with the contractor's CAGE code, and preparing for potential Product Verification Audits (PVA). The SOW also includes provisions for Supply Chain Risk Management, Continuity of Operations planning, and cybersecurity protocols. The contractor must be prepared to potentially support surge production in the event of national emergency or increased defense demand, maintaining flexibility to rapidly increase production and component availability.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

For

F100-PW-220 Rear Turbine Case

PR # FD2030-24-00588-00

DATE: 26 February 2024

PREPARING ORGANIZATION:

AFLCMC/LPEA2

TINKER AFB, OK 73145-3030

FD20302400588 Page 2 of 27

TABLE OF CONTENTS Page

TABLE OF CONTENTS

SECTION I

SCOPE

SECTION II

APPLICABLE

DOCUMENTS

SECTION III

WORK

REQUIREMENTS

APPENDIX 1

ACRONYMS ................................................................................................. Error! Bookmark not defined.

APPENDIX 2

NOTES

APPENDIX 3

PRODUCT VERIFICATION AUDIT PROCEDURES

APPENDIX 4

Supply Chain Risk Management (SCRM)

APPENDIX 5

Surge

FD20302400588 Page 3 of 27

SECTION I

SCOPE

1.0 GENERAL

This Statement of Work (SOW) establishes the minimum work requirements to return F100-PW- 220 Rear Turbine Case listed below by National Stock Number (NSN) and Part Number (P/N) to a serviceable, like new condition. The F100-PW-220 Rear Turbine Case Assemblies received by the contractor, as set forth in this contract shall be remanufactured, modified, tested, prepared for storage and shipped in accordance with (IAW) the requirements in this SOW and the contract.

NOUN PART NUMBER NSN APPLICABLE T.O.

Rear Turbine Case 4062252 2840-01-242-8335 2J-F100-13-9

1.1 DATA

1.1.1 Reporting Requirements

1.1.1.1 Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

1.1.1.2 Product Quality Deficiency Report (PQDR): The contractor shall prepare a PQDR in the Joint Deficiency Reporting System (JDRS) on all design and quality control (material) deficiencies found IAW the procedures of TO 00-35D-54. Applicable portions of TO 00-35D-54 relative to quality defects will apply. The contractor shall hold exhibits of reported deficient items pending disposition from the ACO representative. Report preparation, distribution, holding and tagging of exhibits shall be IAW TO 00-35D-54.

1.1.1.3 TO System Publication Improvement Report (AFTO Form 22): The contractor shall prepare a PIR when an error or improvement changes the meaning of the instructions or information contained in technical directives and will prevent the adequate performance intended. The contractor shall accomplish a PIR IAW TO 00-5-1 and submit one copy to AFLCMC/ENR. Minor discrepancies of non-technical nature such as improper sequence of pages, typographical errors, transportation errors, misspelled words, etc., shall not be reported. The contractor shall report omissions of pertinent technical data, correction of remanufacture procedures in TOs, or desired changes to TO data shall likewise use the AFTO Form 22.

1.1.1.4 Deficiency Report (TDR): A DR shall be accomplished on any PQDR

FD20302400588 Page 4 of 27 exhibit received for investigation. The report shall be completed IAW the procedures established on DD Form 1423 as set forth in the contract.

1.1.2 Other Records, Forms and Reports

1.1.2.1 The contractor shall make available to the appropriate ACO representative the required information to enable him to review and/or verify monthly production status reports on end items and to enable him to complete his records or to complete other such reports as may be required.

1.1.2.2 CAV AF End Item Production Report (End Item Activity Report): The report shall be completed IAW the procedures established on DD Form 1423, as set forth in the contract and the Appendix 2.

1.1.2.3 CEMS Reporting: The status of all serialized life limited parts must be known at all times. This status is to be reported to CEMS IAW TO 00-25-254-1 as required by DD Form 1423. Any questions regarding the reporting requirements are to be directed through the ACO. Note: The F100-PW-220 Rear Turbine Case is not serialized tracked part, and therefore, CEMS reporting is not required in this contract.

1.1.2.4 Completed DD Form 1574 Serviceable Tags are required IAW MIL-STD-129P, paragraph 5.2.21.a.

1.1.3 Technical Data

1.1.3.1 TOs listed in this specification are the basic directives to be used in accomplishing the remanufacture requirements of the contract.

1.1.3.2 TO illustrated parts breakdowns (IPBs) listed in this SOW shall be used in the part replacement requirements of the contract. Replacement parts shall conform to the configurations stipulated in the applicable TO IPB as supplemented by other applicable directives and instructions in this SOW. Part replacement shall be confined to those parts determined to be required to produce a zero time serviceable end item.

1.1.3.3 Instructions listed in this SOW as “Changes” or “Revisions” to a TO represent publication changes to the Technical Order System and shall be complied with. The sub-paragraphs contain the location of changes as designated and the deletion, change or addition of technical information to be accomplished.

1.1.3.4 In the event of a conflict between the instructions in this SOW and the applicable technical directive, the following order of override precedence applies (descending order): 1) this SOW, 2) the end item TO, 3) other technical directives.

FD20302400588 Page 5 of 27

1.2 SECURITY

1.2.1 Contractor’s Security Controls: Equipment and materials covered by this SOW are not classified.

1.3 QUALITY

1.3.1 The contractor shall provide and utilize an inspection/quality system IAW ISO - 9001.

1.3.2 The contractor shall investigate, take corrective action if necessary, and reply to user initiated PQDR forwarded to them by the ACO. This applies to all PQDRs submitted against products remanufactured by the contractor and/or their subcontractor or vendors.

Priority shall be given to PQDR investigation to meet requirements of TO 00-35D-54 and the CDRL.

1.4 DELIVERY SCHEDULES

1.4.1 The delivery schedules shall be IAW the contract delivery schedules.

1.4.2 DoD FEDMall is prohibited for use by non DoD entities, the contractor will need to ensure they have viable sources to supply to enable them to meet the governments delivery schedules.

1.5 CONDEMNATION, REMANUFACTURE AND REMANUFACTURE

1.5.1 Contractor’s Scrap Procedures: The contractor shall prepare and submit to the

Government Property Administrator (GPA) for approval, a written plan that sets forth procedures for handling scrap materials. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General”. Disposition of condemned parts containing critical alloys and/or precious metals shall be IAW TO 00-25-113, 00-25-153-F100-ENG and FAR 45.6 titled “Reporting, Reutilization, and Disposal”.

1.5.2 Condemnation: The contractor shall not condemn End Items without written approval of the ACO or his representative.

1.5.2.1 End Items determined by the contractor and verified by the ACO to be beyond economical remanufacture shall be disposed of as directed by the ACO in writing.

1.5.2.2 Parts, which have been condemned as a result of NDI methods, other inspection methods, or for other reasons, shall be mutilated to the extent necessary to ensure

FD20302400588 Page 6 of 27 that purchasers of scrap are unable to remanufacture the item or indentured parts for possible resale or reuse. All documents and tags pertinent to such condemned parts authorized for transfer to disposal shall bear a certificate to the effect that all required mutilation has been accomplished and meet DEMIL directive requirements.

1.5.2.3 The serial number and part number of any life-limited item, which is condemned, must be condemned IAW CEMS CDRL.

1.5.3 Remanufacture: End Items determined to be beyond economical remanufacture shall not be remanufactured by the contractor unless authorized in writing by the ACO.

1.6 HANDLING

1.6.1 The contractor shall have physical custody of end items and parts received at their facility and shall be responsible for their constant care during such custody.

1.6.1.1 The receipt and status of all serialized components or accessories, which are tracked in CEMS, must be reported IAW Para 1.1.2.2 of the SOW and CDRL. Note: The F100-PW-220 Rear Turbine Case is not serialized tracked part, and therefore, CEMS reporting is not required in this contract.

1.7 INVENTORY

1.7.1 Each end item shall be inspected by the contractor upon receipt to determine its condition and to ensure that its item identification corresponds to that shown on the contract schedule. Non-conforming end items shall be reported to the appropriate ACO representative.

1.8 PRESERVATION

1.8.1 Preservation inspection of end items is not required upon receipt. Adequacy of preservation will be determined when the item is placed in work and if found deficient shall be reported to the appropriate ACO representative.

1.8.2 All Government assets shall be stored in an enclosed and covered area and shall be adequately protected against loss by fire, theft, and physical damage by the elements.

Government owned items and parts shall not be co-mingled with non-Government owned property.

1.9 RECEIPT/HANDLING OF PQDR EXHIBITS

FD20302400588 Page 7 of 27

1.9.1 Any exhibit received for the purpose of an investigation into the cause of a material or a quality deficiency shall be kept separated from normal remanufacture assets until the investigation is completed. The contractor shall provide the exhibit receipt date through the ACO.

1.10 SAFETY AND HEALTH

1.10.1 While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health.

The contractor shall notify the Government Representative (GR), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 during the execution of the contract.

1.10.1.1 Mishap notifications shall contain, as a minimum, the following information:

1.10.1.1.1 Contract, Contract Number, Name and Title of Person(s) Reporting

1.10.1.1.2 Date, Time and exact location of accident/incident

1.10.1.1.3 Brief Narrative of accident/incident, if known

1.10.1.1.4 Cause of accident/incident, if known

1.10.1.1.5 Estimated cost of accident/incident (material and labor to repair/replace)

1.10.1.1.6 Nomenclature of equipment and personnel involved in accident/incident

1.10.1.1.7 Corrective actions (taken or proposed)

1.10.1.1.8 Other pertinent information

1.10.1.2 If requested by designated GR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

1.11 ITEM UNIQUE IDENTIFICATION (IUID)

1.11.1 Repair contracts that result in the delivery of tangible personal property to the

Government shall follow the latest DoD instructions to install IUID compliant marks in accordance with policy as stated in DFARS 211.274. IUID requirements for the J85 MISTR components have not been identified at this time. When directed by the PCO, the contractor shall follow the latest DoD instructions to install IUID compliant marks. TOs and drawings will be complied with for any component where direction is currently called out in the TO or drawings.

FD20302400588 Page 8 of 27

SECTION II

APPLICABLE DOCUMENTS

2.1 Technical Publication Compliance

2.1.1 Compliance with all TOs, Directives, Government Specifications, Drawings, etc., listed herein is mandatory, unless otherwise specified in this SOW, when:

2.1.1.1 They have not been previously accomplished

2.1.1.2 They have not been previously accomplished

2.1.1.3 They are pertinent to the end item.

2.1.1.4 They prescribe Air Force Policies, use of materials and procedures for remanufacture.

2.2 For solicitation purposes, the contractor may contact USAF F100 Engineering Source

Authority for instructions for viewing or purchasing technical data required for maintenance of this contract. Upon contract award, the contractor shall establish and maintain a TO distribution account IAW TO 00-5-1; and be placed on initial distribution for one copy each of the TOs and TCTOs listed in this SOW. The contractor shall contact the TOMA office at AFLCMC.LPSAA.TOMA@us.af.mil within five (5) working days after contract award for guidance in obtaining a TODO account. Once the contractor’s TODO account is in operation, the contractor shall maintain all TOs and TCTOs and other technical directives listed in the SOW in an updated and current status IAW TO 00-5-1. The contractor is required to comply with the latest dated TO; TCTO and other technical directives issued and will be contractually covered during the time the work is accomplished. For example, an item already in work will continue to be worked under the existing contractual scope of work until such time that the latest TO revisions can be negotiated as to price and scheduled incorporation. The contractor shall submit a monthly review of changes to TOs, TCTOs, and other applicable directives received during that period. However, if a change is received that has a cost impact greater than 10% and/or is critical to safety of flight, the contractor shall notify the ACO within ten (10) days of receipt of that change and also shall provide the cost impact with his backup data. The contractor shall not begin working with new publication until authorization has been granted by the ACO/PCO.

2.2.1 Copies of other Air Force publications required in the performance of work outlined in this SOW will be requisitioned through the ACO. Submit requests to appropriate ACO representative for review. TO 00-5-1 provides an explanation of the Technical Order System and for pertinent distribution, requisition and storage information.

mailto:AFLCMC.LPSAA.TOMA@us.af.mil

FD20302400588 Page 9 of 27

2.2.2 In the event follow-on to this contract is awarded, the “Package File” at the contract facility as of the end of the previous contract will be applicable to the follow-on contract and will be updated through amendments to the new SOW of the new contract. This procedure will ensure continuity of the publication data from one contract to another.

2.3 APPLICABLE TECHNICAL ORDERS

This is a preliminary list of Technical Orders. The contractor is responsible for ensuring they are using the latest edition.

TECH ORDER BASIC CG CHANGE

NUMBER DATE NO DATE SHORT TITLE

00-5-1 1 Oct 14 0 16 July 18 AF TECH ORDER SYSTEM

00-5-15 22 Sept 14 1 29 Sept 17 TIME COMPLIANCE TECH

ORDER SYSTEM

00-20-1 1 Apr 16 0 1 Apr 16 AEROSPACE EQUIP MAINT INSP, DOCUMENTATION, POLICIES &

PROCEDURES

00-20-2 1 Sept 10 29 15 Mar 16 MAINT DATA COLLECTION SYS

00-20-3 1 Jan 09 12 15 Aug 15 MAINT PROC OF REPARABLE

PROP

00-25-113-F100-

ENG

1 Aug 88 50 15 Mar 17 CRITICAL ALLOY AND

PRECIOUS METAL

00-35D-54 1 Sept 15 0 1 Sept 15 MATERIAL DEF REPORT &

INVEST SYSTEM

33B-1-1 15 May 14 0 15 May 14 NONDESTRUCTIVE INSP.

METHODS

2-1-111 15 Feb 90 0 15 Jan 19 STAND MAINT PROCEDURES

2J-F100-9

2J-F100-24

1 Nov 95

31 Mar 08

15 Jan 19

15 Jan 19

NONDESTRUCTIVE INSPECTION

IPB

2J-F100-94 1 May 92 0 15 Jan 19 IPB SUPPORT EQUIPMENT

FD20302400588 Page 10 of 27

2J-F100-13-1 15 Feb 07 0 15 Jan 19 MAINT INSTR-DEPOT

2J-F100-13-2 1 Feb 07 0 15 Jan 19 MAINT INSTR – DEPOT OCM

2J-F100-13-9 1 Feb 07 0 15 Jan 19 FAN DRIVE TURBINE

2.4 APPLICABLE DIRECTIVES

MILITARY STANDARDS CHANGE DATE TITLE

MIL-STD-129P 19 SEP 07 U.S. MILITARY MARKING FOR

SHIPMENT AND STORAGE

MIL-STD-130N 17 DEC 07 ID MARKING OF U.S. MILITARY

PROP.

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO - 9001 15 DEC 00 QUALITY MANAGEMENT

SYSTEMS – REQUIREMENTS –

THIRD EDITION

2.4 APPLICABLE DOCUMENTS

2.4.1 LPF-QAR-001: “GENERAL QUALITY ASSURANCE DOCUMENTS FOR F100

ENGINE FC/DC BREAKOUT COMPONENTS”

2.4.2 LPF-QAR-002: “CHANGE PROCEDURES FOR PROCESS ORDERS”

2.4.3 LPF-QAR-004: “LPFR QUALITY ASSURANCE REQUIREMENTS FOR F100

ENGINE COMPONENTS”

2.4.4 LPF-QAR-006: “LPFR QUALITY ASSURANCE REQUIREMENTS FOR

PRODUCT VERIFICATION AUDIT (PVA) TEST PLANS AND REPORTS

2.4.5 LPF-QPR-009: “LPFR QUALITY PLAN REQUIREMENTS FOR VACUUM

BRAZED ASSEMBLIES”

2.4.6 LPF-QPR-016: “LPFR QUALITY PLAN REQUIREMENTS FOR DURABILITY

CRITICAL PARTS

2.4.7 LPF-QPR-017: “LPFR QUALITY PLAN REQUIREMENTS FOR CAST

HONEYCOMB RING SEGMENTS AND RING ASSEMBLIES”

2.4.8 LPF-QPR-018: “LPFR QUALITY PLAN REQUIREMENTS FOR

NONDESTRUCTIVE INSPECTION”

FD20302400588 Page 11 of 27

2.4.9 LPF-QR-001: “BASIC TECHNICAL DATA REQUIREMENTS FOR FRACTURE

CRITICAL AND DURABILITY CRITICAL PARTS”

2.4.10 LPF-QR-002: “CONDITIONS OF WAIVER FOR FRACTURE CRITICAL AND

DURABILITY CRITICAL PARTS”

FD20302400588 Page 12 of 27

SECTION III

WORK REQUIREMENTS

3.1 GENERAL WORK REQUIREMENTS

3.1.1 The instructions for the remanufacture of items stipulated in this SOW shall be performed IAW the applicable TOs and the below exceptions.

3.1.1.1 The contractor authorized to use its own tooling, which is similar to

OEM (Original Equipment Manufacturer) tooling.

3.1.1.2 The contractor is authorized to inspect per part drawing and part QAD (Quality Assurance Document). If the part has been re-identified and there is no QAD for the current part number, the pat’s previously applicable QAD can be used.

3.1.1.3 The contractor shall use protective equipment to protect items from damage as they are processed through the plant. Special protection shall be placed over the machined surfaces of end items.

3.1.1.4 The contractor shall inspect the various disassembled components or parts of the end item to determine if further remanufacture is needed.

Subsequent remanufacture shall be accomplished IAW the applicable portion of the applicable remanufacture technical order and supplementary instructions specified herein.

3.1.1.5 The contractor shall rework all reparable parts so that they are capable of meeting the serviceable requirements of this SOW.

3.1.1.6 The contractor shall continue to use all parts and assemblies determined serviceable and appropriate as a result of inspections and checks, except as specified in this SOW.

3.1.1.7 The contractor shall replace condemned parts of the end item with serviceable parts listed in the applicable technical order IPB unless otherwise specified in or within this SOW.

3.1.1.8 When remanufacture kits are available for the remanufacture of an end item, such kits shall be IAW the applicable technical order and changes thereto or the specific instructions contained in this SOW.

FD20302400588 Page 13 of 27

3.1.1.9 Where the contractor is directed to hold an item for AFLCMC disposition by any cited publication herein or be any statement made within this SOW, such items shall be reported to the ACO through the GPA for disposition.

3.1.1.10 Remanufacture, to the maximum extent, is desired when such remanufacture is economically feasible. The contractor is encouraged to submit new or improved remanufacture procedures to the Government whenever practical. Procedures may be submitted on an AFTO Form 22 as specified in this SOW or by any other means authorized under this contract. This does not preclude the contractor’s submission of remanufacture procedures, which are not economically feasible, when such remanufacture is advantageous to the Government.

3.1.1.11 All of the contractor’s operators of special processes, such as X-ray, radiography machines, Fluorescent Penetrate and Magnetic Particle Inspection Equipment, as well as welders moralizers, PMEL, etc., shall be qualified and certified for operation IAW applicable military specifications when listed in the SOW.

3.1.1.12 Fit and tolerance limits shall be IAW applicable remanufacture

TO/contractor’s processes and procedures unless otherwise specified.

3.1.1.13 Fluids, oil, greases and compounds shall conform to and be used as directed in the remanufacture TO and instructions contained in this

SOW.

3.2 SPECIFIC WORK REQUIREMENTS

3.2.1 Removal

3.2.1.1 Not Applicable.

3.2.2 Disassembly

3.2.2.1 Should be accomplished IAW the applicable portion of the applicable remanufacture technical order.

3.2.3 Cleaning

3.2.3.1 F100-PW-220 Rear Turbine Case shall be cleaned IAW TO 2J-F100-

13-9 WP 201.

3.2.3.2 The contractor shall ensure that cleaning and preserving materials meet the requirements specified in TO 2J-F100-13-1, TO 2J-F100-13-2 WP

FD20302400588 Page 14 of 27

005 00, or TO 2-1-111 and that such materials are properly used during application.

3.2.4 Inspection

3.2.4.1 Inspection of F100-PW-220 Rear Turbine Case shall be accomplished

IAW 2J-F100-13-9 WP 300,

3.2.5 Corrosion Control

3.2.5.1 The corrosion control of F100-PW-220 Rear Turbine Case during remanufacture and storage shall be accomplished IAW TO 2-1-111.

3.2.6 Remanufacture

3.2.6.1 Remanufacture of F100-PW-220 Rear Turbine Case shall be accomplished IAW 2J-F100-13-9 WP 400.

3.2.6.2 The contractor shall identify all remanufactured F100-PW-220 Rear Turbine Case with the contractor’s CAGE IAW MIL-STD-130N.

3.2.7 Installation

3.2.7.1 Not applicable.

3.2.8 Test And Government Acceptance

3.2.8.1 Inspect, test and check each remanufactured end item IAW TO 2-1-111.

3.2.8.2 The Government shall accomplish acceptance.

3.2.9 Product Verification Audit (PVA)

3.2.9.1 Remanufactured items shall be subject to PVA if requested by the government.

3.2.9.2 To perform PVA, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials.

3.2.9.3 After notification by the ACO that a PVA is required, the contractor will follow the procedures of Appendix 3 - Product Verification Audit Procedures.

3.2.10 Government Property

FD20302400588 Page 15 of 27

3.2.10.1 Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnish Material shall not be provided.

FD20302400588 Page 16 of 27

A1.1 ACRONYMS

APPENDIX 1

ACO Administrative Contracting Officer AFMC Air Force Material Command ALC Air Logistics Center CAGE Contractor and Government Entity CAO Contract Administration Office CEMS Comprehensive Engine Management System DOD Department of Defense EC Engineering Change ESA Engineering Source Authority FAR Federal Acquisition Regulation GFM Government Furnished Material GFP Government Furnished Property GPA Government Property Administrator IAW In Accordance With IPB Illustrated Parts Breakdown MRB Material Review Board NDI Nondestructive Inspection OC-ALC Oklahoma City Air Logistics Center OEM Original Equipment Manufacturer PCO Procurement Contracting Officer PIR Publication Improvement Report PQDR Product Quality Deficiency Report PVA Product Verification Audit QAD Quality Assurance Document QAR Quality Assurance Representative QCD Quality Control Deficiency SL: Salvage Layout SR Service Repair TO Technical Order USAF United States Air Force WP Work Package

FD20302400588 Page 17 of 27

APPENDIX 2

A2.1 NOTES

A2.1.1 The contractor is authorized to establish and convene a Material Review Board (MRB) to evaluate and determine disposition on non-conforming material or parts. Board members shall consist of representatives from the Contractor’s Quality Production Control, Engineering (Industrial, Product Support or Design) and the Government QAR. The MRB shall be convened when the contractor identifies non-conformance of material or parts during and after assembly. The MRB is not authorized to violate any TO limit. When MRB action is required on material or parts during and after assembly, the contractor shall provide information, to include part number, serial number and statement of non-conformance and corrective action taken, to AFLCMC/LPSA via email within (5) working days after approval of the MRB.

FD20302400588 Page 18 of 27

APPENDIX 3

A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES

A3.1.1 This attachment contains procedures and instructions for contractual accomplishment of Product Verification Audits (PVAs). This attachment does not supersede instructions contained in the contract remanufacture work requirements or other contractual provisions. In instances of conflict, the latter applies. The contractual issuance of this attachment and performance of PVAs does not relieve the contractor of the responsibility for maintaining a Quality Control System that will assure productions of items that conform to contractual requirements. PVAs are management tools used to independently evaluate and validate the conformance of a remanufactured item and contractor compliance to contractual requirements as well as the adequacy of the Government's contractually stipulated requirements.

A3.2 TERMS EXPLAINED

A3.2.1 PVA. The physical examination, functional testing and complete disassembly of an item to determine conformance to contractual requirements as well as adequacy of the contractual requirements which may require in excess of the original contractor remanufacture effort. The audit includes correction of defects, reassembly, retesting, repackaging, remarking, update of records and correction of contractual requirements as required.

A3.2.2 Cognizant Quality Assurance Element. The DOD contract administration service element having direct responsibility for implementing the Government Quality Assurance Program at the contractor's plant.

A3.2.3 Remanufactured Work Requirement. Any contract instrument, TO, drawing, specification or directive which contains instructions and requirements for remanufacture and rehabilitation of a reparable/unserviceable item.

A3.2.4 Procedural Deficiency. A deficiency which is noted during the audit and which results from either:

A3.2.4.1 Failure by contractor to establish processes/procedures in conformity with contractual requirements; or, A3.2.4.2 Failure by contractor to follow established processes or procedures.

A3.3 RESPONSIBILITIES

A3.3.1 The contractor shall:

FD20302400588 Page 19 of 27

A3.3.1.1 Perform audit functions under the surveillance of the cognizant DOD CAO and Air Logistics Center (ALC) representative(s).

A3.3.1.2 Provide technical personnel, tooling, measuring/test equipment, work areas, forms and clerical assistance, as required, to perform the PVA.

A3.3.2 The cognizant DOD QAR shall:

A3.3.2.1 Be designated as audit team chairman, unless otherwise directed by the Procuring

Contracting Officer (PCO).

A3.3.2.2 Schedule the product verification audit and select the item(s) to be audited.

A3.3.2.3 Notify the PCO and the contractor when the PVA will begin. Notification shall be provided at least 15 working days prior to the audit date. Scheduled audits may be waived by the PCO on a case-by-case basis.

A3.4 AUDIT PROCEDURES

A3.4.1 Classifying Defects. Defects observed in the audited item(s) will be classified according to the following:

A3.4.1.1 Category I - Critical Defect. Defect that judgment and experience indicates likely to result in hazardous/unsafe conditions for individuals using, maintaining or depending upon the product; or a defect that judgment and experience indicates is likely to prevent performance of the tactical function of a major end item such as an aircraft, engine communication system, surveillance system or major part thereof. Critical defects are further identified as follows:

A3.4.1.1.1 Category IA - Defect attributable to the contractor's failure to comply with contractual requirements.

A3.4.1.1.2 Category IB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirement or defective Government Furnished Property (GFP).

A3.4.1.2 Category II - Major Defect. Defect other than critical that is likely to result in failure or reduce materially the usability of unit or product for its intended purpose.

Major defects are further identified as follows:

A3.4.1.2.1 Category IIA - Defect attributable to the contractor's failure to comply with

A3.4.1.2.2 Category IIB - Defect not attributable to contractor's failure to comply with

FD20302400588 Page 20 of 27 contractual requirements such as a design deficiency, inadequate or omitted requirements or defective GFP.

A3.4.1.3 Category III - Minor Defect. Defect that is not likely to reduce materially the usability of the unit or product for its intended purposes or is a departure from established standards having little bearing on the effective use or operation of the unit. Minor defects are further identified as follows:

A3.4.1.3.1 Category IIIA - Defect attributable to the contractor's failure to comply with

A3.4.1.3.2 Category IIIB - Defect not attributable to the contractor.

A3.4.1.4 Category IV - Defect caused during accomplishment of the audit disassembly or inspection process which would not have occurred had the contractor exercised proper care of the audit item, i.e., improper handling, improper disassembly technique.

A3.4.1.5 Procedural Defect – Reference paragraph A3.2.4.

A3.4.2 Scheduling/Frequency

A3.4.2.1 During the initial production phase, one of the first five items may be audited. The frequency for performing subsequent audits will be as specified in the schedule of the contract or by the PCO.

A3.4.2.2 The contractor may be directed by the PCO to extend or increase the frequency of the audits or to increase or decrease the scope thereof pursuant to the "changes" clause of the contract.

A3.4.2.3 Like or similar items may be grouped for audit purposes when the concurrence of the PCO or his designated representative has been obtained.

A3.4.3 Inspection and Test

A3.4.3.1 Audit candidates shall be randomly selected by the cognizant DoD QAR from all items currently available. It shall be the responsibility of the ACO to assure that an adequate number of items from which a random selection can be made are on hand at the time of the audit. Selection, except as specified in paragraph A3.4.3.2 below, shall be made from items which have been accepted by the Government but have not been shipped.

A3.4.3.2 The first five items of the initial production phase shall be set aside after having been tendered by the contractor as in conformity with the contract and inspected by the Government and not rejected for failure to comply with contractual requirements. Upon completing the testing and disassembly portion of the audit of

FD20302400588 Page 21 of 27 the selected candidate and if no Category I or II defects are found during the audit, the other four items will be accepted by the Government. In any Category I or II defect is found in the audit candidate, the contractor shall satisfy the Government that such defect does not exist in the other four items prior to Government acceptance thereof. The audit candidate shall be accepted by the Government upon compliance with paragraph A3.4.4.6 below.

A3.4.3.3 The items selected for audit shall be inspected for adherence to preservation, packing, packaging and marking requirements prior to removal from the shipping container. A visual inspection and functional test shall be performed prior to disassembly.

A3.4.3.4 Disassembly shall be performed in a secure area accessible only to audit participants. Normally, audit participation will be limited to specified contractor production and quality control personnel, the cognizant DoD QAR and ALC personnel.

A3.4.3.5 Visual inspection, dimensional checks (such as backlash, end clearance and running clearance) and non-destructive testing will be accomplished during and after disassembly IAW applicable technical directives. Audit findings will be recorded for comparison with contractual requirements and the contractor's production/inspection records. Measuring and test equipment shall be reviewed for current calibration prior to use.

A3.4.3.6 Applicable accessories and components will be functionally tested and inspected to contractual specifications. This action may require disassembly in excess of the original contractor effort as determined necessary by the Government.

A3.4.4 Corrective Actions

A3.4.4.1 In the event a critical or major defect is observed, Government acceptance of further production will be withheld until the Government has either inspected other items for the observed defect(s) or has received suitable evidence from the contractor that the cause of such defect(s) has been corrected and the defect does not exist in other items. In the case where there is a probability of such defect existing in previously shipped items, the contractor will promptly advise the Government of the identity and destination of such previously shipped items.

A3.4.4.2 When Category IA, IIA or IIIA defects are found, the contractor shall implement measures in the remanufacture process which will preclude recurrence.

A3.4.4.3 When Category IB, IIB or IIIB defects are found, actions will be taken as directed by the Government pursuant to the contract.

A3.4.4.4 When Category IV defects are noted, the contractor shall take those actions necessary to preclude recurrence.

FD20302400588 Page 22 of 27

A3.4.4.5 When Procedural Deficiencies are noted, the contractor shall take those actions necessary to correct the procedures or operations concerned.

A3.4.4.6 Upon completion of the audit, all defects attributable to failure to comply with contractual requirements or attributable to the performance of the PVA shall be corrected. All noted defects shall be corrected and the item assembled and functionally tested IAW applicable remanufacture specifications including preservation, packing, packaging, marking and update of records.

A3.4.4.7 After the audit is completed, the DoD QAR shall conduct a critique attended by contractor personnel and ALC representative(s). Findings, classifications and corrective actions shall be discussed and determination of defect cause(s) established (e.g. workmanship, tooling, technical requirements, etc.). The contractor shall take immediate action to correct and preclude recurrence of all defects or deficiencies attributable to failure to comply with contractual requirements, subject to the provisions of paragraph A3.5.1.10 below.

A3.5 AUDIT RESULTS

A3.5.1 The quality office of the CAO activity shall prepare and forward to the responsible PCO the finalized audit findings within 10 working days after completion of the audit.

Finalized findings will contain the following information:

A3.5.1.1 Name and address of the contractor.

A3.5.1.2 Contract number.

A3.5.1.3 Descriptive noun, Federal Stock Number, part number and serial number of the item audited.

A3.5.1.4 Summary of total defects.

A3.5.1.4.1 Category IA

A3.5.1.4.2 Category IB

A3.5.1.4.3 Category IIA

A3.5.1.4.4 Category IIB

A3.5.1.4.5 Category IIIA

A3.5.1.4.6 Category IIIB

A3.5.1.4.7 Category IV

FD20302400588 Page 23 of 27

A3.5.1.5 A complete listing of audit findings.

A3.5.1.6 A description of defects listed by category (commencing with critical). The defective item will be identified by part number and standard nomenclature.

A3.5.1.7 Cause(s) for each noted defect.

A3.5.1.8 Corrective action(s) taken on each classified defect attributable to failure to comply with contractual requirements, or a projected target date for completion when not otherwise immediately corrected.

A3.5.1.9 Procedural deficiencies noted and the corrective actions applied.

A3.5.1.10 The signature of the DoD QA participants, contractor management personnel and

ALC representative(s). Non-concurrence with the findings shall be specifically annotated in the vicinity of the applicable signatures. Non-concurrence by the contractor as to the existence or classification of a defect or as to whether or not a defect is attributable to failure to comply with contractual requirements shall be subject to the procedures set forth in the clause entitled "Dispute."

FD2030-24-01213

APPENDIX 4

A4.1 Supply Chain Risk Management (SCRM) A4.1.1 The contractor shall identify, assess, plan for, and mitigate actual or potential threats, vulnerabilities, and disruptions to the Air Force's supply chain throughout the lifecycle to ensure mission effectiveness. The contractor shall inform and include the Government in any mitigations or alterations to the program. The SCRM plan shall address the broad spectrum of supply chain risks that have the potential to: jeopardize the integrity of products, services, people, and technologies;

compromise intellectual property; disrupt the flow of product, materiel, information, and finances needed for continued Air Force operations; and drive materiel cost increases to the program. The contractor shall develop and execute processes for identifying supply chain risks as early as possible;

the persistent and comprehensive tracking, monitoring, and re-evaluation of supply chain risks and their corresponding mitigation actions; and communicating supply chain risks to affected stakeholders and the Government. The contractor shall notify in writing the identified actual and potential supply chain risks. The contractor's SCRM program and processes shall apply to the prime and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain, from raw material stage to delivery of a finished product and/or service. As part of the overall SCRM approach, the Contractor shall establish, document and maintain documentation about subcontractors/vendors for all parts that will be used for Government contracts. The contractor shall continuously monitor their sources of supply for unknown, unauthorized, non-certified, or unqualified sources providing parts or services from any sub-tier supplier within the contractor's supply chain. The contractor shall investigate and submit findings to include root causes, impacts and a corrective action.

A4.2.1 Continuity of Operations (COOP)

Contractor shall include a SCRM plan detailing the offeror's supply chain risk management approach, providing specific emphasis on the risks associated with a.) Continuity of Operations b.) Foreign Influence and c.) Cybersecurity. The contractor shall detail the specific supply chain risk (listed below) and provide a management and mitigation plan identifying how the offeror will ensure Supply Chain Risk Management is effective over the life of the contract.

The contractor will develop and/or update a Continuity of Operations Plan (COOP), also known as a Business Operations Plan, which outlines the processes and actions to prepare for, and respond to, unplanned natural and man-made disruptions to mission essential operations and provide that to the U.S. Government. The COOP will address disruptions caused by:

a) natural causes possible in the local vicinity (winter weather, earthquakes, hurricanes, fires, flooding, wind, pandemics, etc.) and

b) man-made causes (cyber attacks, electrical outages, strikes affecting workforce, civil unrest, modes of transportation, and receiving/shipping goods, etc.).

The plan will explain:

how work will continue in the same or alternate facility(ies), ability to use and/or augment the current workforce, ability to repair/restore key infrastructure (machinery, computers, logistics etc.), how to communicate with, and inform the US Government and others in the supply chain.

Contractor shall provide essential records management for personnel working on U.S. government contracts. Records will be accessible to key members of the organization. Contractor shall ensure continuous records management support (training, etc.) despite any changes in personnel.

If applicable the contractor shall prepare for the continuation of essential DoD services during crisis IAW DFARS 252.237-7023, DFARS 252.237-7024, and other applicable references as necessary. In a state of emergency, if the Government deems necessary, the contractor shall provide all services necessary to ensure mission accomplishment. On occasion, services may be required to support an activation, or exercise of contingency plans outside normal duty hours.

A4.3.1 Foreign Influence

The contractor shall disclose any Foreign Ownership, Control or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard Form 328 Certificate Pertaining to Foreign Interest shall be submitted to the Government cognizant security office specified in each

DD254.

The contractor shall provide information regarding FOCI. If the contract requires access to classified information, DD254, Contract Security Classification Specification, shall be required. Contractor shall provide an update on its financial health and potential FOCI when a merger or acquisition occurs.

Foreign contractor participation is excluded at the prime and subcontractor level, unless authorized through a current approved National Interest Determination (NID). It is solely the responsibility of the contractor to obtain necessary certification from the U.S. Department of State and to comply with the federal laws and regulations. Question must be directed to the U. S. Department of State’s Directive of Defense Trade Controls.

Subcontract Management. The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations.

Contractors may add subcontractors to their team only after notification to the Procuring Contracting Officer (PCO) and Contracting Officer Representative (COR).

A4.4.1 Foreign Disclosure:

"Foreign Disclosure Restrictions do not apply."

A4.5.1 Cybersecurity The contractor shall develop and implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. The contractor shall conduct early and continuous monitoring throughout the contract to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology. The contractor's plan shall: a) make specific reference to those aspects of the National Institute of Standards and Technology Special Publication (NIST SP) 800-161, “Supply Chain Risk Management Practices for Federal Information Systems and Organizations” that represent the contractor's implemented processes and practices; b) include a description of how the contractor shall protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alteration, and any other elements that would allow adversaries to gain unauthorized access to data, alter data, interrupt communications, or otherwise disrupt operations; c) inform the U. S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to contractor’s digital information and parts and components and d) make specific reference to those aspects of NIST SP 800-53 that represent the processes and practices the contractor will implement. The plan and processes shall apply to the prime and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain, from raw material stage to delivery of a finished product.

The Contractor and any subcontractors shall provide to the government a system security plan (or extract thereof) and any associated plans of action developed to satisfy the adequate security requirements of DFARS 252.204-7012, and in accordance with NIST Special Publication (SP) 800- 171, “Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the contracting officer, to describe the contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits.

The contractor shall {develop, update} an incident-handling capability plan that utilizes guidance provided in NIST SP 800-61 revision 2, Computer Security Incident Handling Guide, consisting of 1) incident response policy and plan, 2) procedures for performing incident handling and reporting, 3) guidelines for communicating with outside parties regarding incidents, 4) incident team structure and staffing model, 5) relationships and lines of communication between the incident response team and other groups, both internal and external, 6) services the incident response team should provide, and 7) staffing and training the incident response team. Any incident reported to Defense Industrial Base Cybersecurity Program (https:\\dibnet.dod.mil) shall also be reported to the responsible contracting officer within 24 business hours. Cybersecurity (electronic components - FSG 59, with the exception of those that do NOT contain any programmable components) N/A The contractor shall provide information to obtain a Defense Intelligence Agency – Threat Assessment Center (DIA-TAC) Report when National Critical Materials and Critical Components (CC) are known based on the Functional Thread Analysis. The contractor shall trace the Bill of Materials to the lowest critical components. The contractor shall update design via system engineering processes to ensure above-medium risk components are not in the system.

The contractor shall ensure all hardware, with special emphasis on lowest critical components (CCs) and components containing Critical Program Information (CPI), are from trusted sources and are manufactured by approved personnel as documented in the contractor Security Plan. The contractor shall develop a SCRM plan documented in the contractor Security Plan, in accordance with (IAW) the current version of Committee on National Security Systems Directive (CNSSD) No. 505 and NIST SP 800-161, to mitigate supply chain risk. The contractor shall ensure that no critical components procured are on the Section 806 (National Defense Authorization Act for FY 2011 (Public Law 111-383)) and Section 2339a (Title 10, United States Code) Lists in the Supplier Performance Risk System (SPRS) (CDRL 25, 27, 29). The contractor shall develop and implement a Counterfeit Parts Prevention Program in compliance with Defense Federal Regulation (DFAR) 252.246–7007 Contractor Counterfeit Electronic Part Detection and Avoidance System, using SAE AS5553, SAE AS6171, SAE AS6081, and Independent Distributors of Electronics Association (IDEA) Standard [IDEA-STD-1010B] or similar practices to prevent the inclusion of counterfeit parts or parts with malicious logic. The contractor shall perform acceptance testing on lowest CCs and components containing CPI in accordance with the Counterfeit Parts Prevention Program.

APPENDIX 5

A5.1 SURGE

5.1.1 In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or national emergency (also known as surge, reference DFARS 217.208-70 and DFARS 252.217-7001) and invokes surge: The contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. The contractor is required to provide the Government a surge plan. A CDRL and DID are associated with the surge requirement. After being notified of the surge demand in writing, the contractor may see additional orders and/or will see the priority status elevated on current orders. The contractor may do one or more of the following to fill the demand:

5.1.2 The contractor will maintain level of safety stock of components to draw from to perform additional repairs.

5.1.3 Add additional shifts to increase production within the contractor and with suppliers.

The contractor will work with the various manufacturing sites and their supply chain to expedite production. The contractor will be notified in advance of, and be given the opportunity to negotiate; any expedite charges that might apply at the time of surge.

Contractual requirements for production of this contract are addressed in Part I. The schedule and surge requirements will be on a best-effort basis.

5.1.4 Surge plans have four basic phases (assessment, execution, sustainment, and exit/termination) and the plan associated with the surged items requested need to address those phases. The Government will provide, in writing, the items on contract that are requested to be surged. That will include the item, the quantity, and timeline with respect to delivery schedule with estimated termination dates when known.

Contractors will provide a plan that includes the identified surge items, how they are going to meet the requirement, timeline to implement the plan, ability to sustain the surge through termination, identify any limiting factors or supply chain risks that will impact current surge production and future requirements for identified items.

SECTION II
SECTION III
SECTION I
SCOPE
1.0 GENERAL
1.1 DATA
1.2 SECURITY
1.3 QUALITY
1.4 DELIVERY SCHEDULES
1.5 CONDEMNATION, REMANUFACTURE AND REMANUFACTURE
1.6 HANDLING
1.7 INVENTORY
1.8 PRESERVATION
1.9 RECEIPT/HANDLING OF PQDR EXHIBITS
1.10 SAFETY AND HEALTH
1.11 ITEM UNIQUE IDENTIFICATION (IUID)
SECTION II
APPLICABLE DOCUMENTS
2.3 APPLICABLE TECHNICAL ORDERS
2.4 APPLICABLE DIRECTIVES
SECTION III
WORK REQUIREMENTS
3.1 GENERAL WORK REQUIREMENTS
3.2 SPECIFIC WORK REQUIREMENTS
A1.1 ACRONYMS
APPENDIX 2
A2.1 NOTES
APPENDIX 3
A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES
A3.2 TERMS EXPLAINED
A3.3 RESPONSIBILITIES
A3.4 AUDIT PROCEDURES
A3.5 AUDIT RESULTS
APPENDIX 4
A4.1 Supply Chain Risk Management (SCRM)
A5.1 SURGE

File details come from the government source that posted it. Updated .