Production_Surge_Plan.pdf
PDF 157 KB Posted
- Attached to
- F100 220 Rear Turbine Case
- Solicitation number
- FA812125R0021
About this file
This Data Item Description (DID) provides guidelines for creating a Production Surge Plan, which delineates a contractor's capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during peacetime acquisition without formal war mobilization.
The document outlines specific requirements for the Production Surge Plan, including detailing the maximum sustainable production rate, providing lists of subcontracted and non-subcontracted items/components, identifying potential production constraints, and describing impact on other government contracts. Key elements include listing critical items with long-leadtime and potential surge impacts, identifying additional labor requirements, strategic/critical materials needed, and production equipment that could increase production rate or reduce leadtime by at least 10%. The plan is designed to help government contractors prepare for potential rapid production scaling and demonstrate surge production capabilities.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.
Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.
File details come from the government source that posted it. Updated .