This is a Statement of Work (SOW) for a 5-year sprinkler obstruction inspection at FCC Allenwood, a Federal Bureau of Prisons facility located in Allenwood, PA. The contractor will provide equipment, labor, and materials to inspect 115 Wet System Risers, 9 Dry System Risers, 1 Pre-action System Riser, and 2 Suppression Deluge Systems according to NFPA 25 Chapters 13 & 14 requirements.
The work includes inspecting alarm valves, check valves, preaction/deluge valves, and dry pipe valves, along with their associated components like strainers, filters, and orifices. The contractor must work during standard hours (7:00 AM - 4:00 PM, Monday-Friday), obtain security clearances 14 days prior to work, provide Safety Data Sheets, and give 48-hour notice before system disruptions. All tools must be inventoried daily, and contractors must follow strict security protocols including attendance at a 4-hour orientation. The contractor is responsible for housekeeping, proper material storage, and must provide personal protective equipment. No cell phones, cameras, or two-way pagers are allowed on site, and specific dress code requirements apply.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Revised Sprinkler Count.pdf | ||
| Sprinkler Systems List.pdf | ||
| NCIC Form.pdf | ||
| Service Contract Act WD 2015-4255.pdf | ||
| BRQ 15B20125Q00000008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .