This document is a detailed inventory of wet and dry sprinkler systems to be inspected across multiple security levels at the Federal Correctional Complex in Allenwood, Pennsylvania. The comprehensive list categorizes sprinkler systems by security level: Low Security (LSCI) with 24 wet systems and 1 dry system, Medium Security (FCI) with 37 wet systems and 1 dry system, and High Security (USP) with 50 wet systems and no dry systems. Additionally, there are 9 outside wet systems and 4 outside dry systems, totaling 120 wet systems and 6 dry systems across the entire complex.
The inspection scope includes various building types such as administration, mechanical rooms, living units, recreation areas, food services, medical facilities, and specialized areas like UNICOR and towers. Special fire suppression systems to be inspected include Clarke's Spark Detection and Suppression Deluge Systems for UNICOR dust collectors and a Pre-Action System in the Power House. Each security level and building type is meticulously mapped out with specific plumbers assigned to different sections, indicating a structured and comprehensive approach to facility-wide sprinkler system maintenance and safety inspection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Revised Sprinkler Count.pdf | ||
| NCIC Form.pdf | ||
| Service Contract Act WD 2015-4255.pdf | ||
| BRQ 15B20125Q00000008.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LSCI (Low Security) FCI (Medium Security) USP (High Security) Outside Plumber: Gregg McCahan Plumber: Sam Wise Plumber: Gary Sassaman Plumber: Jason Kline
Bldg 5 - Union Main Unit 5 - Mechanical Room Bldg. 1 - Outside Administration Building Garage Bldg. 1 - Admin. Main Floor Unit 5 - 2 Bldg. 1 - Mechanical Room (2nd Floor) Warehouse Bldg. 2 - Main Floor Unit 5 - 1 Main Bldg. 1 - Tunnel UNICOR Warehouse ( x2) Bldg. 2 - Mech. Room Bldg. 1 - Admin. Mech. Room Bldgs. 2 & 3 - Visiting & Health Services Guard Shack Bldg. 3 - Hospital, Main Bldg. 2 - Facilities Dept. Bldgs. 2 & 3 - Mechanical Room Training Center Bldg. 3 - Hospital, Mech. Room Bldg. 3 - Food Service Bldg. 4 - SHU#2 Welding Shop Bldg. 4 - Recreation Main Bldg. 4 - Laundry - Main Bldg. 5 - Inside Admin (Lt.s' & Aws' offices) Power House Bldg. 4 - Recreation Mech. Rm. Bldg. 4 - Laundry - Mech. Bldgs. 6 & 7 Corridor Maitenence Shop Bldg. 4 - Gym Bldg. 5 - UNICOR Bldg. 7 - Unit 4 - A Side Bldg. 5 - UNICOR Main Bldg. 6 - Education Bldg. 7 - Unit 4 - B Side Total OS wet systems: 9 Bldg. 5 - UNICOR High Nec. Bldg. 7 - Visiting Room Bldg. 7 - Unit 4 - First Floor Center Core Bldg. 5 - Education Bldg. 7 - Visiting Mech. Room Bldg. 7 - Unit 4 - Second Floor Mech. Rm.
Bldg. 5 - Mech. - UNICOR Mezz. bldg. 7 - R&D/AWS Area Bldg. 8 - Corridor Bldg. 6 - Food Services Bldg. 8 - Hospital Bldg. 8 - Unit 3 - A Side Bldg. 7 - Facilities Bldg. 8 - Mechanical Room Bldg. 8 - Unit 3 - B Side Bldg. 8 - Brady Unit - Main Bldg. 8 - SHU-A Bldg. 8 - Unit 3 - First Floor Center Core Bldg. 8 - Brady Unit - Mech Bldg. 8 - SHU-B Bldg. 8 - Unit 3 - Second Floor Mech. Rm.
Bldg. 9 - Gregg Unit - Main Bldg. 9A - Recreation Bldg. 9 - Corridor Bldg. 9 - Gregg Unit - Mech Bldg. 9B - Passive Rec. Bldg. 9 - Unit 2 - A Side Bldg. 10 - Lycoming Unit - Main Bldg. 9B - Passive Rec. Mech. Bldg. 9 - Unit 2 - B Side Bldg. 10 - Lycoming Unit - Mech. Bldg. 10A - Unit 1 - A Bldg. 9 - Unit 2 - First Floor Center Core Bld.g 11 - Union Unit - Main Bldg. 10A - Unit 1 - B Bldg. 9 - Unit 2 - Second Floor Mech. Rm.
Bldg. 11 - Union Unit - Mech. Bldg. 10A - Unit 1 - Main Bldg. 10 - Corridor Rear Gate Bldg Bldg. 10A - Unit 1 - Mech. Bldg. 10 - Unit 1 - A Side
Bldg. 10B - Unit 2 - A Bldg. 10 - Unit 1 - B Side Total LSCI wet systems: 24 Bldg. 10B - Unit 2 - B Bldg. 10 - Unit 1 - First Floor Center Core
Bldg. 10B - Unit 2 - Main Bldg. 10 - Unit 1 - Second Floor Mech. Rm.
Bldg. 10B - Unit 2 - Mech. Bldg. 12 - Corridor Bldg. 10C - Unit 3 - A Bldg. 12 - Gym Bldg. 10C - Unit 3 - B Bldg. 12 - Zone 12 Corridor (Weight Area?)
Bldg. 10C - Unit 3 - Main Bldgs. 13 & 14 - Corridor Bldg. 10C - Unit 3 - Mech. Bldgs. 13 & 14 - Rec. & Library, First Floor Bldg. 10D - Unit 4 - A Bldgs. 13 & 14 - Rec. & Library Mech. Room Bldg. 10D - Unit 4 - B Bldg. 15 & 16 - Corridor Bldg. 10D - Unit 4 - Main Bldg. 15 - Religious Svcs.
Bldg. 10D - Unit 4 - Mech. Bldg. 16 - Commissary, Lndry, Safety Rear Gate Bldg Bldg. 16 - Mech. Room
Bldg. 17 - Corridor Total FCI wet systems: 37 Bldg. 17 - Food Service
Bldg. 17 - Second Floor Bldg. 18 - UNICOR Bldg. 19 - Facilities Tower 1 Tower 2 Tower 3 Tower 4 Tower 5 Tower 6 Tower 9 Rear gate Bldg
Total USP wet systems: 50 *(note: Towers 7 & 8 are part of Inside Admin & Rec.)
LSCI (Low Security) FCI (Medium Security) USP Outside UNICOR Shed - dry UNICOR - dry none Warehouse - dry
Garage Vehicle Maint. - dry Garage Landscape Shop - dry Garage Bus Bays - dry
Other Fire Suppression Systems to be Inspected LSCI (UNICOR Dust Collector) - Clarke's Spark Detection and Suppression Deluge System FCI (UNICOR Dust Collector) - Clarke's Spark Detection and Suppression Deluge System
Wet Sprinkler Systems to be Inspected
Power House - Pre-Action
Dry Sprinkler Systems to be Inspected
Per-Action System to be Inspected
LSCI Wet Systems: 24 FCI Wet Systems: 37 USP Wet Systems: 50 Outside Wet Systems: 9 Total Wet systems: 120
LSCI Dry Systems: 1 FCI Dry Systems: 1 USP Dry Systems: 0 Outside Dry Systems: 4 Total Dry systems: 6