SOW.pdf

PDF 117 KB Posted

Attached to
HVAC Replacement - VA Federal contract opportunity
Solicitation number
140FC225R0005
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This Statement of Work details the requirements for HVAC replacement at Harrison Lake National Fish Hatchery's main office building in Charles City, VA. The Fish and Wildlife Service requires removal of a 30-year-old fuel burning unit and oil tank, to be replaced with a new minimum 3-ton, 14 SEER heat pump system.

The scope includes installing a new heat pump with structural pad, snow legs, matching air handler, 15 Kw heater kit, EZ trap with condensate shut off switch, drain pan, thermostat, and electrical circuits (60 Amp and 30 Amp). The contractor must remove the old unit, oil tank, all lines, and flue pipe, then re-shingle the roof where the flue pipe was located. The period of performance is 90 days after award, with work to be performed Monday through Friday, 8:00 a.m. - 4:30 p.m. Contractors must possess a current Professional Contractor License and Class A License to be eligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Replacement - VA, newest first.
File Type Posted
Sol_140FC225R0005_Amd_0001.pdf PDF
Provisions___Clauses_0001.pdf PDF
B08_Bid_Shedule.pdf PDF
Sol_140FC225R0005.pdf PDF
Wages.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

HVAC - at Harrison Lake National Fish Hatchery, 11110 Kimages Road, Charles City, VA 23030

1. General:

1.1 Harrison Lake National Fish Hatchery has a need for a new HVAC unit in the main office building.

1.2 Current unit is 30 years old. Multiple repairs are made each year and parts for this unit are becoming difficult to obtain. We wish to have the old fuel burning unit removed as well as the oil tank and replaced with an economically and environmentally sound HVAC unit that is reliable and energy efficient. We wish to have a minimum 3 Ton 14 S.E.E.R unit, all necessary lines, structural pad, thermostat, heater units and heat pump installed, the old unit removed and hauled away, and the oil tank hauled away.

1.3 Contractor is to be able to provide new HVAC unit and accessory items listed in section 3.1.

2. Performance

2.1 The project period of performance is to be completed no later than 90 days after award. Project will take place at Harrison Lake National Fish Hatchery, main office building.

2.2 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.

2.3 Non duty hours include week nights, weekends, and Government holidays.

3. Scope

3.1 Contractor shall supply minimum 3-ton, seer 14 heat pump, structural pad, snow legs, new line set, new matching air handler, 15 Kw heater kit, EZ trap with condensate shut off switch, drain pan, thermostat for temperature control, supply electrical circuit from panel to new unit, removal of old unit and removal of empty outdoor oil tank. All lines will be removed along with the Flue Pipe going through the roof. Roofing will be shingled over where old flue pipe used to penetrate. A 60 Amp and 30 Amp Electrical circuit will be run from the panel box to the new air handler. Contractor shall notify hatchery manager immediately of any problems or delay in completion or disruption of daily hatchery activities.

4. Deliverables and/or Delivery Schedule:

4.1 Additional specifics of deliverables required for the project are below:

a. Disconnect and remove old unit

b. Install structural pad, snow legs

c. Install heat pump, air handler with shut off switch, and heater kit

d. Connect all new lines, drain pan, and electric circuit

e. Connect new thermostat and test unit

e. Remove old unit and remove drained oil tank

f. Remove lines and Flue pipe going through the roof

g. Re-shingle roof where flue pipe did exist

h. Run electrical to new unit

i. Test new unit

4.2 Provide product manuals or documentation is necessary.

5. Evaluation and Acceptance

5.1 The Government reserves the right to evaluated work at any time.

6. Quality Control/Quality Assurance:

6.1 For commercial supplies reference clauses for inspection and acceptance. Where appropriate, QC will be maintained according to industry standards and made available to the agency prior to start of work.

6.2 Quality control measures include functioning unit.

6.3 To be eligible for award, a current Professional Contractor License(s) for subject work and a Class A

License number must be submitted with or shortly after proposal.