SOW - Controller Repair.pdf

PDF 1022 KB Posted

Attached to
Replace Omron PLC at USDA Facility in Ithaca, NY
Solicitation number
1125488
Issued by

About this file

This document is a Statement of Work (SOW) for the repair/replacement of a failed Omron Programmable Logic Controller (PLC) that controls the automatic operation of sump pumps at the USDA-ARS Robert W. Holley Center in Ithaca, New York. The project involves harvesting the existing program, reconfiguring it, and programming it into a new compatible PLC. The contractor must provide a wiring diagram and ensure the replacement PLC is fully compatible with the existing equipment. The project has a negotiable schedule, and contractors are required to coordinate with the Facilities Operations Specialist.

The related federal contract opportunity is a combined synopsis/solicitation issued as a Request for Quotation (RFQ) for the repair of the Omron PLC and panel. The Government intends to award a Firm Fixed-Price (FFP) contract to the lowest-priced offeror that fully meets the specifications, including full compatibility with the listed equipment. Offers must include a fixed-price quotation, a Unique Entity ID, and completed Offeror Representations and Certifications. The solicitation is open to all responsible sources, and the performance location is the USDA-ARS facility in Ithaca, New York.

View the file

Other files

File Type Posted
Wiring Diagram.jpg JPG image
Questions and Responses 1125488.pdf PDF
SOW.Omron PLC replacment 5.9.24.pdf PDF
SOW.Omron PLC replacment 5.8.24.pdf PDF
CLAUSES_PROVISIONS_ (1).pdf PDF
SCA Wage Determination 2015-4153 R23.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Project Title: USDA-ARS Robert W. Holley Center Omron Programmable Logic Controller (PLC) repair / replacement.

2. Project Location: 538 Tower Road, Ithaca, N.Y. 14853

3. Introduction: The USDA-ARS Center for Agriculture and Health is located on the Cornell University Campus in Ithaca, N.Y.

4. Project Summary: This small project is needed for replacement of a failed Omron Programmable Logic Controller (PLC) for control of automatic sump pump operations.

5. Technical Requirements: The existing controller has failed and is in need of replacement to resume automatic operation of tandem sump pumps. The program contained within the existing controller must be harvested, reconfigured and programmed into a new PLC. The existing controller will then be removed and replaced. The contractor shall provide a wiring diagram will be provided to facilitate future diagnostics.

Provided equipment for any replacement PLC must be fully compatible and an equivalent replacement for the brand and model pictured below:

If a contractor intends to provide replacement parts that are other than the brand pictured, descriptive literature must be provided on the model being proposed along with statements on how it is 100% compatible with existing equipment.

6. Site Specific Measures: Contractor is to coordinate with Facilities Operations Specialist or their designee.

7. Project Schedule: Negotiable, please provide earliest possible completion date with quote.

8. Contact list:

Michael Merchant – Facilities Operations Specialist michael.merchant@usda.gov 607-342-3380 cell

File details come from the government source that posted it. Updated .