SOW.Omron PLC replacment 5.8.24.pdf
PDF 1 MB Posted
- Attached to
- Replace Omron PLC at USDA Facility in Ithaca, NY
- Solicitation number
- 1125488
About this file
This document is a Statement of Work (SOW) for the replacement of a failed Omron Programmable Logic Controller (PLC) at the USDA-ARS Robert W. Holley Center in Ithaca, N.Y. The project requires the existing PLC program to be harvested, reconfigured, and programmed into a new PLC, which must be compatible with the existing equipment. The contractor must provide a wiring diagram and manufacturer's warranty information. All work must be performed by an authorized representative of the PLC manufacturer.
The related federal contract opportunity is a solicitation for commercial products and services to repair the Omron PLC and panel that operates critical pumps at the USDA, ARS facility in Ithaca, N.Y. The Government intends to award a Firm Fixed-Price contract to the lowest price offeror that fully meets the specifications, including full compatibility with the existing equipment. Offers must include a firm fixed-price quotation, Unique Entity ID, and completed Offeror Representations and Certifications. The solicitation is open to all responsible sources, and the Government reserves the right to conduct discussions. Quotes are due by May 10, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wiring Diagram.jpg | JPG image | |
| Questions and Responses 1125488.pdf | ||
| SOW.Omron PLC replacment 5.9.24.pdf | ||
| SOW - Controller Repair.pdf | ||
| CLAUSES_PROVISIONS_ (1).pdf | ||
| SCA Wage Determination 2015-4153 R23.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(Updated 5.8.2024)
1. Project Title: USDA-ARS Robert W. Holley Center Omron Programmable Logic Controller (PLC) repair / replacement.
2. Project Location: 538 Tower Road, Ithaca, N.Y. 14853
3. Introduction: The USDA-ARS Center for Agriculture and Health is located on the Cornell University Campus in Ithaca, N.Y.
4. Project Summary: This small project is needed for replacement of a failed Omron Programmable Logic Controller (PLC) for control of automatic sump pump operations.
5. Technical Requirements: The existing controller has failed and is in need of replacement to resume automatic operation of tandem sump pumps. The program contained within the existing controller must be harvested, reconfigured and programmed into a new PLC. The existing controller will then be removed and replaced. The contractor shall provide a wiring diagram will be provided to facilitate future diagnostics.
All work must be performed by an authorized representative of the PLC manufacturer.
Manufacturer’s warranty information, shall be provided to the Government.
Provided equipment for any replacement PLC must be fully compatible and an equivalent replacement for the brand and model pictured below:
If a contractor intends to provide replacement parts that are other than the brand pictured, descriptive literature must be provided on the model being proposed along with statements on how it is 100% compatible with existing equipment.
6. Site Specific Measures: Contractor is to coordinate with Facilities Operations Specialist or their designee.
7. Project Schedule: Negotiable, please provide earliest possible completion date with quote.
8. Contact list:
Michael Merchant – Facilities Operations Specialist michael.merchant@usda.gov 607-342-3380 cell