SOW_Cold_Storage_Builidng_Roof_Repair_v2.docx

DOCX document 16 KB Posted

Attached to
Repair of Cold Storage Bldg. Fergus Falls MN
Solicitation number
140FC224Q0012
Issued by

About this file

This statement of work outlines repair and sealing work required on a cold storage building roof and door frames located at a U.S. Fish and Wildlife Service facility in Fergus Falls, Minnesota. The work includes replacing all screws in the metal roof and siding with screws supplied by the Service, taking care not to overtighten screws in previously used holes. All door frames must be sealed at the top corners to prevent water leaks. The contractor must complete all work by June 1, 2024 and adhere to inspection and acceptance requirements. Work hours are limited to refuge duty hours unless coordinated otherwise with the on-site point of contact, Chad Raitz. This statement of work corresponds to federal contract opportunity number 140FC224Q0012 for repair of the cold storage building roof in Fergus Falls, with the Department of the Interior Fish and Wildlife Service listed as the contracting agency.

View the file

Other files

File Type Posted
Questions___Answers_0001.docx DOCX document
Bldg_Picture_1_0001.png PNG image
SOW_Cold_Storage_Building_Roof_Repair_v3_0001.docx DOCX document
Bldg_Picture_2_0001.png PNG image
Building_Drawings_0001.pdf PDF
Sol_140FC224Q0012_Amd_0001.pdf PDF
Wage_Determination_MN20220090.pdf PDF
Provisions_and_Clauses.pdf PDF
Sol_140FC224Q0012.pdf PDF
Construction_Contract_Administration.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Project: Repair of Cold Storage Building Roof and Sealing of Door Frames

Work will consist of roof repair and door frame sealing on a 90’ X 160’ Lester cold storage building located at the U.S. Fish and Wildlife Service, 18965 County Highway 82, Fergus Falls, MN, 56537. The building has a metal roof and siding with 8 overhead doors and 4 walk-through doors.

The work will consist of the following.

1. All the screws in the roof will be removed and replaced with screws supplied by the U.S. Fish and Wildlife Service. Care must be taken when installing the new screws in the previously used screw holes so that the new screws do not get over tightened and ruin the rubber gasket. The screws furnished will be industry standard for metal siding/roofing with rubber gaskets.

2. All door frames need to be sealed at the top corners to prevent water leaks.

Delivery Schedule:

Work must be completed by June 1, 2024.

Inspection and Acceptance:

The work shall be accepted when all the work is completed as described here within and in accordance with any contract specifications. Work shall be inspected to assure compliance with the contract documents. Quality control and adherence to all contract requirements is still the responsibility of the contractor.

The station point of contact must complete written confirmation of the cleaning and observable quality control acceptance prior to payment authorization.

Availability:

Contractor must complete work during normal refuge duty hours, work outside these hours or on Federal holidays must be coordinated with the station point of contact.

Location Address:

U.S. Fish and Wildlife Service - Fergus Falls Wetland Management District 18965 County Highway 82 Fergus Falls, MN 56537

Points of Contact:

On-site: Chad Raitz, Wildlife Refuge Specialist, chad_raitz@fws.gov, 218-736-0637