This is a Statement of Work (SOW) and solicitation package for HVAC replacement and related services at Iroquois National Wildlife Refuge Quarters in Basom, New York.
The solicitation seeks a contractor to remove the existing fuel-oil HVAC system and install a new energy-efficient propane-fired furnace with central air conditioning at 1069 Casey Road, Basom, NY 14013. The contract period runs from July 6, 2026 to September 30, 2026, with work hours limited to Monday through Friday, 8:00 a.m. to 4:30 p.m. Key required tasks include: installing a new propane furnace and central air conditioning; installing a touchscreen programmable thermostat; performing load calculations; sealing ductwork and insulation; installing a code-compliant CO/smoke detector with battery backup; performing test-and-balance procedures; and removing and disposing of the oil-fired furnace per federal, state, and local regulations. The solicitation is structured as eight Contract Line Item Numbers (CLINs) covering base HVAC replacement, CO/smoke detector installation, oil tank removal and disposal, ductwork and lineset replacement, test-adjust-balance services, O&M manuals and personnel training, safety plan development, and structural modifications. Award is scheduled for June 24, 2026, with quotes due June 15, 2026 at 3:00 PM EDT. The contract will be awarded as a Firm-Fixed-Price (FFP) purchase order under FAR Parts 12, 13, or 15, and is set aside for small business concerns. The Government Point of Entry (sam.gov) will post the award notice. Quotes must be submitted electronically to William_Koski@ios.doi.gov. Applicable wage determinations are provided (NY General Decision Number NY20260110, effective 01/02/2026), and contractors must comply with Davis-Bacon Act labor standards, Buy American construction materials requirements, and numerous federal regulations including OSHA, EPA, Clean Air Act, and National Wildlife Refuge System regulations. All CLINs are priced independently and must represent complete and final compensation including overhead, profit, mobilization, submittals, testing, cleanup, and demobilization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC226Q0030_Amd_0001.pdf | ||
| Questions_and_Answers_20260528_0001.pdf | ||
| Iroquois_NWR_Pictures.pdf | ||
| Sol_140FC226Q0030.pdf | ||
| Attachment_Section_B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Heating, Ventilation, and Air Conditioning (HVAC) Replacement
Iroquois National Wildlife Refuge Quarters
1069 Casey Road, Basom, NY 14013
1. General Background & Objective:
This contract is to replace the HVAC and install a wired carbon monoxide and smoke detector at
Iroquois National Wildlife Refuge Quarters located at 1109 Casey Road, Basom, NY 14013.
The contractor will provide all materials and labor to remove the existing fuel-oil boiler and
HVAC components at Refuge Quarters. The contractor will remove and dispose of all boiler components. Contractor will provide all services, parts, and labor required to install a new energy-efficient propane fired furnace and central air conditioning, along with a hardwired
CO/Smoke detector in the vicinity of the HVAC system.
The purpose of this replacement is to improve the HVAC system’s efficiency and performance. With only one certified technician qualified to work on the existing heating‑oil furnace in the Greater Buffalo, Rochester, and Syracuse areas, and due to the aging and non‑energy‑efficient equipment, this replacement will reduce repair costs and improve system reliability.
2. Place of Performance, Period of Performance and Work Hours
Place of Performance
Iroquois National Wildlife Refuge Quarters
1069 Casey Road, Basom, NY 14013
Period of Performance
July 6, 2026 to September 30, 2026
Milestones:
Solicitation: May 28, 2026
Site Visit: June 3, 2026, POC- Bill Stewart, bill_stewart@fws.gov , or 315 568-5987 x4224
Questions Due: June 4, 2026, 3:00 PM EDT to Bill Koski, William_koski@ios.doi.gov .
Quotes Due: June 15, 2026, 3:00 PM EDT to Bill Koski, William_koski@ios.doi.gov .
Award: June 24, 2026
Work Hours
All work shall be performed Monday through Friday, 8:00 a.m. to 4:30 p.m. Access to the facility mailto:bill_stewart@fws.gov mailto:William_koski@ios.doi.gov mailto:William_koski@ios.doi.gov will be granted by Iroquois NWR personnel. Non-work hours include weeknights, weekends, and federal holidays.
3. Scope
The project consists of replacing the existing heating-oil-based HVAC system with a Department of Energy–qualified propane gas-utilizing HVAC system with central air conditioning attached.
The new system shall meet current industry standards for efficiency and technology. The contractor shall provide an itemized cost breakdown including materials, equipment, labor, administrative fees, and other applicable charges.
Required Tasks
Under this contract, the contractor shall complete the following tasks:
Install new energy efficient propane fired furnace.
Install new intake and vent out the back of the house.
Install central air conditioning.
Install new touchscreen, smart programmable thermostat
Seal all ducting and insulation.
Perform load calculation for proper sizing of equipment.
Install a code‑compliant combination carbon monoxide/smoke detector with battery backup.
Perform test-and-balance procedures.
Remove and dispose of oil fired furnace per federal, state and local regulations.
4. Deliverables and/or Delivery Schedule
All work shall be performed on site at 1069 Casey Road, Basom, NY 14013. Iroquois NWR will not provide labor, equipment or materials.
Contractor shall provide product submittals for all equipment to be installed.
Contractor shall provide copy of all warranty information, including model and serial numbers as applicable.
Contractor shall conduct on-site operational training for refuge personnel.
5. Safety Plan
The contractor shall, at a minimum, follow all OSHA rules and procedures. A written safety plan must be submitted and approved prior to beginning work. This plan shall identify all hazards related to the work and outline measures to mitigate risk.
6. Quality Assurance, Inspection and Acceptance
The contractor shall maintain a quality control program ensuring compliance with commercial standards and manufacturer installation guidelines. Refuge personnel will evaluate performance as work progresses.
7. Applicable Federal Regulations and Codes
The contractor shall comply with all applicable Federal, State, and Local regulations, including but not limited to the following:
Federal Regulations
Occupational Safety and Health Administration (OSHA) – 29 CFR
Environmental Protection Agency (EPA) – 40 CFR
Clean Air Act (refrigerant recovery and disposal)
Clean Water Act (as applicable)
Hazardous waste regulations (oil tank removal, refrigerant disposal)
National Wildlife Refuge System Regulations – 50 CFR Subchapter C (Parts 25–38) 2
Federal Lands Laws Applicable to Work on Refuge Property
Refuge Recreation Act (16 U.S.C. 460k‑460k‑4)
National Wildlife Refuge System Improvement Act (Public Law 105‑57)
Federal Lands Recreation Enhancement Act (16 U.S.C. Chapter 87)
Construction, Mechanical, and Building Codes
International Building Code (IBC)
International Mechanical Code (IMC)
International Fire Code (IFC)
National Electrical Code (NFPA 70)
NFPA 101 – Life Safety Code
National Environmental Balancing Bureau (NEBB) standards
Associated Air Balance Council (AABC) standards
ASHRAE Standards and Guidelines
Federal Contracting Requirements
The contractor shall:
Comply with all incorporated FAR and DIAR clauses, including reporting, labor standards, inspections, warranties, and required certifications.
Comply with Service Contract Labor Standards when applicable.
Maintain all records in accordance with Federal and DOI records-management laws;
unlawful removal or destruction of records is punishable under 18 U.S.C. 2071 and 36
CFR 1230.12.
Protect all sensitive information and follow DOI information-handling requirements.
Ensure no supervision or control by Government personnel over contractor employees
(non-personal services requirement).
Provide all labor, supervision, equipment, materials, and incidentals not furnished by the
Government.
Ensure all subcontractors, if used, comply with all clauses, regulations, and responsibilities.
Restore any affected areas to pre-work condition at no cost to the Government.
8. Technical Coordinator:
Bill Stewart, Refuge Manager, bill_stewart@fws.gov, 315-729-2456
Nick Vermuelen, Maintenance Worker, nicholas_vermeulen@fws.gov, 315-283-2331 mailto:bill_stewart@fws.gov mailto:nicholas_vermeulen@fws.gov
SECTION B — SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 General
The contractor shall furnish all labor, supervision, equipment, materials, transportation, and incidentals necessary to perform the work described in the Statement of Work (SOW) for the
HVAC Replacement at Iroquois NWR Quarters.
This contract will be awarded as a Firm-Fixed-Price (FFP) purchase order in accordance with
FAR Part 12 (Acquisition of Commercial Products and Commercial Services) and FAR Part 13 or FAR Part 15 depending on the final procurement method applied by the Contracting Officer.
B.2 Pricing
All CLINs shall be priced independently.
All CLIN totals shall represent the complete and final compensation for the work required, including overhead, profit, mobilization, submittals, testing, cleanup, and demobilization.
B.3 Contract Line Item Numbers (CLINs)
CLIN 0001 – Base HVAC Replacement (FFP)
Quantity: 1
Unit: Job
Description:
All labor, materials, and equipment necessary to remove the existing fuel-oil HVAC system and install a new energy-efficient HVAC system as specified in Section 3 of the SOW.
Total Price: $__________
CLIN 0002 – CO/Smoke Detector Installation (FFP)
Quantity: 1
Unit: Job
Description:
Furnish and install a code-compliant hardwired combination carbon monoxide and smoke detector with battery backup, meeting Amanda’s Law and all federal, state, and local regulations.
CLIN 0003 – Oil Tank Removal and Disposal (FFP)
Unit: Job
Description:
Pump out existing oil, remove and dispose of the oil tank, and manage hazardous waste in accordance with EPA 40 CFR, Clean Water Act, and Clean Air Act requirements.
CLIN 0004 – Ductwork and Lineset Replacement (FFP)
Unit: Job
Description:
Remove and replace all ductwork, condensate lines, refrigerant lines, and linesets necessary for proper system integration, including sealing to minimum R-9 and ensuring compatibility with
R-410A refrigerant.
CLIN 0005 – Test, Adjust, and Balance (TAB) Services (FFP)
Unit: Job
Description:
Perform certified NEBB/AABC-compliant test and balance of all installed HVAC systems and submit a complete TAB report.
CLIN 0006 – O&M Manuals and Personnel Training (FFP)
Unit: Job
Description:
Provide O&M manuals (2 hard-bound), warranty package, submittals, and training for Refuge personnel as required in Section 4 of the SOW.
CLIN 0007 – Safety Plan and Hazard Mitigation
Unit: Job
Description:
Preparation of detailed OSHA-compliant safety plan, hazard analysis, and mitigation steps beyond those required in CLIN 0001.
CLIN 0008 – Additional Ducting / Structural Modifications
Unit: Job
Description:
Additional ductwork modifications, structural adjustments, or wiring upgrades required due to unforeseen site conditions discovered during performance.
B.4 Total Estimated Contract Value
CLIN Description FFP Amount ($)
0001 HVAC System Replacement ________
0002 CO/Smoke Detector Installation ________
0003 Oil Tank Removal/Disposal ________
0004 Ductwork & Linesets ________
0005 TAB Services ________
0006 O&M Manuals / Training ________
0007 Safety Plan ________
0008 Structural Modifications ________
Total All CLINS $_____________
Iroquois NWR Quarters HVAC Replacement SOLICITATION NO. 140FC226Q0030
FWS
Section Title
Part I—The Schedule
A Solicitation/Contract Form
B Prices
C Description/Specifications/Statement of Work
D Packaging and Marking
E Inspection and Acceptance
F Project Delivery
G Contract Administration Data
H Special Contract Requirements
Part II—Contract Clauses
I Contract Clauses
Part III—List of Documents, Exhibits, and Other Attachments
J List of Attachments
Part IV—Representations and Instructions
K Representations, Certifications, and other Statements of Offerors
L Instructions, Conditions, and Notices to Offerors
M Evaluation Factors for Award
SECTION B – PRICES (QUOTE SCHEDULE)
See Attached Section B (1 page)
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
See Attached SOW
(End of Section C)
SECTION D – PACKAGING AND MARKING
D.1.0 PAYMENT OF POSTAGE FEES
All postage and fees related to submitting information forms, reports, etc., to the CO or the COR shall be paid by the contractor.
D.2.0 MARKING
All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.
(End of Section D)
SECTION E – INSPECTION AND ACCEPTANCE
The following clauses are incorporated by reference:
52.246-12 INSPECTION OF CONSTRUCTION AUG 1996
(End of Section E)
SECTION F – PROJECT DELIVERY
F.1.0 PERIOD OF PERFORMANCE
The Contractor shall be required to (a) commence work under this contract within __12_____ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than _____98_______.* The time stated for completion shall include final cleanup of the premises.
52.242-14 SUSPENSION OF WORK APR 1984
(End of Section F)
SECTION G – CONTRACT ADMINISTRATION DATA
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP)
(February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform
System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Invoice billed according to contract line items and rates.
2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.
3. If the partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.
4. If final payment is billed, the last invoice shall state “FINAL”.
5. Contractor’s Release of Claims shall be submitted with the final invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor
Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve
Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-
3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
(End of Section G) https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1.0 WORK HOURS
Unless otherwise specified in Section C, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be performed on Saturday, Sunday, or Federal holidays unless authorized by the COR.
H.2.0 ENVIRONMENTAL INTERRUPTION OF WORK
H.2.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration. An allowance has been included in the contract time for environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions.
H.2.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, are discovered to be present in or adjacent to the project area.
H.3.0 DRAWINGS
H.3.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the COR.
H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data
(including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in Section I of this contract.
H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
H.5.0 SUBSTITUTION – PROCESSION OF WORK
Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the
RFQ response. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.
H.6.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with
Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the
Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ); the Endangered Species Act, as amended (16 U.S.C. Sec
1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic
Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C.
6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).
Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
H.7.0 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is unexpectedly encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
H.8.0 GREEN PROCUREMENT REQUIREMENTS
In the performance of this construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, as applicable:
U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.
USDA Biobased product listings published at www.biopreferred.gov.
Energy Star® product listings published at www.energystar.gov/products.
FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories
Contractor shall comply with all reporting requirements of the following clauses when applicable (See Clause and
Provision sections):
52.223-1 Biobased Product Certification
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts.
52.223-4 Recovered Material Certification
52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items
H.9.0 UNAUTHORIZED PERSONNEL
The contractor shall inform all personnel working under their jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
H.10.0 CONSTRUCTION WAGE RATES APPLICABLE TO TRUCK DRIVERS
29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon
Act.
H.11.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
(End of Section H)
SECTION I – CONTRACT CLAUSES
Clause Title Date
52.201-1 DEFINITIONS JUN 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements JAN 2017
52.204-1 Approval of Contract DEC 1989
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS
DEC 2014
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS
NOV 2015
52.213-4 TERMS AND CONDITIONS-SIMPLIFIED ACQUISITIONS (OTHER THAN
COMMERCIAL ITEMS)
DEV MAR 2026
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE DEV JAN 2026
52.222-3 CONVICT LABOR JUN 2003
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS AUG 2018
52.222-7 WITHHOLDING OF FUNDS MAY 2014
52.222-8 PAYROLLS AND BASIC RECORDS JUL 2021
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988
52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014
52.222-12 CONTRACT TERMINATION – DEBARMENT MAY 2014
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND
RELATED REGULATIONS
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS – PRICE ADJUSTMENT
(NONE OR SEPARATELY SPECIFIED PRICING METHOD
AUG 2018
52.222-31 CONSTRUCTION WAGE RATE REQUIREMENTS – PRICE ADJUSTMENT
(PERCENTAGE METHOD)
AUG 2018
52.222-32 Construction Wage Rate Requirements - - Price Adjustment (Actual Method) AUG 2018
52.222-50 COMBATING TRAFFICKING IN PERSONS OCT 2020
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 JAN 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022
52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026)
(DEVIATION
APR 2026)
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts MAY 2024
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY FEB 2021
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION. MAY 2011
52.223-11 Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons
MAY 2024
52.223-12 Maintenance, Service, Repair, or Disposal of Regrigeration Equipment and Air MAY 2024
Conditioners
52.223-23 Sustainable Products and Services (DEVIATION FEB 2025) MAY 2024
52.225-9
Buy American—Construction Materials OCT 2022
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING
MAY 2024
52.227-1 Authorization and Consent JUN 2020
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement JUN 2020
52.227-4 PATENT INDEMNITY-CONSTRUCTION CONTRACTS DEC 2007
52.228-13 Alternative Payment Protections JUL 2000
52.228-13 Alternative Payment Protections JUL 2000
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017
52.232-33 Payment by Electronic Funds Transfer—System for Award Management OCT 2018
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN 2013
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS
MAR 2023
52.233-3 PROTEST AFTER AWARD. AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. OCT 2004
52.236-2 DIFFERING SITE CONDITIONS APR 1984
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK APR 1984
52.236-5 MATERIAL AND WORKMANSHIP APR 1984
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984
52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
APR 1984
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984
52.236-12 CLEANING UP APR 1984
52.236-13 ACCIDENT PREVENTION NOV 1991
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES APR 1984
52.236-16 QUANTITY SURVEYS APR 1984
52.236-17 LAYOUT OF WORK APR 1984
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION FEB 1997
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION – ALTERNATE I APR 1984
52.240.91 Security Prohibitions and Exclusions
52.243-5 CHANGES AND CHANGED CONDITIONS APR 1984
52.244-6 Subcontracts for Commercial Products and Commercial Services (DEVIATION FEB
2025)
Oct 2025
52.245-1 GOVERNMENT PROPERTY. SEP 1991
52.245-9 USE AND CHARGES APR 2012
52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
52.247-63 Preference for U.S.-Flag Air Carriers JAN 2025
The following clauses are provided in full text:
52.225-9 – BUY AMERICAN–CONSTRUCTION MATERIALS (OCT 2022)
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at
Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the
U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding
COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding
COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/25.105#FAR_25_105 https://www.acquisition.gov/far/25.105#FAR_25_105 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/12.505#FAR_12_505 contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
________________________________________________[Contracting Officer to list applicable excepted materials or indicate
"none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the
Government determines that-
(i)The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1)The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2)For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1)The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2)For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the
Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting
Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
https://www.acquisition.gov/far/25.105#FAR_25_105
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the
Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
(End of clause)
52.247-69 REPORTING REQUIREMENT FOR U.S.-FLAG AIR CARRIERS REGARDING TRAINING TO PREVENT
HUMAN TRAFFICKING (JAN 2025)
a) Definitions. As used in this clause—
Human trafficking means “Severe forms of trafficking in persons” or “Sex trafficking.”
Severe forms of trafficking in persons means—
(1) Sex trafficking in which a commercial sex act is induced by force, fraud, or coercion, or in which the person induced to perform such act has not attained 18 years of age; or
(2) The recruitment, harboring, transportation, provision, or obtaining of a person for labor or services, through the use of force, fraud, or coercion for the purpose of subjection to involuntary servitude, peonage, debt bondage, or slavery.
Sex trafficking means the recruitment, harboring, transportation, provision, or obtaining of a person for the purpose of a commercial sex act.
(b) Annual reporting requirement.
(1) In accordance with 49 U.S.C. 40118(g), the Contractor shall provide the annual report described in paragraph (b)(2) of this clause by October 30th, via email, to the following agencies:
(i) General Services Administration: TraffickingPreventionReport@gsa.gov;
(ii) U.S. Department of Transportation: trafficking@dot.gov;
(iii) Department of Labor: AirCarrier-HTreports@dol.gov;
(iv) Transportation Security Administration: ics-cchtfams@tsa.dhs.gov;
(v) U.S. Customs and Border Protection: CLP@cbp.dhs.gov; and
(vi) DHS Center for Countering Human Trafficking: Info@CCHT.dhs.gov.
(2) The annual report shall include information from the preceding Government fiscal year (October 1 through September 30) regarding—
(i) The number of personnel trained in the detection and reporting of potential human trafficking, including the training required under 49 U.S.C. 44734(a)(4);
(ii) The number of notifications of potential human trafficking victims received from staff or other passengers; and
(iii) https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section40118&num=0&edition=prelim mailto:TraffickingPreventionReport@gsa.gov mailto:trafficking@dot.gov mailto:AirCarrier-HTreports@dol.gov mailto:ics-cchtfams@tsa.dhs.gov mailto:CLP@cbp.dhs.gov mailto:Info@CCHT.dhs.gov https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section44734&num=0&edition=prelim
(A)Whether the Contractor notified the Global Human Trafficking Hotline, another comparable hotline, or law enforcement at the relevant airport of the potential human trafficking victim for each such notification of potential human trafficking; and
(B) If the Contractor made a notification, the date the notification was made and the method of notification (e.g., text to Hotline, call to law enforcement).
(c) Training. In accordance with 49 U.S.C. 44734 and 44738, personnel trained in the detection and reporting of potential human trafficking should include the following:
(1) Flight attendants;
(2) Ticket counter agents;
(3) Gate agents; and
(4) Other air carrier workers whose jobs require regular interaction with passengers.
1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011) [use when a COR will be delegated]
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the
COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the
Contractor's risk.
1452.203-70 Restrictions on Endorsements. Restriction on Endorsements - Department of the interior (JUL 1996)
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in
FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the
Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting
Officer to make a determination as to the propriety of promotional material.
https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section44734&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title49-section44738&num=0&edition=prelim
1452.204-70 RELEASE OF CLAIMS (JUL 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
1452.215-70 Examination of Records by the Department of the Interior. Examination of Records by the Department of the
Interior (APR 1984)
For purposes of the Examination of Records by the Comptroller General clause of this contract (FAR 52.215-1), the Secretary of the Interior, the Inspector General, and their duly authorized representative(s) from the Department of the Interior shall have the same access and examination rights as the Comptroller General of the United States.
1452.236-70 PROHIBITION AGAINST USE OF LEAD-BASED PAINT—DEPARTMENT OF THE INTERIOR (JUL
1996) [use when construction of residential structures or rehabilitation (including dismantling, demolition, or removal) of residential structures is contemplated]
Paint containing more than .06 percent by weight of lead in paint, or the equivalent measure of lead in the dried film of paint already applied, shall not be used in the construction or rehabilitation of residential structures under this contract or any resulting subcontracts.
1452.204-70 RELEASE OF CLAIMS (JUL 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
(End of clause)
1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)
As prescribed in section 1401.670-1, insert the following clause:
Authorities and Delegations (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence.