SOW Caterpillar Generator Assembly Rebuild FINAL.pdf
PDF 172 KB Posted
- Attached to
- Caterpillar Generator Rebuild
- Solicitation number
- FA8228-25-Q-0008
About this file
This Statement of Work (SOW) details a contract for rebuilding Caterpillar generator assemblies for the 309th Electronics Maintenance Group (309 EMXG) at Hill Air Force Base. The contractor will recondition generator assemblies using the Integrated Power Services (IPS) PowerSeal medium-voltage Vacuum Pressure Impregnation (VPI) process, bringing units to a fully functional state. Mandatory replacement parts include specific heat sinks, bearings, and washers from Caterpillar and Marathon, which are listed in Appendix B.
Key contract requirements include performing functionality checks and calibration, providing individual certificates of repair for each assembly, and delivering completed components to 526 EMXS/MXDXX at Hill Air Force Base. The contractor must safeguard government-furnished property, notify the government 2 business days before shipment, and provide a standard commercial warranty ensuring original failures are corrected. The contract involves shipping equipment to the contractor's facility for repair and returning reconditioned units that are serviceable and issuable to all customers without limitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Authorized Caller List.docx | DOCX document | |
| CDRL A002 - Work Completion Certification.pdf | ||
| CDRL A001 - Certificate of Quality Audit Compliance.pdf | ||
| Synopsis Solicitation-FA8228-25-Q-0008.pdf | ||
| SSJ-Caterpillar Generator Assembly Recondition_Redacted.pdf | ||
| Solicitation - FA822825Q0008-Redacted.pdf | ||
| Price List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
GENERATOR ASSEMBLY REBUILD
U.S AIR FORCE
309TH ELECTRONICS MAINTENANCE GROUP (309 EMXG)
HILL AIR FORCE BASE
6/5/2025
Generator Assembly Rebuild i
TABLE OF CONTENTS
1 Scope
2 Basic Services
3 CDRL Summary
4 Government Furnished Property
5 Warranty
6 Delivery
7 Appendices
Appendix A
Appendix B
1 SCOPE
The contractor shall recondition caterpillar generators for the 309th Electronic Maintenance
Group (309 EMXG) utilizing the Integrated Power Services (IPS) PowerSeal™ medium-voltage
Vacuum Pressure Impregnation (VPI) process and return the assets back to the customers as reconditioned materiel, serviceable and issuable to all customers without limitation or restriction.
2 BASIC SERVICES
2.1 The contractor shall recondition Caterpillar generator assemblies, bringing them to a fully functional state. The mandatory replacement parts are outlined in Appendix B.
2.2 The government will ship the equipment to the contractor’s facility for repair.
2.3 Once repairs are completed, the contractor shall perform a functionality check and calibration. The contractor shall provide individual certificates of repair for each assembly. [CDRL A001]
2.4 The contractor shall provide a Work Completion Certification.[CDRL A002]
3 CONTRACT DATA REQUIREMENTS LIST (CDRL) SUMMARY
EXHIBIT
Title
PWS
Paragraph
Delivery
A001 Certificate of Compliance 2.4 Upon delivery of parts
A002 Work Completion Certification 2.5 Upon delivery of parts
4 GOVERNMENT FURNISHED PROPERTY (GFP)
4.1 Government Furnished Property (GFP) will be issued via hand receipt to the contractor when repairs are needed. The contractor shall safeguard all GFP placed into the contractor’s care.
4.2 While GFP is in the contractor’s possession the contractor is liable for any loss, damage, destruction, or theft.
4.3 The contractor shall record and report promptly (within one hour) to the contracting officer or 526 EMXS all available facts relating to each instance of damage to
Government property.
4.4 The contractor is responsible for returning all GFP to the Government after repair is complete at the destination specified in the contract, FOB destination unless directed otherwise in writing by the Contracting Officer.
5 WARRANTY
5.1 The contractor shall provide a standard commercial warranty on repaired units for the government to ensure the original failures have been corrected and that the units function properly for all required applications.
6 DELIVERY
6.1 The contractor shall notify the Government at least 2 business days before shipment and provide tracking details.
6.2 Deliver completed components to:
526 EMXS/MXDXX
5832 H Ave, Bay L
Hill Air Force Base, UT 84056
7 APPENDICES
A. Acronyms and Abbreviations List
B. Parts List
APPENDIX A
ACRONYMS AND ABBREVIATIONS LIST
CDRL Contract Data Requirement List
CO Contracting Officer
EMXG Electronics Maintenance Group
FOB Free on Board
GFP Government Furnished Property
OEM Original Equipment Manufacture
PWS Performance Work Statement
SOW Statement of Work
APPENDIX B
Parts List
Mandatory Replacement Parts Caterpillar
Heat Sink P/N 290-5564 NSN 5999-01-623-3972 Bearing P/N 6315-2Z/C3LHT55 NSN 3110-01-024-7595 Washer P/N MS35338-140 NSN 5310-00-974-6623 (13)
Marathon Washer P/N A-9682 NSL (4)
Bearing P/N B-7812R-80 NSL Washer P/N A-7675-2RC NSN 5810-01-691-1307 (8)
File details come from the government source that posted it. Updated .