SOW Boiler Maint-Trng V1.pdf

PDF 234 KB Posted

Attached to
Annual Boiler and Water Heater Preventative Maintenance, Safety Testing, and Technician Hands-On Tra
Solicitation number
43ADG-S4084
Issued by
Washoe County, Nevada

About this file

This Scope of Work is issued by the Nevada Army National Guard Office of Installations and Environment for annual preventative maintenance, safety testing, and technician hands-on training services. The Nevada Army National Guard seeks competitive proposals from licensed mechanical and boiler contractors to perform comprehensive annual preventative maintenance, ASME CSD-1 safety testing, and combustion tuning across twelve high-efficiency condensing boilers and commercial water heaters distributed across two state facility sites: 2000 Army Aviation Drive in Reno, Nevada (10 units) and 2460 Fairview Drive in Carson City, Nevada (2 units). The equipment includes Hydrotherm KN-10 and KN-6 cast iron condensing hydronic boilers, Lochinvar WHM286 Armor Series boilers, Lochinvar Shield Series commercial water heaters, and Lochinvar FTX400N FTXL fire-tube condensing hydronic boilers with input ratings ranging from 285,000 to 1,000,000 BTU/hour. The project requires contractors to deliver concurrent "Do and Teach" hands-on training to up to four state facility maintenance specialists with a maximum ratio of two state technicians per contractor master technician. Deliverable milestones include ASME CSD-1 and NAC 455C test certificates, combustion analysis reports, maintenance checklists, deficiency and capital replacement logs, reconciled parts receipts, and training sign-off rosters, all due within ten business days following completion of work at each facility. The proposal due date and project start date/Notice to Proceed are contingent upon final approval and availability of state and federal funding.

Contractors must meet specific qualifications including an active Nevada State Contractors Board license in classification C-1, C-1A, or C-21, and assigned technicians must hold valid factory training certifications from Lochinvar Corporation with a minimum of five years of verifiable commercial service experience. All work must comply strictly with Nevada Administrative Code Chapter 455C, Nevada Revised Statutes Chapter 455C, ASME Boiler and Pressure Vessel Code Sections IV and CSD-1, National Board Inspection Code, NFPA 54 and 85, and Nevada OSHA standards. The contractor bears 100 percent responsibility for furnishing all required original equipment manufacturer maintenance kits, replacement parts, gaskets, ignition assemblies, filters, condensate neutralizer media, testing instrumentation, and consumables as detailed in Attachment A. Prior to contract approval, vendors must provide a State of Nevada Business License, proof of liability and workers' compensation insurance naming the Office of the Military as the certificate holder and additionally insured, vendor registration with the State of Nevada Controllers Office, and agreement to use electronic transfer for payment. All personnel working on National Guard property must submit completed Nevada National Guard Annex H background check forms and possess valid government-issued identification. The payment schedule is to be determined by the NVARNG Project Manager, and all scheduling and commencement dates are contingent upon receipt of state and federal funding and issuance of a written Notice to Proceed.

View the file

Other files

File Type Posted
Invitation to Bid - Boiler.pdf PDF
Quote Instructions.pdf PDF
Boiler Cost Schedule.xlsx XLSX spreadsheet
SOW Boiler Maint-Trng Attachement A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nevada Army National Guard Office of Installations and Environment Scope of Work Summary

Date: November 10, 2026 Project: Annual Boiler and Water Heater Preventative Maintenance, Safety Testing, and Technician Hands-On Training

General Intention: This Scope of Work is intended to include all work required to complete the project described below. Vendors who submit proposals are required to include and disclose in their proposal all work deemed necessary to complete the project.

Task(s): Perform annual maintenance, safety testing, combustion tuning, and concurrent “Do and Teach” hands-on training for twelve (12) boilers and commercial water heaters at the Reno and Carson City facilities.

Scope of Work:

The State of Nevada is seeking competitive, qualified proposals from licensed mechanical/boiler contractors to execute comprehensive annual preventative maintenance, ASME CSD-1 safety testing, and combustion tuning across twelve (12) high-efficiency condensing boilers and commercial water heaters distributed across two (2) state facility sites.

In addition to performing all maintenance services, the Contractor shall execute a structured "Do and Teach" collaborative training model. The selected contractor’s factory-certified master technicians will perform the work side-by-side with designated State Facility Maintenance Specialists, providing hands-on instruction covering inspection methods, mechanical disassembly/assembly, critical diagnostic indicators, and routine preventative servicing.

The Contractor is strictly responsible for furnishing 100% of all required original equipment manufacturer (OEM) maintenance kits, replacement parts, gaskets, ignition assemblies, combustion air filters, condensate neutralizer media, testing instrumentation, and consumables necessary to complete the servicing.

All contractor-furnished OEM parts, materials, consumables, and step-by-step procedural service requirements are detailed in Attachment A of this solicitation (Attachment A: Contractor-Furnished OEM Parts, Consumables & Detailed Technical Specifications of Work), which is incorporated herein as an enforceable requirement of this contract.

Contractor Qualifications and Regulatory Compliance

The Contractor must satisfy all State of Nevada vendor requirements:

• Licensing: Active Nevada State Contractors Board license in good standing under classification C-1 (Plumbing and Heating Contracting) or subclassifications (C-1A Boilers or C-21 Refrigeration and Air Conditioning).

• Technician Certifications: Technicians assigned to the project must hold valid factory training certifications Lochinvar Corporation, with a minimum of five (5) years of verifiable commercial service experience.

• Statutory Standards: All work and safety testing must comply strictly with:

• Nevada Administrative Code (NAC) Chapter 455C (Boilers, Elevators, and Pressure Vessels).

• Nevada Revised Statutes (NRS) Chapter 455C.

• ASME Boiler and Pressure Vessel Code (Sections IV and CSD-1: Controls and Safety Devices for

Automatically Fired Boilers).

• National Board Inspection Code (NBIC).

• NFPA 54 (National Fuel Gas Code) and NFPA 85.

• Nevada OSHA industrial safety standards (including Lockout/Tagout - 29 CFR 1910.147).

• State Regulatory Filings: The Contractor must assist state facility staff in compiling and certifying all documentation required for submission to the State of Nevada Mechanical Compliance Section (Division of Industrial Relations).

Customer Responsibilities

• Existing as-built drawings, utility campus scans, or geotechnical reports for the project area, if available.

• Access to the installation and project sites

• Applicable National Guard, DoD, UFC requirement documents.

Deliverable Milestones

Within ten (10) business days following completion of work at each facility, the Contractor shall deliver:

• ASME CSD-1 / NAC 455C Test Certificates: Completed and signed safety inspection sheets for all 12 units.

• Combustion Analysis Reports: Digital analyzer printouts (initial and final at low, mid, and high fire) affixed to each boiler jacket and compiled in a master closeout binder.

• Maintenance Checklists: Completed, line-by-line preventive maintenance verification sheets for each asset.

• Deficiency & Capital Replacement Log: Written documentation of observed piping wear, pump seal degradation, or potential future mechanical liabilities.

• Reconciled Parts Receipt: Proof of 100% factory OEM part installation.

• Training Sign-Off Roster: Validated completion certificates detailing course hours and technician attendance.

Hands-On Instructional Training Program

A core deliverable is the technical development of State of Nevada facility maintenance personnel. The Contractor’s master technician shall deliver structured, hands-on instruction concurrent with maintenance activities.

• Format & Attendance:

• Training occurs side-by-side during scheduled maintenance shifts across both sites.

• Participation: Up to four (4) State Facility Maintenance Specialists.

• Ratio: Maximum 2 state technicians per contractor master technician during active teardown, inspection, and calibration.

Payment Schedule

To be determined by the NVARNG Project Manager

Should you require further information relative to the project before submitting a proposal, please let me know as soon as possible.

Conditions to Work on National Guard Property:

All vendors are hereby notified that prior to entering any National Guard site that they are subject to have their persons, vehicles, and equipment searched at any time. All vendors must have a valid, government issued ID (State Driver’s License) to gain entrance to National Guard sites and they must keep it on their persons at all times while on National Guard property. Vendors are also required to have their vehicles legally registered and insured and to be prepared to show the vehicles registration and insurance to gain access to the base. Vendors with employees who have felonies, sex offences, and/or warrants may be denied access to the base. The Nevada National Guard reserves the right to deny access to any person at any time. Vendors who are awarded contracts will be required to have a Nevada National Guard Annex H (Background Check) form filled out, submitted and approved by the Nevada National Guard before entry onto the base to perform services. This form is required for all personnel who will be working on site.

Safety Requirements:

All vendors shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work. All work shall be performed in strict accordance with the most current edition of the State of Nevada Occupational Safety and Health Standards as applicable. Vendors shall take all necessary precautions for the safety of, and shall provide all necessary protection to prevent damage, injury or loss to; all employees on the project and all other persons who may be affected thereby, all of the work, whether in storage on or off site, and all property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, and utilities. Vendors shall comply with all applicable laws, ordinances, rules, and regulations of any public authority having jurisdiction for the safety of persons or property, or to protect them from damage, injury, or loss.

Location(s) and Equipment Inventory

Services and hands-on instructional training shall be performed on the twelve (12) assets scheduled below, grouped by facility location:

Facility Site 1: 2000 Army Aviation Drive, Reno, NV (10 Units Total)

Qty Equipment Type Manufacturer Model Input Rating (Each)

Primary Function

3 Cast Iron Condensing Hydronic Boilers

Hydrotherm KN-10 1,000,000 BTU/hr Facility Hydronic Heating

3 Cast Iron Condensing Hydronic Boilers

Hydrotherm KN-6 600,000 BTU/hr Facility Hydronic Heating

2 High-Efficiency Condensing Boilers

Lochinvar WHM286 (Armor Series)

285,000 BTU/hr Domestic Hot Water / Heating

2 Direct-Fired Commercial Water Heaters

Lochinvar Shield Series Commercial Standard

Domestic Potable Hot Water

Facility Site 2: 2460 Fairview Drive, Carson City, NV (2 Units Total)

Qty Equipment Type Manufacturer Model Input Rating (Each)

Primary Function

2 Fire-Tube Condensing Hydronic Boilers

Lochinvar FTX400N (FTXL Series)

399,999 BTU/hr Facility Hydronic Heating

Proposals Due By:

Proposals are due date specified in Nevada ePro.

Proposals Should Include:

Include confirmation of the scope of work and the cost for the work. Should you need additional project information before submitting your proposal, please do not hesitate to reach out to one of the POC’s listed below.

Project Schedule:

TBD by NVARNG Project Manager. Start date/NTP to commence upon selection of vendor. All scheduling, milestone dates, and the Commencement Date outlined in this Scope of Work are subject to and contingent upon the final approval and availability of State and/or Federal funding. The Contractor is not obligated to commence on-site operations until the Owner issues a written Notice to Proceed, which will only be issued upon receipt of said funds.

Point(s) of Contact:

Contract Support/Questions – Devin Earl (775) 887-7280 Project Manager(s) – Isaac Fuentes (725) 212-2592 Sandor Duran (775) 350-5289

End of Summary

Note: The following documents are required prior to contract approval: State of Nevada Business License, vendor must provide at a minimum, proof of liability and worker’s compensation insurance (the insurance certificate must name the Office of the Military 2460 Fairview Drive Carson City, NV 89701 as defined in NRS 41.0307 as the certificate holder and additionally insured), vendor must be a registered vendor with State of Nevada Controllers Office, and vendor must use electronic transfer for payment.

Attachment A

Contractor-Furnished OEM Parts, Consumables and Detailed Technical Specifications of Work

PART I: CONTRACTOR-FURNISHED OEM PARTS & CONSUMABLES

The Contractor shall furnish 100% of all required OEM parts, components, and chemical consumables. Third-party, non-OEM, or rebuilt parts will not be accepted.

A. Site 1: 2000 Army Aviation Drive, Reno, NV

• Hydrotherm KN-10 (3 Units) & KN-6 (3 Units):

• OEM Burner Gasket Replacement Sets (complete per unit).

• Pilot assembly tubes, spark ignition electrodes, and UV scanners/flame rods.

• Air intake filter media replacement elements.

• Sight glass gasket sets and clean-out access plate seals.

• Condensate trap float mechanisms and internal cleanout seals.

• Lochinvar WHM286 Armor Boilers (2 Units):

• OEM Annual Preventative Maintenance Kits (burner door gaskets, ignitor gaskets, flame sensor gaskets, blower seals).

• Direct spark ignitors and flame rectification probes.

• Condensate trap assembly cleanout o-rings.

• Lochinvar Shield Commercial Water Heaters (2 Units):

• OEM Burner Door Gasket & Flange Seal Sets.

• Surface ignitor assemblies and flame sensor rods.

• Anode inspection hardware and access port gaskets.

• Condensate drain trap cleanout seals.

B. Site 2: 2460 Fairview Drive, Carson City, NV

• Lochinvar FTX400N FTXL Boilers (2 Units):

• Lochinvar OEM Annual Maintenance Gasket Kits (combustion chamber seals, heat exchanger inspection door gaskets, sight glass kits).

• Direct spark ignitor assemblies and flame rectification sensors.

• High-capacity replacement air inlet filters.

• Condensate trap seals and cleanout hardware.

C. System-Wide Consumables & Chemicals (Both Sites)

• Condensate Media: Pelletized calcium carbonate / magnesium oxide neutralizer replenishment media for all twelve (12) neutralization canisters.

• Cleaning Solutions: Non-acidic, heat-exchanger wash chemistry approved by Hydrotherm and Lochinvar for cast-iron and stainless-steel surfaces.

• Hardware & Lubricants: High-temperature anti-seize compound for burner and cleanout hardware; replacement stainless-steel fasteners where necessary.

• Analyzer Supplies: Calibrated combustion analyzer sensor cells, test printer paper, and zero-calibration gas.

PART II: DETAILED TECHNICAL SCOPE OF WORK

The Contractor shall execute the following technical procedures on all twelve (12) assets in direct collaboration with state facility personnel:

1. Pre-Service Operational Evaluation

• Access onboard control diagnostics (Hydrotherm HeatNet boards and Lochinvar SMART SYSTEM / SMART TOUCH). Record runtime hours, ignition cycles, lockout histories, and active error codes.

• Inspect mechanical room clearances, combustion air louvers, motorized intake dampers, and exhaust vent joints for structural integrity and code compliance under NAC 455C.

• Perform baseline combustion test at high and low fire; log baseline O₂, CO₂, CO, stack temperature, and combustion efficiency.

2. Lockout / Tagout (LOTO) & Disassembly

• Apply formal Lockout/Tagout to individual electrical disconnect switches and manual gas isolation cocks.

• Disconnect gas supply train unions, control harnesses, and combustion air intake ducts.

• Unbolt and remove burner access doors and heat exchanger clean-out covers.

3. Fireside & Heat Exchanger Servicing

• Hydrotherm KN-10 & KN-6: Clean cast-iron pin heat exchanger passages using factory-approved non-wire brushes and high-efficiency vacuuming. Inspect woven metal fiber burner mesh for tears or degradation; clean with regulated compressed air (max 30 psi).

• Lochinvar WHM286, FTX400N & Shield: Inspect stainless-steel heat exchanger tubes/waterways for particulate buildup and mineral scale. Rinse fireside surfaces thoroughly with approved low-pressure chemical flush; drain entirely through the condensate drain. Inspect internal refractory insulation blocks for cracking, erosion, or spalling; replace compromised insulation.

4. Fuel Train, Ignition & Burner Maintenance

• Remove and discard existing ignitors, spark rods, and flame sensors. Install new contractor-supplied OEM replacements.

• Inspect, gauge, and set spark gap tolerances and probe alignments strictly to manufacturer specifications.

• Clean pilot assemblies, sight glass viewports, and blower fan impellers.

• Perform electronic leak check across the entire gas train; verify positive mechanical shut-off of dual safety shutoff valves (SSOVs).

5. Condensate Drain & Neutralization Servicing

• Disassemble, scrub, and flush all internal and external condensate traps, float valves, and drain lines.

• Evacuate spent neutralizing media from all twelve (12) neutralization vessels.

• Refill neutralizer tanks with fresh calcium carbonate/magnesium oxide media; confirm effluent discharge pH stabilizes within code limits (6.5-8.5).

6. Hydronic & Waterside Verification

• Inspect system circulating pumps, mechanical seals, flange connections, and expansion tanks.

• Verify hydronic system operating pressure and record differential pressure across each heat exchanger.

• Inspect and clean inline hydronic strainers where isolation valves allow.

• Collect hydronic and domestic loop water samples to verify absence of excessive scale and confirm proper inhibitor chemistry.

7. ASME CSD-1 & NAC 455C Safety Interlock Testing

Perform functional trip testing and calibration of all onboard and external safety devices:

• Flame Safeguard: Test flame failure response time and confirm positive pilot and main flame lockout within factory time limits.

• Low-Water Cutoffs (LWCO): Execute manual slow-drain tests on float-type LWCOs and electronic trip tests on probe-type units; verify automatic burner shutdown and non-recycling manual reset function.

• Temperature Limits: Test operational temperature controllers and calibrate manual-reset high-temperature limits.

• Pressure Switches: Test and calibrate high and low gas pressure switches, blocked flue switches, and combustion air proving differential pressure switches.

• Safety Relief Valves: Visually inspect all ASME-rated pressure relief valves for signs of weeping or corrosion;

verify discharge piping termination meets code; test manual lift levers where system conditions permit.

8. Reassembly, Commissioning & Dynamic Combustion Tuning

• Reassemble all units using new contractor-furnished OEM gaskets and o-rings. Tighten fasteners to factory torque specifications using star-pattern sequences.

• Install new combustion air intake filters.

• Re-energize units and execute complete multi-point combustion analysis across the entire firing range (low-fire, mid-fire, high-fire).

• Adjust fuel-air ratio control valves to achieve factory operational envelopes:

• Hydrotherm KN Series: Balance CO₂ and O₂ per manufacturer curve; maintain CO below 50 ppm air-free.

• Lochinvar FTXL, WHM & Shield: Adjust combustion offset to achieve 8.8%-9.3% CO₂ (Natural Gas) with trace CO emissions throughout modulating range.

• Print digital analyzer receipts, affix one copy to each unit’s exterior jacket, and include duplicate copies in the formal project closeout binder.