About this file
This Scope of Work document is issued by the Nevada Army National Guard Office of Installations and Environment for comprehensive boiler maintenance and training services. The project encompasses twelve boiler units located at two sites: 2000 Army Aviation Drive in Reno, Nevada, and 2460 Fairview Drive in Carson City, Nevada. The equipment includes six Hydrotherm KN-series boilers, two Lochinvar WHM286 Armor boilers, two Lochinvar Shield commercial water heaters, and two Lochinvar FTX400N FTXL boilers. The contractor is required to furnish 100 percent of original equipment manufacturer (OEM) parts and chemical consumables, including burner gasket replacement sets, ignition components, flame sensors, filters, condensate trap assemblies, and system-wide neutralizer media and cleaning solutions. The scope of work details eight major technical procedures: pre-service operational evaluation with onboard diagnostics and baseline combustion testing; lockout/tagout and disassembly; fireside and heat exchanger servicing; fuel train, ignition, and burner maintenance; condensate drain and neutralization servicing; hydronic and waterside verification; ASME CSD-1 and NAC 455C safety interlock testing; and reassembly with dynamic combustion tuning across multiple firing ranges.
The document does not specify pricing terms, contract duration, renewal options, response dates, due dates, award dates, or set-aside classifications. No incumbent contractor is identified, and no funding sources or amounts are stated in this attachment. The work requires strict adherence to manufacturer specifications and Nevada code requirements, with final deliverables including digital combustion analyzer receipts affixed to each unit and documentation submitted in a formal project closeout binder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Boiler Maint-Trng V1.pdf | ||
| Invitation to Bid - Boiler.pdf | ||
| Quote Instructions.pdf | ||
| Boiler Cost Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nevada Army National Guard Office of Installations and Environment Scope of Work Summary
Attachment A
Contractor-Furnished OEM Parts, Consumables and Detailed Technical Specifications of Work
PART I: CONTRACTOR-FURNISHED OEM PARTS & CONSUMABLES
The Contractor shall furnish 100% of all required OEM parts, components, and chemical consumables. Third-party, non-OEM, or rebuilt parts will not be accepted.
A. Site 1: 2000 Army Aviation Drive, Reno, NV
• Hydrotherm KN-10 (3 Units) & KN-6 (3 Units):
• OEM Burner Gasket Replacement Sets (complete per unit).
• Pilot assembly tubes, spark ignition electrodes, and UV scanners/flame rods.
• Air intake filter media replacement elements.
• Sight glass gasket sets and clean-out access plate seals.
• Condensate trap float mechanisms and internal cleanout seals.
• Lochinvar WHM286 Armor Boilers (2 Units):
• OEM Annual Preventative Maintenance Kits (burner door gaskets, ignitor gaskets, flame sensor gaskets, blower seals).
• Direct spark ignitors and flame rectification probes.
• Condensate trap assembly cleanout o-rings.
• Lochinvar Shield Commercial Water Heaters (2 Units):
• OEM Burner Door Gasket & Flange Seal Sets.
• Surface ignitor assemblies and flame sensor rods.
• Anode inspection hardware and access port gaskets.
• Condensate drain trap cleanout seals.
B. Site 2: 2460 Fairview Drive, Carson City, NV
• Lochinvar FTX400N FTXL Boilers (2 Units):
• Lochinvar OEM Annual Maintenance Gasket Kits (combustion chamber seals, heat exchanger inspection door gaskets, sight glass kits).
• Direct spark ignitor assemblies and flame rectification sensors.
• High-capacity replacement air inlet filters.
• Condensate trap seals and cleanout hardware.
C. System-Wide Consumables & Chemicals (Both Sites)
• Condensate Media: Pelletized calcium carbonate / magnesium oxide neutralizer replenishment media for all twelve (12) neutralization canisters.
• Cleaning Solutions: Non-acidic, heat-exchanger wash chemistry approved by Hydrotherm and Lochinvar for cast-iron and stainless-steel surfaces.
• Hardware & Lubricants: High-temperature anti-seize compound for burner and cleanout hardware; replacement stainless-steel fasteners where necessary.
• Analyzer Supplies: Calibrated combustion analyzer sensor cells, test printer paper, and zero-calibration gas.
PART II: DETAILED TECHNICAL SCOPE OF WORK
The Contractor shall execute the following technical procedures on all twelve (12) assets in direct collaboration with state facility personnel:
1. Pre-Service Operational Evaluation
• Access onboard control diagnostics (Hydrotherm HeatNet boards and Lochinvar SMART SYSTEM / SMART
TOUCH). Record runtime hours, ignition cycles, lockout histories, and active error codes.
• Inspect mechanical room clearances, combustion air louvers, motorized intake dampers, and exhaust vent joints for structural integrity and code compliance under NAC 455C.
• Perform baseline combustion test at high and low fire; log baseline O₂, CO₂, CO, stack temperature, and combustion efficiency.
2. Lockout / Tagout (LOTO) & Disassembly
• Apply formal Lockout/Tagout to individual electrical disconnect switches and manual gas isolation cocks.
• Disconnect gas supply train unions, control harnesses, and combustion air intake ducts.
• Unbolt and remove burner access doors and heat exchanger clean-out covers.
3. Fireside & Heat Exchanger Servicing
• Hydrotherm KN-10 & KN-6: Clean cast-iron pin heat exchanger passages using factory-approved non-wire brushes and high-efficiency vacuuming. Inspect woven metal fiber burner mesh for tears or degradation; clean with regulated compressed air (max 30 psi).
• Lochinvar WHM286, FTX400N & Shield: Inspect stainless-steel heat exchanger tubes/waterways for particulate buildup and mineral scale. Rinse fireside surfaces thoroughly with approved low-pressure chemical flush; drain entirely through the condensate drain. Inspect internal refractory insulation blocks for cracking, erosion, or spalling; replace compromised insulation.
4. Fuel Train, Ignition & Burner Maintenance
• Remove and discard existing ignitors, spark rods, and flame sensors. Install new contractor-supplied OEM replacements.
• Inspect, gauge, and set spark gap tolerances and probe alignments strictly to manufacturer specifications.
• Clean pilot assemblies, sight glass viewports, and blower fan impellers.
• Perform electronic leak check across the entire gas train; verify positive mechanical shut-off of dual safety shutoff valves (SSOVs).
5. Condensate Drain & Neutralization Servicing
• Disassemble, scrub, and flush all internal and external condensate traps, float valves, and drain lines.
• Evacuate spent neutralizing media from all twelve (12) neutralization vessels.
• Refill neutralizer tanks with fresh calcium carbonate/magnesium oxide media; confirm effluent discharge pH stabilizes within code limits (6.5-8.5).
6. Hydronic & Waterside Verification
• Inspect system circulating pumps, mechanical seals, flange connections, and expansion tanks.
• Verify hydronic system operating pressure and record differential pressure across each heat exchanger.
• Inspect and clean inline hydronic strainers where isolation valves allow.
• Collect hydronic and domestic loop water samples to verify absence of excessive scale and confirm proper inhibitor chemistry.
7. ASME CSD-1 & NAC 455C Safety Interlock Testing
Perform functional trip testing and calibration of all onboard and external safety devices:
• Flame Safeguard: Test flame failure response time and confirm positive pilot and main flame lockout within factory time limits.
• Low-Water Cutoffs (LWCO): Execute manual slow-drain tests on float-type LWCOs and electronic trip tests on probe-type units; verify automatic burner shutdown and non-recycling manual reset function.
• Temperature Limits: Test operational temperature controllers and calibrate manual-reset high-temperature limits.
• Pressure Switches: Test and calibrate high and low gas pressure switches, blocked flue switches, and combustion air proving differential pressure switches.
• Safety Relief Valves: Visually inspect all ASME-rated pressure relief valves for signs of weeping or corrosion;
verify discharge piping termination meets code; test manual lift levers where system conditions permit.
8. Reassembly, Commissioning & Dynamic Combustion Tuning
• Reassemble all units using new contractor-furnished OEM gaskets and o-rings. Tighten fasteners to factory torque specifications using star-pattern sequences.
• Install new combustion air intake filters.
• Re-energize units and execute complete multi-point combustion analysis across the entire firing range (low-fire, mid-fire, high-fire).
• Adjust fuel-air ratio control valves to achieve factory operational envelopes:
• Hydrotherm KN Series: Balance CO₂ and O₂ per manufacturer curve; maintain CO below 50 ppm air-free.
• Lochinvar FTXL, WHM & Shield: Adjust combustion offset to achieve 8.8%-9.3% CO₂ (Natural Gas) with trace CO emissions throughout modulating range.
• Print digital analyzer receipts, affix one copy to each unit’s exterior jacket, and include duplicate copies in the formal project closeout binder.