SOW - Big Fans.pdf

PDF 64 KB Posted

Attached to
Big Ass Fan Maintenance
Solicitation number
FA302026Q0060
Issued by

About this file

This is a Scope of Work document for fan maintenance and inspection services.

The contractor is responsible for conducting comprehensive inspections and maintenance of industrial fans and their associated electrical systems during normal business hours (7:30 a.m. to 4:30 p.m., Monday through Friday). Work must utilize OSHA-approved two-man scissor lifts, and bridge cranes in the work area must be locked out during maintenance activities. The scope encompasses physical inspection of fan components including hubs, airfoils, mounting hardware (verified with torque wrench), breather caps, oil levels, safety cables, guy wires, and mounting methods. The contractor must verify that fans are plumb and level, inspect for corrosion and metal degradation, examine supplemental steel supports and weld integrity, and assess wiring methods and raceway isolation. Electrical verification duties include confirming proper motor and controller connections, checking fault history, verifying correct fuse sizing, confirming Variable Frequency Drive (VFD) maximum frequency settings remain unchanged, and clearing VFD debris. The contractor must document all findings but is explicitly excluded from performing repair work for incorrect fan mounting, damaged parts, or other identified deficiencies—such repairs require contracting officer authorization. All additional findings must be documented and reported for further action.

View the file

Other files

File Type Posted
AMENDMENTS.pdf PDF
CLSExport_FA302026Q0060.pdf PDF
RFO Combo.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

GENERAL:

• All work must be completed within normal working hours of 7:30 a.m. to 4:30 p.m., Monday through Friday.

• If applicable, bridge cranes in or near fan installation area must be locked out during fan maintenance.

• Lift must be an OSHA-approved, two-man scissor lift, unless otherwise specified.

• Repair work for incorrect fan mounting, damaged parts, or other issues identified are not included. If additional repairs are needed, contact the contracting officer.

CONTRACTOR RESPONSIBILITY:

• Inspect hub and airfoils for signs of damage.

• Remove airfoils for further inspection if hub material is cast aluminum.

• Check tightness of all mounting hardware with a torque wrench.

• Check breather cap (if applicable).

• Check oil levels (if applicable) and inspect any signs of leakage.

• Check safety cables. If guy wires are present, check tightness.

• Check mounting method.

• Check that the fan is plumb and level.

• Inspect whole fan for signs of corrosion, discoloration, pitting, or flaking of metal.

• Check dimensions of any supplemental steel supports.

• Visually inspect welds.

• Check wiring methods

• Verify raceways are isolated (e.g., line, load, other fans).

• Verify electrical connections on motor and controller are correctly arranged and properly tightened.

• Verify fault history.

• Verify properly sized fuses are installed in controller (if applicable).

• Verify maximum Hz has not been changed in the VFD.

• Inspect for any signs of physical damage to fans or controller.

• Clear debris and dirt from the VFD with air gun.

• Document any additional findings (not including repair work for incorrect fan mounting, damaged parts, or other issues identified).