SOW Battle Creek EHRM Infra - Final _ 10-13-2020.pdf
PDF 247 KB Posted
- Solicitation number
- 36E77621R0003
About this file
This document outlines a federal contract opportunity for architectural and engineering design services. The Department of Veterans Affairs seeks to award a firm-fixed price design contract to support infrastructure upgrades at the Battle Creek VA Medical Center in Battle Creek, Michigan. The scope of work includes electrical, data, HVAC, and physical security upgrades across multiple campus buildings. Interested firms must submit Standard Form 330 statements of qualifications by November 16th to be evaluated based on professional qualifications, specialized experience, capacity, past performance, and geographic location. A minimum of three firms will be invited to submit written responses for further evaluation and selection of the top-ranked firm for negotiations. The anticipated period of performance for design completion is 198 calendar days, with construction period services to be exercised separately. This opportunity is reserved exclusively for service-disabled veteran-owned small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77621R0003_2.docx | DOCX document | |
| Final TQ Tracking Sheet Battle Creek - 11-4-2020.pdf | ||
| PPQ - Battle Creek Tier 1 Infrastructure Design.docx | DOCX document | |
| 36E77621R0003_1.docx | DOCX document | |
| 36E77621R0003.docx | DOCX document | |
| Attachment 2 - OEHRM Site Infrastructure Requirements.pdf | ||
| Attachment 3 - SOCAMES 6 Design Alert 1.pdf | ||
| Attachment 1 - VHA Memorandum 2019-11-13.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Battle Creek VA Medical Center 5500 Armstrong Road October 13, 2020 Battle Creek, MI 49307
Project 515‐21‐701 EHRM Infrastructure Upgrades – Battle Creek, MI ‐ Tier 1
Project Design Scope of Work
1. GENERAL INTENT: The Contractor (herein referred to as “A/E”) shall provide Architect/Engineer (A/E) services to design a construction project at the Battle Creek VA Medical Center (BCVAMC) in accordance with this design scope of work.
2. STATEMENT OF WORK: A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, conduct of studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities electric and IT to allow for the new Electronic Health Record Modernization (EHRM) system. The scope of this project is the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion, renovation and/or relocation of existing space(s) (demo, new construction, finishes), reconfigure/renovate of existing Data Center (remove and replace existing raised floor system, relocate cabinets, cable management), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable, demolish existing obsolete cabling) in buildings (and underground) as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous testing and material abatement. AE shall include provisions to determine which data and fiber cables are obsolete and can be removed under this project. This applies to all TR spaces as well as the Main Server Building. Project Building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 22, 24, 25, 26, 27, 28, 30, 39, 73, 82, 83, 84, 85, 109, 127, 134, 136, 138, 145, 157, 200, 300 and site.
A/E Part Two Services of this design project (also known as Construction Period Services) includes:
a) Responding to construction contractor Requests for Information (RFIs) during the solicitation and construction phases of the construction project.
b) Attendance at pre‐bid conference with the interested contractors, the COR and the Contracting officer and provide clarification if possible, for items brought up during the conference. AE will take minutes and provide this information for the COR and Contracting Office.
c) Attendance at the pre‐award conference with the selected contractor, the COR and the Contracting officer and provide clarification if possible, for items brought up during the conference. AE will take minutes and provide this information for the COR and Contracting Office.
d) Review of construction material submittals, Hazmat. Plan submittals, and shop drawings.
e) Approximately 60 site visits during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications.
f) Attendance during weekly construction progress meetings.
g) Preparation of site visit reports.
h) Coordination with project commissioning requirements and hiring of a 3rd party commissioning agent.
i) Review of any construction project modifications for cost and technical acceptability.
5500 Armstrong Road October 13, 2020
j) AE is expected to accompany the COR and contractor on a final site visit at the completion of the project. AE will develop a punch list of items that have not been completed to specification.
Punch list will be provided to both the COR and the contractor.
k) Preparation of record drawings of the completed construction project based on the construction contractor’s as‐built drawings.
l) The A/E shall prepare a submittal log to be utilized by the VA during construction period services.
m) Maintain RFI log which is to be available upon request or provided with weekly meeting minutes.
n) Provide meeting minutes for weekly construction meetings throughout the duration of construction.
The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of BCVAMC record drawings and the EHRM infrastructure readiness assessment documents are available for A/E use; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design.
The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project.
3. DESIGN WITHIN FUNDING LIMITATIONS: The design shall be prepared by the A/E so as to permit the award of a construction contract, using Federal Acquisition Regulation procedures for the construction of the facilities, at a cost that does not exceed the project’s estimated construction contract price of $21,999,495.
4. DESIGN INDEPENDENCE, FURNITURE AND EQUIPMENT: Designs for construction must produce a “complete and usable” facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design is independent of any future construction project. In addition, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately. Equipment that can be part of the design in the includes those items to meet code requirements for building occupancy, items covered in the VA’s Master Construction Specifications (PG‐18‐1) Divisions 1 through 10, 13 through 26 or 28 through 48, non‐IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00.
The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design’s independence.
5. DESIGN CRITERIA: The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design
5500 Armstrong Road October 13, 2020 criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the following listed Department of Veterans Affairs References, with special emphasis on items in bold:
PG‐18‐1 Master Construction Specifications
PG‐18‐3 Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders]
PG‐18‐4 Standard Details and CAD Standards
PG‐18‐5 Equipment Guide List
H‐18‐8 Seismic Design Handbook
PG‐18‐9 Space Planning Criteria
PG‐18‐10 Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis]
PG‐18‐12 Design Guides (graphical, by function)
PG‐18‐13 Barrier Free Design Guides
PG‐18‐14 Room Finishes, Door, and Hardware Schedules
PG‐18‐15 Minimum Requirements for A/E Submissions
PG‐18‐17 Environmental Compliance Manual
H‐7545 VA Cultural Resource Management Procedures
The following references should also be used to complete the design documents:
VA Standards Alert 017 – Infrastructure Standards for Telecommunications Spaces and all standards, guides, and manuals incorporated by reference (https://www.cfm.va.gov/til/sAlert/sAlert017.pdf)
00 VA OEHRM Site Infrastructure Requirements v1.6 (attached) SOCAMES 6 Design Alert 1 (attached) VHA Directive 1061 Prevention of Healthcare‐Associated Legionella Disease and Scald Injury From
Potable Water Distribution Systems Chalmers P. Wylie VA Ambulatory Care Center Interior/Exterior Finish Schedule
Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide.
6. DESIGN COLLABORATION: The A/E during this design project shall collaborate with the VHA Office of Healthcare Environment and Facilities Programs Special Engineering Program (HEFP/SEP) staff, VISN 10 and the Independent Life Safety Review Agent (LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEPF/SEP and/or VISN deliverables shall be coordinated with the A/E’s design submittals to ensure compliance with all requirements are met. The A/E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review.
5500 Armstrong Road October 13, 2020
7. INDEPENDENT LIFE SAFETY REVIEW: The VA will send the 65% and 95% submissions out for a 3rd party life safety review. The A/E shall incorporate any comments from the 3rd party life safety review into the following submissions.
8. ENVIRONMENTAL PROTECTION: The A/E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the Battle Creek VAMC. If the NEPA assessment results in potential environmental impacts, the A/E shall be responsible for completing any auxiliary documentation required per PG‐18‐17 NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal.
9. PHYSICAL SECURITY: The A/E must include a certified physical security specialist. The specialists must be involved with the design beginning with the concept phase and the qualifications must be submitted to the COR for review and approval prior to the concept/basis of design phase. The specialists shall meet the specific requirements listed in the Physical Security Design Manual for Mission Critical Facilities located on the TIL (http://www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf). The A/E shall ensure that all aspects of the applicable VA Physical Security Design Manual (either Life‐Safety Protected or Mission Critical Facilities) are incorporated into the design and shall prepare a written report acknowledging compliance as required by the Battle Creek VAMC. The A/E must inform the COR of any physical security items that will be difficult to achieve during the concept/basis of design phase of the design and assist the VA with waiver requests as necessary.
10. SUBMITTAL REQUIREMENTS: Design submittals shall follow the requirements of Program Guide, PG‐18‐15, Volume C ‐ A/E Submission Instructions for Minor and NRM Construction Program dated November 2008. This document is available on the TIL at http://www.cfm.va.gov/til/aeDesSubReq.asp.
Submittal documents shall be prominently marked “For Official Use Only (FOUO)” if they contain qualifying data as defined in VHA Memorandum 2019‐11‐13 Sensitive Infrastructure Data Classification – For Official Use Only (FOUO). This memo is attached to this SOW as it is hosted on a non‐public VHA site (https://vaww.va.gov/vhapublications/ViewPublication.asp?pub_ID=8949).
The A/E shall deliver design submittal documents that follow the iterative phase breakdown for design work in PG‐18‐15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG‐18‐15; it is expected for the phase of design that each of the checked items in the SD/DD/CD columns will be completed for the submittal. The A/E shall attend a review meeting following each design submittal as indicated under the Project Schedule section of this Scope of Work. Each new submittal will incorporate all VA comments from the previous submittal.
The following submittals will be required for this project:
Quality Assurance/Quality Control (QA/QC) Plan Basis of Design (BD) ‐ 10% ‐ In addition to the requirements in PG‐18‐15, a Basis of Design is required. Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details, and their ultimate presentation in the final drawings and specifications, will be based on sound
5500 Armstrong Road October 13, 2020 architectural and engineering decisions. Conceptual drawings of the planned design and the initial cost estimate will additionally be included.
Schematic Design (SD)‐ 35% Design Development (DD) – 65% Construction Documents (CD)‐ 95% Final Bid Documents (Bid)
11. DRAWING FORMAT: All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2019 or the latest version available to BCVAMC.
The A/E shall provide a computer 3D model and prepare various 3D renderings to present to VA throughout the design phase to adequately represent architectural, mechanical/electrical/plumbing (MEP), site conditions and other items in the design to aide with facility visualization and contractor coordination.
The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the BCVAMC Master Record Drawing – pending facility expertise). The deliverable model at the SD, DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase.
Architectural/Interior Design Square Footage/Volume Room Names and Numbers Architectural Schedules Architectural Specialties and Woodwork Doors Windows Louvers Roof Floors Ceilings Vertical Circulation Walls/Curtain Wall Sizes, Shapes, & Material Data General Signage Schedules Furniture Equipment Structural Foundations
Shafts and Pits Mechanical
HVAC
Plumbing Electrical/Telecommunications Power and Lighting Steam Distribution Other Engineering Data as Required Exterior Building Information Nurse Call System Asbestos/Hazardous Material Info Security System Information (Access Control, Security
Cameras, Panic Alarms, Overhead Paging) Life Safety Information (Fire Extinguishers, Wall
Ratings, Door Ratings, Fire Protection/Alarms) Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition)
12. SUBMITTAL FORMATS: Submittals shall be submitted in electronic format and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp) and Autodesk Revit Project (.rvt) files are acceptable. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on
5500 Armstrong Road October 13, 2020 the requirements for accessible media can be found at http://www.section508.gov/. The A/E shall be responsible for providing:
Meeting/Conference Minutes Meeting minutes for all formal meetings and conferences held with the VA; including weekly construction meetings, pre‐bid conference, and pre‐award conference. Meeting minutes shall be submitted within three (3) calendar days of the meeting or conference. All documents in any of the electronic formats listed above.
Construction Cost Estimates Construction cost estimates shall comply with Manual for Preparation of Cost Estimates & Related Documents for VA Facilities dated March 8, 2011. This document is available on the TIL at http://www.cfm.va.gov/cost/index.asp. All estimates in any of the electronic formats listed above.
Quality Assurance/Quality Control (QA/QC) Plan All documents in any of the electronic formats listed above.
Basis of Design (BD)
Two (2) half‐size paper bond sets of drawings – 2 to VA Two (2) full‐size paper bond sets of drawings – 2 to VA
Schematic Design (SD)
Two (2) half‐size paper bond sets of drawings – 2 to VA Two (2) full‐size paper bond set2 of drawings – 2 to VA Two (2) paper bond sets of specifications – 2 to VA Space Decision Memo’s signed by the Facility Director for rooms that don’t meet EHRM requirements but are not allowed to be moved.
Two (2) paper bond sets of investigation reports, design calculations, space planning data and cost estimate ‐ 2 to VA
Design Development (DD), and Construction Documents (CD)
All documents in any of the electronic formats listed above.
Memo annotating what was not upgraded and corresponding justifications.
Two (2) full size paper bond sets of drawings ‐ 2 to VA Two (2) half‐size paper bond sets of drawings – 2 to VA Two (2) paper bond sets of specifications – 2 to VA Two (2) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW) and cost estimate ‐ 2 to VA
Final Bid Documents (Bid) PDF files of drawings, specifications, and any miscellaneous design analysis documents such as submittal log and physical security compliance report.
Certified memo annotating what areas/times were not upgraded and the corresponding justifications.
5500 Armstrong Road October 13, 2020
Certified memo that the A/E design is independent of future projects and includes all equipment required for the project to be activated/full functional.
Word files of specifications.
Revit and AutoCAD files of drawings.
Three (3) full size paper bond sets of drawings ‐ 3 to VA (Two sets provided with BD submission and final set provided upon request) Three (3) half‐size paper bond sets of drawings – 3 to VA (Two sets provided with BD submission and final set provided upon request) Three (3) paper bond sets of specifications – 3 to VA (Two sets provided with BD submission and final set provided upon request) Two (2) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction SOW and cost estimate ‐ 2 to VA (One set provided with BD submission and final set provided upon request)
Requests For Information (RFI) Requests For Information shall be submitted within three (3) calendar days of submittal to the A/E.
Submittal Reviews Submittal reviews shall be submitted within seven (7) calendar days of submittal to the A/E.
Site Visit Reports Site visit reports shall be submitted within seven (7) calendar days of the visit. All documents in any of the electronic formats listed above.
Modification Requests Modification requests shall be submitted within seven (7) calendar days of submittal to the A/E. All documents in any of the electronic formats listed above. Note ‐ If major modification, VA will provide additional time and document format guidance.
Punch List Punch list shall be submitted within seven (7) calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above.
Record Drawings Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. Autodesk Revit Project (.rvt) format and AutoCAD (.dwg) format.
13. PROJECT SCHEDULE/PERIOD OF PERFORMANCE: The A/E shall perform Part One Services/Design Phase work according to the schedule shown below. (In the event that a due date falls on a weekend or a Holiday the submission date will be moved forward to the next business day)
PCAC Award/Admin. time 14 calendar days
QA/QC Submittal 7 calendar days after receipt of Notice of Award
BD Submittal 30 calendar days after receipt of Notice of Award
QA/QC and BD Review Meeting 1 calendar days after VA receipt of QA/QC & BD Submittals
SD Submittal 30 calendar days after VA acceptance of BD Submittal
5500 Armstrong Road October 13, 2020
SD Review Meeting 1 calendar days after VA receipt of SD Submittal
DD Submittal 60 calendar days after VA acceptance of SD Submittal
DD Review Meeting 1 calendar days after VA receipt of DD Submittal
CD Submittal 45 calendar days after VA acceptance of DD Submittal
CD Review Meeting 1 calendar days after VA receipt of CD Submittal
Final Bid Documents Submittal 15 calendar days after VA acceptance of CD Submittal
Total Part One Services/Design Phase Schedule
198 calendar days
Part Two Services/Construction Period Services shall be performed for the length of time between the option for Construction Period Services is exercised and acceptance of Construction Completion.
14. CONTRACT OVERSIGHT: All contracts for this project (shall be awarded by the Program Contracting Activity Central (PCAC) office); only a warranted VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders and changes to the statement of work.
The Program Contracting Activity Central’s (PCAC) CO shall designate a Contracting Officer’s Representative (COR) to monitor and manage the A/E’s performance under the design project contract.
The COR shall be a representative of the BCVAMC Engineering Service Project Section and have the technical knowledge required to monitor and oversee the project.
A COR from the BCVAMC Engineering Service Project Section shall also be designated for the construction project contract to monitor and manage the construction contractor’s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of “Owner’s Representative” and does not supersede or eliminate the A/E’s responsibility for Part Two Services/Construction Period Services. The A/E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase.
15. SOW ATTACHMENTS: The following list of documents are attached to this SOW for A/E use and incorporation into the project documents:
VHA Memorandum 2019‐11‐13 Sensitive Infrastructure Data Classification – For Official Use
Only (FOUO) 00 VA OEHRM Site Infrastructure Requirements v1.6 SOCAMES 6 Design Alert 1