SOW ATTACHMENT_Drawings_ DRFT.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26127Q0047
About this file
This document set consists of architectural drawings for flooring replacement projects at multiple Veterans Affairs facilities located in McClellan Park, California. The project involves replacing flooring in Buildings 88, 98, and 209, with work addressing parking lots, basement levels, and multiple floors within medical office buildings.
For Building 98 (VA Medical Center), the scope includes flooring replacement across three levels with existing carpet, vinyl composite tile (VCT), and stair treads to be replaced with new carpet (CPT), luxury vinyl tile (LVT), and resilient stair treads (RST). Exam rooms throughout require installation of RB-2 rubber base, while default wall bases use RB-1 rubber base specifications. Level 1 covers approximately 326 square feet of corridor space with multiple exam rooms, offices, and clinical spaces. Level 2 flooring extends across waiting areas, exam rooms, provider offices, and administrative spaces. The basement level contains mechanical systems and limited flooring work. Building 209 includes basement, Level 1, and Level 2 flooring work across office spaces, conference rooms, and support facilities. Building 949 requires flooring replacement across three levels including executive offices, conference rooms, breakrooms, and administrative spaces. The project specification notes indicate all existing wall bases where flooring is replaced shall be new rubber base with differentiated specifications by room type. Issue date for the majority of drawings is April 28, 2026, with one Building 209 drawing dated June 22, 2026. All drawings are marked as DRAFT and FOR REFERENCE ONLY with full sprinkler system coverage noted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26127Q0047.docx | DOCX document | |
| LVT-1_LUXURY VINYL TILE.pdf | ||
| SOW ATTACHMENT_Specifications DRFT.pdf | ||
| LVT-2_LUXURY VINYL TILE.pdf | ||
| SOW Replace Flooring in McCellan_ DRFT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-013
VA100
COVER SHEET RE-SLURRY AND RE-STRIPE
BLDG. 88 AND 98 PARKING LOTS
04.28.2026
5342 Dudley Boulevard McClellan Park, CA 95652
Revisions: Date:
ARNOLD AVE
DUDLEY BLVD
Feet 1:1000
2001000 50
PALM ST
PEACEKEEPER W
AY
WATT AVE
O'MALLEY AVE
ARNOLD AVE
DRAFT
UP
MECHANICAL
ROOM
200 SF
STAIRS
1H27
EXTENT OF BUILDING ABOVE
LO
A
D
IN
G
MECHANICAL B
1/8" = 1'-0"1 Basement
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA101
ARCHITECTURAL PLAN -
BASEMENT (N.I.C.)
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
5342 Dudley Boulevard McClellan Park, CA 95652
Revisions: Date:
FEETSCALE
201510505 1/8" = 1'-0"
N
BASEMENT LEVEL IS NOT INCLUDED IN CONTRACT AND THE FLOOR PLAN IS ONLY PROVIDED FOR REFERENCE
UP
EXAM ROOM
1C81
EXAM ROOM
1C79
CONSULT
ROOM
1C75
CONSULT
ROOM
1C73U-TOILET
1C65A
PRINTING
1C67
CORRIDOR
1C82A
DECON
1D07
SOILED UTILITY
1D09
U-TOILET
1E11A
OFFICE
1B01A
EXAM ROOM
1B06
OFFICE
1B22
CONSULT
ROOM
1B08
EXAM ROOM
1B18
VITALS
1B16
EXAM ROOM
1C18
OFFICE
1C22
EXAM ROOM
1C24
OFFICE
1C28
EXAM ROOM
1C26
EXAM ROOM
1C12
EXAM ROOM
1C06
EXAM ROOM
1C04
CORRIDOR
1C82B
EXAM ROOM
1D21
CONSULT
ROOM
1D19
BREAKROOM
1E07
DRESSING
1E15B
HOLDING
1E15C
U-TOILET
1E15A
ULTRASOUND
1E19
W-TOILET
1A28
M-TOILET
1A26
OFFICE
1F02
OFFICE
1F05
OFFICE
1F03
CORRIDOR
1A30
STORAGE
1K17
M-TOILET
1A08
CONSULT
ROOM
1K06
CONSULT
ROOM
1K04
CORRIDOR
1F10
U-TOILET
1A16
ELECTRICAL
1H28
U-TOILET
1A18
HAC
1F01A
OFFICE
1F14
OFFICE
1F12
105 SF
EXAM ROOM
1H22
CORRIDOR
1B10
EXAM ROOM
1C32
EXAM ROOM
1C34
EXAM ROOM
1C36
EXAM ROOM
1C38
EXAM ROOM
1C42
EXAM ROOM
1B12
COPY ROOM
1B02
ELECTRICAL
1C25
U-TOILET
1C23A
STORAGE
1C91
OFFICE
1K02
CORRIDOR
1K00
OFFICE
1K08
OFFICE
1J14
OFFICE
1J12
HAC
1J06
STORAGE
1J08
OFFICE
1B05
VITALS
1B03
CONSULT
ROOM
1K01
OFFICE
1K05
CONSULT
ROOM
1K12
CORRIDOR
1J00A
BLOOD DRAW
1J32
ISOLATION
1D05
IT
1C85
U-TOILET
1C83
EXAM ROOM
1C58
EXAM ROOM
1C62
EXAM ROOM
1C56
EXAM ROOM
1C54
CONSULT
ROOM
1C66
EXAM ROOM
1C64
CONSULT
ROOM
1C72
CONSULT
ROOM
1C68
EXAM ROOM
1C52
EXAM ROOM
1C48
CONSULT
ROOM
1C74
EXAM ROOM
1C46
CONSULT
ROOM
1C61
CONSULT
ROOM
1C27
EXAM ROOM
1B15
OFFICE
1B07
PROCEDURE
ROOM
1B09
OFFICE
1C65
IT
1B02A
LACTATION
1B04
W-TOILET
1B34
CORRIDOR
1E00
ELECTRICAL
1E09
MAMMO
1D17
CONSULT
1D13
STORAGE
1E13
OFFICE
1D10A
OFFICE
1D00E
RECEPTION
1C93A
EXAM ROOM
1C16
EXAM ROOM
1C44
OFFICE
1G09
STORAGE
1G07
MAINTENANCE
OFFICE
1F30
CYLINDER
STOARAGE
1F28B
CORRIDOR
1F00
VESTIBULE
1A00
LOADING DOCK
W-TOILET
1A06
OFFICE
1K05A
EXAM ROOM
1C14
EXAM ROOM
1C08
TRIAGE
1C02
STAIR
#2
HAC
1G01
OFFICE
1F20A
PHARMACY
1G00
VAULT
1F26
FLAMMABLE
STORAGE
1F28A
EXAM ROOM
1B17
EXAM ROOM
1B19
OFFICE
1C63
EXAM ROOM
1Z04
EXAM ROOM
1H10
RECORDS
1E03
CORRIDOR
1C10
VESTIBULE
1D00A
SHOWER
1D11
CORRIDOR
1A32
CORRIDOR
1B10A
LAB
1J02
O&IT
1A20B
RECEIVING
1F20
PRINTING
1K14
CORRIDOR
1A10
CORRIDOR
1A04
RECEPTION
1B14
W-TOILET
1B11
RECORDS
1H20
ELEVATOR
CONTROL
ROOM
1A20A
OFFICE
1D01B
OFFICE
1C21
EXAM ROOM
1B24
CORRIDOR
1C30A
CORRIDOR
1C60
CORRIDOR
1C30
CORRIDOR
1D10
SUPPLY ROOM
1C23
WAITING
1B32
CORRIDOR
1E00A
CONTROL
ROOM
1E16
XRAY
1E15
XRAY
1E11
CORRIDOR
1J00
RECEPTION
1J04
CONSULT
ROOM
1C69
CONSULT
ROOM
1C71
CORRIDOR
1C82
STAIR #3
CORRIDOR
1H00
HAC
1B01B
CORRIDOR
1B00
STORAGE
1F01
ELECTRICAL
1C87
CENTRAL
WAITING AREA
1A12
OI&T
1Z09
DRESSING
1E12
STORAGE
1C67A
TOILET
1J103
GYM
1H20
TREATMENT
ROOM
1Z07
CORRIDOR
1K00A
STORAGE
1Z10
EXAM ROOM
1H22
STORAGE
1Z02
OFFICE
1H23
RECEPTION
1E01
SOILED LINEN
1C89
OFFICE
1D01A
PROCEDURE
1D03
VAULT
1G05
CORRIDOR
1A24
OFFICE
1F04
CONSULT
ROOM
1K08/27A
CONSULT
ROOM
1K08/28
CONSULT
ROOM
1K08/27B
CONSULT
ROOM
1K08/27C
STORAGE
1G07B
OFFICE
1F11
OFFICE
1F13
VAULT
1G00A
OFFICE
1D03A
BREAK ROOM
1D01
CONSULT
ROOM
1C69A
CLEAN LINEN
1Z06
OFFICE
1K14A
OFFICE
1Z12
OFFICE
1Z11
CLOSET
1Z08
STORAGEB
R
EA
K
R O
O M
MED SUPPLY
1C21A
ELEVATOR
1A20
CORRIDOR
1A11
U P
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA102A
ARCHITECTURAL PLAN -
EXISTING LEVEL 1 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
5342 Dudley Boulevard Street McClellan Park, CA 95652
Revisions: Date:
1/8" = 1'-0"1 Floor 2
FEETSCALE
201510505 1/8" = 1'-0"
N
EXISTING CARPET
EXISTING VCT
EXISTING STAIR TREAD
UP
EXAM ROOM
1C81
EXAM ROOM
1C79
CONSULT
ROOM
1C75
CONSULT
ROOM
1C73U-TOILET
1C65A
PRINTING
1C67
CORRIDOR
1C82A
DECON
1D07
SOILED UTILITY
1D09
U-TOILET
1E11A
OFFICE
1B01A
EXAM ROOM
1B06
OFFICE
1B22
CONSULT
ROOM
1B08
EXAM ROOM
1B18
VITALS
1B16
EXAM ROOM
1C18
OFFICE
1C22
EXAM ROOM
1C24
OFFICE
1C28
EXAM ROOM
1C26
EXAM ROOM
1C12
EXAM ROOM
1C06
EXAM ROOM
1C04
CORRIDOR
1C82B
EXAM ROOM
1D21
CONSULT
ROOM
1D19
BREAKROOM
1E07
DRESSING
1E15B
HOLDING
1E15C
U-TOILET
1E15A
ULTRASOUND
1E19
W-TOILET
1A28
M-TOILET
1A26
OFFICE
1F02
OFFICE
1F05
OFFICE
1F03
CORRIDOR
1A30
STORAGE
1K17
M-TOILET
1A08
CONSULT
ROOM
1K06
CONSULT
ROOM
1K04
CORRIDOR
1F10
U-TOILET
1A16
ELECTRICAL
1H28
U-TOILET
1A18
HAC
1F01A
OFFICE
1F14
OFFICE
1F12
105 SF
EXAM ROOM
1H22
CORRIDOR
1B10
EXAM ROOM
1C32
EXAM ROOM
1C34
EXAM ROOM
1C36
EXAM ROOM
1C38
EXAM ROOM
1C42
EXAM ROOM
1B12
COPY ROOM
1B02
ELECTRICAL
1C25
U-TOILET
1C23A
STORAGE
1C91
OFFICE
1K02
CORRIDOR
1K00
OFFICE
1K08
OFFICE
1J14
OFFICE
1J12
HAC
1J06
STORAGE
1J08
OFFICE
1B05
VITALS
1B03
CONSULT
ROOM
1K01
OFFICE
1K05
CONSULT
ROOM
1K12
CORRIDOR
1J00A
BLOOD DRAW
1J32
ISOLATION
1D05
IT
1C85
U-TOILET
1C83
EXAM ROOM
1C58
EXAM ROOM
1C62
EXAM ROOM
1C56
EXAM ROOM
1C54
CONSULT
ROOM
1C66
EXAM ROOM
1C64
CONSULT
ROOM
1C72
CONSULT
ROOM
1C68
EXAM ROOM
1C52
EXAM ROOM
1C48
CONSULT
ROOM
1C74
EXAM ROOM
1C46
CONSULT
ROOM
1C61
CONSULT
ROOM
1C27
EXAM ROOM
1B15
OFFICE
1B07
PROCEDURE
ROOM
1B09
OFFICE
1C65
IT
1B02A
LACTATION
1B04
W-TOILET
1B34
CORRIDOR
1E00
ELECTRICAL
1E09
MAMMO
1D17
CONSULT
1D13
STORAGE
1E13
OFFICE
1D10A
OFFICE
1D00E
RECEPTION
1C93A
EXAM ROOM
1C16
EXAM ROOM
1C44
OFFICE
1G09
STORAGE
1G07
MAINTENANCE
OFFICE
1F30
CYLINDER
STOARAGE
1F28B
CORRIDOR
1F00
VESTIBULE
1A00
LOADING DOCK
W-TOILET
1A06
OFFICE
1K05A
EXAM ROOM
1C14
EXAM ROOM
1C08
TRIAGE
1C02
STAIR
#2
HAC
1G01
OFFICE
1F20A
PHARMACY
1G00
VAULT
1F26
FLAMMABLE
STORAGE
1F28A
EXAM ROOM
1B17
EXAM ROOM
1B19
OFFICE
1C63
EXAM ROOM
1Z04
EXAM ROOM
1H10
RECORDS
1E03
326 SF
CORRIDOR
1C10
VESTIBULE
1D00A
SHOWER
1D11
CORRIDOR
1A32
CORRIDOR
1B10A
LAB
1J02
O&IT
1A20B
RECEIVING
1F20
PRINTING
1K14
CORRIDOR
1A10
CORRIDOR
1A04
RECEPTION
1B14
W-TOILET
1B11
RECORDS
1H20
ELEVATOR
CONTROL
ROOM
1A20A
OFFICE
1D01B
OFFICE
1C21
EXAM ROOM
1B24
CORRIDOR
1C30A
CORRIDOR
1C60
CORRIDOR
1C30
CORRIDOR
1D10
SUPPLY ROOM
1C23
WAITING
1B32
CORRIDOR
1E00A
CONTROL
ROOM
1E16
XRAY
1E15
XRAY
1E11
CORRIDOR
1J00
RECEPTION
1J04
CONSULT
ROOM
1C69
CONSULT
ROOM
1C71
CORRIDOR
1C82
STAIR #3
CORRIDOR
1H00
HAC
1B01B
CORRIDOR
1B00
STORAGE
1F01
ELECTRICAL
1C87
CENTRAL
WAITING AREA
1A12
OI&T
1Z09
DRESSING
1E12
STORAGE
1C67A
TOILET
1J103
GYM
1H20
TREATMENT
ROOM
1Z07
CORRIDOR
1K00A
STORAGE
1Z10
EXAM ROOM
1H22
STORAGE
1Z02
OFFICE
1H23
RECEPTION
1E01
SOILED LINEN
1C89
OFFICE
1D01A
PROCEDURE
1D03
VAULT
1G05
CORRIDOR
1A24
OFFICE
1F04
CONSULT
ROOM
1K08/27A
CONSULT
ROOM
1K08/28
CONSULT
ROOM
1K08/27B
CONSULT
ROOM
1K08/27C
STORAGE
1G07B
OFFICE
1F11
OFFICE
1F13
VAULT
1G00A
OFFICE
1D03A
BREAK ROOM
1D01
CONSULT
ROOM
1C69A
CLEAN LINEN
1Z06
OFFICE
1K14A
OFFICE
1Z12
OFFICE
1Z11
CLOSET
1Z08
STORAGEB
R
EA
K
R O
O M
MED SUPPLY
1C21A
ELEVATOR
1A20
CORRIDOR
1A11
U P
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA102B
ARCHITECTURAL PLAN -
NEW LEVEL 1 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
5342 Dudley Boulevard Street McClellan Park, CA 95652
Revisions: Date:
1/8" = 1'-0"1 Floor 2
FEETSCALE
201510505 1/8" = 1'-0"
N
NOTE:
ALL EXISTING WALL BASES WHERE FLOORING
IS REPLACED SHALL BE NEW RUBBER BASE:
· DEFAULT WALL BASE SHALL BE RB-1
· EXAM ROOMS SHALL BE RB-2
INSTALL NEW CARPET
INSTALL NEW LUXURY VINYL TILE (LVT)
INSTALL NEW RESILIENT STAIR TREAD (RST)
INSTALL NEW CARPET (CPT)
DN
DN
EXAM ROOM
2U13
EXAM ROOM
2U15
STORAGE
2U17
OFFICE
2U19
SOUND
BOOTHS
2L05A
OFFICE
2L03A
OFFICE
2L03B
AUDIOLOGY
2L03
HAC
2U11
U-TOILET
2U07
EXAM ROOM
2U05
OFFICE
2U03C
EXAM ROOM
2U03B
EXAM ROOM
2U03A
WAITING
2U01
OFFICE
2U03
BREAK ROOM
2T40
OFFICE
2T40A
OFFICE
2T40B
CORRIDOR
2L00A
WAITING
2L00
RECEPTION
2L02
TEST ROOM
2M13
EXAM ROOM
2M09
CORRIDOR
2M05
U-TOILET
2M07
EXAM ROOM
2M25
OFFICE
2M27
OFFICE
2M29
EXAM ROOM
2M31
PROVIDER
OFFICE
2M35
OFFICE
2M37
TREATMENT
2M39
EXAM ROOM
2M41
EXAM ROOM
2L07
OFFICE
2M15
OFFICE
2M17
OFFICE
2M19
OFFICE
2M21
HAC
2M23
EXAM ROOM
2M12
EXAM ROOM
2M14
EXAM ROOM
2M16
EXAM ROOM
2M18
OFFICE
2M22
OFFICE
2M24
EXAM ROOM
2M26
EXAM ROOM
2M28
EXAM ROOM
2M32
EXAM ROOM
2M34
IT
2M20A
ELECTRICAL
2M20B
OFFICE
2M08
OFFICE
2M06
COPY
2M04
OFFICE
2M02
EXAM ROOM
2N09
EXAM ROOM
2N07
ELEC.
2N05
U-TOILET
2N117
PROVIDER
OFFICE
2N13
BREAK ROOM
2N15
ELECTRICAL
COMMS
2M43OFFICE
2N45
OMNICELL
2M47
PROVIDER
OFFICE
2P19
OFFICE
2P21
EXAM ROOM
2P23
EXAM ROOM
2P25 EXAM ROOM
2P27
TREATMENT
2P29
OFFICE
2N00A
CHECK-IN
2P01
OFFICE
2P35
EXAM ROOM
2Q03A
STORAGE
2Q03
EXAM ROOM
2Q05
EXAM ROOM
2Q07
EXAM ROOM
2P31
U-TOILET
2P33
CONFERENCE
2A28
EQUIPMENT
2Q01
MECHANICAL
2A03AM-TOILET
2A16
W-TOILET
2A18
OFFICE
2A22
OFFICE
2R01
OFFICE
2R01A
CONSULT
ROOM
2S05
OFFICE
2S01
STORAGE
2S03
OFFICE
2A10A
OFFICE
2A10
OFFICE
2A08
OFFICE
2T17
OFFICE
2T15
OFFICE
2T21
HAC
2T19
OFFICE
2T27
EXAM ROOM
2T25
CONFERENCE
2T23
CONFERENCE
2T23A
OFFICE
2T11
OFFICE
2T13
IT
2T09A
IT
2T09B
MECHANICAL
2T09
OFFICE
2T07A
OFFICE
2T03
OFFICE
2T01
OI&T
2S13A
OFFICE
2T07 OFFICE
2T05
OFFICE
2S13
STORAGE
2S09B
GROUP ROOM
2S09
OFFICE
2S09A
OFFICE
2S07 OFFICE
2R07
STORAGE
2R05
CORRIDOR
2U00
VESTIBULE
2T30A
CORRIDOR
2T30
CORRIDOR
2L00B
CORRIDOR
2M11A
CORRIDOR
2M20
CORRIDOR
2M10
CORRIDOR
2M30
CORRIDOR
2M48
CORRIDOR
2N18
CORRIDOR
2N10
CORRIDOR
2P20
CORRIDOR
2P20A
CORRIDOR
2Q10
CORRIDOR
2Q00A
CORRIDOR
2A30
CORRIDOR
2A32
CORRIDOR
2R02
CORRIDOR
2T10
CORRIDOR
2T20
CORRIDOR
2T00B
OPEN TO BELOW OPEN TO BELOW
MEDICAL
RECORDS
2M03
CORRIDOR
2A12
CORRIDOR
2T00
CORRIDOR
2S04
CORRIDOR
2R10
STAIR #3
EXAM ROOM
2M11
PROVIDER
OFFICE
2N03A
ELEVATOR
1H25
BREAK
ROOM
TOILET
2T03A
CLOSET
2T03B
WAITING
2M00
RECEPTION
2M01
WAITING
2Q00
EXAM ROOM
2N03B
EXAM ROOM
2N03C
RECEPTION
2N03
SOUND BOOTH
2L05B
CORRIDOR
2L05
SOUND
BOOTH
2M05A
SOUND
BOOTH
2M05B
SOUND BOOTH
II
2L03C
SOUND BOOTH
I
2L03D
ROOF ACCESS ROOF ACCESS
#1 STAIR
LANDING
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA103A
ARCHITECTURAL PLAN -
EXISTING LEVEL 2 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
5342 Dudley Boulevard Street McClellan Park, CA 95652
Revisions: Date:
1/8" = 1'-0"1 Floor 2
FEETSCALE
201510505 1/8" = 1'-0"
EXISTING CARPET
EXISTING VCT
DN
EXAM ROOM
2U13
EXAM ROOM
2U15
STORAGE
2U17
OFFICE
2U19
SOUND
BOOTHS
2L05A
OFFICE
2L03A
OFFICE
2L03B
AUDIOLOGY
2L03
HAC
2U11
U-TOILET
2U07
EXAM ROOM
2U05
OFFICE
2U03C
EXAM ROOM
2U03B
EXAM ROOM
2U03A
WAITING
2U01
OFFICE
2U03
BREAK ROOM
2T40
OFFICE
2T40A
OFFICE
2T40B
CORRIDOR
2L00A
WAITING
2L00
RECEPTION
2L02
TEST ROOM
2M13
EXAM ROOM
2M09
CORRIDOR
2M05
U-TOILET
2M07
EXAM ROOM
2M25
OFFICE
2M27
OFFICE
2M29
EXAM ROOM
2M31
PROVIDER
OFFICE
2M35
OFFICE
2M37
TREATMENT
2M39
EXAM ROOM
2M41
EXAM ROOM
2L07
OFFICE
2M15
OFFICE
2M17
OFFICE
2M19
OFFICE
2M21
HAC
2M23
EXAM ROOM
2M12
EXAM ROOM
2M14
EXAM ROOM
2M16
EXAM ROOM
2M18
OFFICE
2M22
OFFICE
2M24
EXAM ROOM
2M26
EXAM ROOM
2M28
EXAM ROOM
2M32
EXAM ROOM
2M34
IT
2M20A
ELECTRICAL
2M20B
OFFICE
2M08
OFFICE
2M06
COPY
2M04
OFFICE
2M02
EXAM ROOM
2N09
EXAM ROOM
2N07
ELEC.
2N05
U-TOILET
2N117
PROVIDER
OFFICE
2N13
BREAK ROOM
2N15
ELECTRICAL
COMMS
2M43OFFICE
2N45
OMNICELL
2M47
PROVIDER
OFFICE
2P19
OFFICE
2P21
EXAM ROOM
2P23
EXAM ROOM
2P25 EXAM ROOM
2P27
TREATMENT
2P29
OFFICE
2N00A
CHECK-IN
2P01
OFFICE
2P35
EXAM ROOM
2Q03A
STORAGE
2Q03
EXAM ROOM
2Q05
EXAM ROOM
2Q07
EXAM ROOM
2P31
U-TOILET
2P33
CONFERENCE
2A28
EQUIPMENT
2Q01
MECHANICAL
2A03AM-TOILET
2A16
W-TOILET
2A18
OFFICE
2A22
OFFICE
2R01
OFFICE
2R01A
CONSULT
ROOM
2S05
OFFICE
2S01
STORAGE
2S03
OFFICE
2A10A
OFFICE
2A10
OFFICE
2A08
OFFICE
2T17
OFFICE
2T15
OFFICE
2T21
HAC
2T19
OFFICE
2T27
EXAM ROOM
2T25
CONFERENCE
2T23
CONFERENCE
2T23A
OFFICE
2T11
OFFICE
2T13
IT
2T09A
IT
2T09B
MECHANICAL
2T09
OFFICE
2T07A
OFFICE
2T03
OFFICE
2T01
OI&T
2S13A
OFFICE
2T07 OFFICE
2T05
OFFICE
2S13
STORAGE
2S09B
GROUP ROOM
2S09
OFFICE
2S09A
OFFICE
2S07 OFFICE
2R07
STORAGE
2R05
CORRIDOR
2U00
VESTIBULE
2T30A
CORRIDOR
2T30
CORRIDOR
2L00B
CORRIDOR
2M11A
CORRIDOR
2M20
CORRIDOR
2M10
CORRIDOR
2M30
CORRIDOR
2M48
CORRIDOR
2N18
CORRIDOR
2N10
CORRIDOR
2P20
CORRIDOR
2P20A
CORRIDOR
2Q10
CORRIDOR
2Q00A
CORRIDOR
2A30
CORRIDOR
2A32
CORRIDOR
2R02
CORRIDOR
2T10
CORRIDOR
2T20
CORRIDOR
2T00B
OPEN TO
BELOW
OPEN TO
BELOW
MEDICAL
RECORDS
2M03
CORRIDOR
2A12
CORRIDOR
2T00
CORRIDOR
2S04
CORRIDOR
2R10
STAIR #3 LANDING
EXAM ROOM
2M11
PROVIDER
OFFICE
2N03A
ELEVATOR
1H25
BREAK
ROOM
TOILET
2T03A
CLOSET
2T03B
WAITING
2M00
RECEPTION
2M01
WAITING
2Q00
EXAM ROOM
2N03B
EXAM ROOM
2N03C
RECEPTION
2N03
SOUND BOOTH
2L05B
CORRIDOR
2L05
SOUND
BOOTH
2M05A
SOUND
BOOTH
2M05B
SOUND BOOTH
II
2L03C
SOUND BOOTH
I
2L03D
ROOF
ACCESS
ROOF
ACCESS
#1 STAIR
LANDING
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA103B
ARCHITECTURAL PLAN -
NEW LEVEL 2 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
5342 Dudley Boulevard Street McClellan Park, CA 95652
Revisions: Date:
1/8" = 1'-0"1 Floor 2
FEETSCALE
201510505 1/8" = 1'-0"
INSTALL NEW CARPET (CPT)
INSTALL NEW LUXURY VINYL TILE (LVT)
INSTALL NEW RESILIENT STAIR TREAD (RST)
NOTE:
ALL EXISTING WALL BASES WHERE FLOORING
IS REPLACED SHALL BE NEW RUBBER BASE:
· DEFAULT WALL BASE SHALL BE RB-1
· EXAM ROOMS SHALL BE RB-2
UP UP
VACANT SPACE
PRINTING
LOADING DOCK
STORAGE
IT
OFFICE
OFFICE
OFFICE
STORAGE
22B
STORAGE
22A
CORRIDOR
23A
CONFERENCE
ROOM
STORAGE
8A
STORAGE
CORRIDOR
C1
OFFICE
OFFICE
5A
CORRIDOR
C2
PUMP ROOM
CORRIDOR
C3
ELECTRICAL
7A
ELEVATOR
CORRIDOR
C4
MECHANICAL
MECHANICAL
CORRIDOR
STAIR #2
SERVICE ELEVATOR
OFFICE
OFFICE
OPEN OFFICE
BREAKROOM
LACTATION
29B
VESTIBULE
29A
WOMENS
DUNGEON
7B
MENSHAC
CHASE
2 2 4 6 8 10 12 14 3/16" = 1'-0"
FEETSCALE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA104A
ARCHITECTURAL PLAN -
EXISTING BASEMENT FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.27.2026
3230 Peacekeeper Way McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Basement
EXISTING CARPET
EXISTING VCT
EXISTING STAIR TREAD
DRAFT
http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com
UP UP
VACANT SPACE
PRINTING
LOADING DOCK
STORAGE
IT
OFFICE
OFFICE
OFFICE
STORAGE
22B
STORAGE
22A
CORRIDOR
23A
CONFERENCE
ROOM
STORAGE
8A
STORAGE
CORRIDOR
C1
OFFICE
OFFICE
5A
CORRIDOR
C2
PUMP ROOM
CORRIDOR
C3
ELECTRICAL
7A
ELEVATOR
CORRIDOR
C4
MECHANICAL
MECHANICAL
CORRIDOR
STAIR #2
SERVICE ELEVATOR
OFFICE
OFFICE
OPEN OFFICE
BREAKROOM
LACTATION
29B
VESTIBULE
29A
WOMENS
DUNGEON
7B
MENSHAC
CHASE
3/16" = 1'-0"1 Basement 2 2 4 6 8 10 12 14
3/16" = 1'-0"
FEETSCALE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA104B
ARCHITECTURAL PLAN -
NEW BASEMENT FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.27.2026
3230 Peacekeeper Way McClellan Park, CA 95652
Revisions: Date:
NOTE:
ALL EXISTING WALL BASES WHERE FLOORING
IS REPLACED SHALL BE NEW RUBBER BASE:
· DEFAULT WALL BASE SHALL BE RB-1
· EXAM ROOMS SHALL BE RB-2
INSTALL NEW CARPETINSTALL NEW CARPET (CPT)
INSTALL NEW LUXURY VINYL TILE (LVT)
INSTALL NEW RESILIENT STAIR TREAD (RST)
DRAFT
http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com
UP
DN
UP
UPUP
DN
DN
ENTRY
STAIR #1
LOBBY
CORRIDOR
103A
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
111A
IT
OFFICE
MANAGEMENT
114A
MANAGEMENT
114B
102 SF
OFFICE
114C
OFFICE
114D
OFFICE
114E
OFFICE
114F
MANAGEMENT
OFFICE
115 M-TOILET
W-TOILET
CORRIDOR
IT
HAC
BREAKROOM
OFFICE
126A
OFFICE
126B
OFFICE
126C
OFFICE
126D
OFFICE
126E
OFFICE
CONFERENCE
ROOM
CONFERENCE
ROOM
ELEVATOR
STAIR #2
OPEN OFFICE
SPACE
COPY
OFFICE
113A
MECHANICAL
2 2 4 6 8 10 12 14 3/16" = 1'-0"
FEETSCALE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
BI
M
VA
N C
H C
S/
9_ M cC le lla n.
rv t
/0
2/
1:
:0
VA105A
ARCHITECTURAL PLAN -
EXISTING LEVEL 1 FLOORING 209
3230 Peacekeeper Way McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Floor 1
FOR REFERENCE ONLY REPLACE FLOORING IN
MCCLELLAN
06.22.2026
EXISTING CARPET
EXISTING VCT
DN
UP
UPUP
DN
UP
ENTRY
STAIR #1
LOBBY
CORRIDOR
103A
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
111A
IT
OFFICE
MANAGEMENT
114A
MANAGEMENT
114B
OFFICE
114C
OFFICE
114D
OFFICE
114E
OFFICE
114F
MANAGEMENT
OFFICE
258 SF
M-TOILET
284 SF
W-TOILET
CORRIDOR
IT
HAC
BREAKROOM
OFFICE
126A
OFFICE
126B
OFFICE
126C
OFFICE
126D
OFFICE
126E
OFFICE
CONFERENCE
ROOM
CONFERENCE
ROOM
ELEVATOR
STAIR #2
OPEN OFFICE
SPACE
COPY
OFFICE
113A
MECHANICAL
M-TOILET
W-TOILET
3/16" = 1'-0"1 Floor 1 2 2 4 6 8 10 12 14
3/16" = 1'-0"
FEETSCALE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
BI
M
VA
N C
H C
S/
9_ M cC le lla n.
rv t
/0
2/
1:
:0
VA105B
ARCHITECTURAL PLAN -
NEW LEVEL 1 FLOORING 209
3230 Peacekeeper Way McClellan Park, CA 95652
Revisions: Date:
FOR REFERENCE ONLY REPLACE FLOORING IN
MCCLELLAN
06.22.2026
INSTALL NEW CARPETINSTALL NEW CARPET (CPT)
INSTALL NEW LUXURY VINYL TILE (LVT)
INSTALL NEW RESILIENT STAIR TREAD (RST)
NOTE:
ALL EXISTING WALL BASES WHERE FLOORING
IS REPLACED SHALL BE NEW RUBBER BASE:
· DEFAULT WALL BASE SHALL BE RB-1
· EXAM ROOMS SHALL BE RB-2
DN
DN
DN
VESTIBULE
LANDING
201A
LOBBY
OFFICE
OFFICE
OFFICE
OFFICE
EQUIPEMENT
ROOM
CONFERENCE
ROOM
CORRIDOR
TOILET
LACTATION
ROOM
STORAGE
IT
TOILET
VESTIBULE
HAC
STAIR #2
OFFICE
OFFICE
CONFERENCE
ELEVATOR
BREAKROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
2 2 4 6 8 10 12 14 3/16" = 1'-0"
FEETSCALE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
BI
M
VA
N C
H C
S/
9_ M cC le lla n.
rv t
/0
2/
1:
:0
VA106A
ARCHITECTURAL PLAN -
EXISTING LEVEL 2 FLOORING 209
3230 Peacekeeper Way McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Floor 2
FOR REFERENCE ONLY REPLACE FLOORING IN
MCCLELLAN
06.22.2026
EXISTING CARPET
EXISTING VCT
DN
DN
DN
VESTIBULE
LANDING
201A
LOBBY
OFFICE
OFFICE
OFFICE
OFFICE
EQUIPEMENT
ROOM
CONFERENCE
ROOM
CORRIDOR
TOILET
LACTATION
ROOM
STORAGE
IT
TOILET
VESTIBULE
HAC
STAIR #2
OFFICE
OFFICE
CONFERENCE
ELEVATOR
BREAKROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
VESTIBULE
2 2 4 6 8 10 12 14 3/16" = 1'-0"
FEETSCALE
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
BI
M
VA
N C
H C
S/
9_ M cC le lla n.
rv t
/0
2/
1:
:0
VA106B
ARCHITECTURAL PLAN -
NEW LEVEL 2 FLOORING 209
3230 Peacekeeper Way McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Floor 2
FOR REFERENCE ONLY REPLACE FLOORING IN
MCCLELLAN
06.22.2026
NOTE:
ALL EXISTING WALL BASES WHERE FLOORING
IS REPLACED SHALL BE NEW RUBBER BASE:
· DEFAULT WALL BASE SHALL BE RB-1
· EXAM ROOMS SHALL BE RB-2
INSTALL NEW CARPETINSTALL NEW CARPET (CPT)
INSTALL NEW LUXURY VINYL TILE (LVT)
INSTALL NEW RESILIENT STAIR TREAD (RST)
UP
CONCRETE
CONFERENCE
M-TOILET
CONFERENCE
STORAGE
CONFERENCE
ROOM
MECHANICAL
MECHANICAL
LOUNGE
OFFICE
CONFERENCE
ROOM
101 OI&T
OFFICE
OFFICE
LIBRARY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
W-TOILET
STORAGE
OFFICE
14 SF
ELECTRICAL
CORRIDOR
ELEVATOR
VESTIBULE
STAIRS
VESTIBULE
C-127
HAC
111A
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA107A
ARCHITECTURAL PLAN -
EXISTING LEVEL 1 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
McClellan B949 3401 Beech St McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Floor 1
FEETSCALE
201510505 3/16" = 1'-0"
EXISTING CARPET
EXISTING VCT
UP
CONFERENCE
M-TOILET
CONFERENCE
STORAGE
CONFERENCE
MECHANICAL
MECHANICAL
LOUNGE
OFFICE
CONFERENCE
ROOM
101 OI&T
OFFICE
OFFICE
LIBRARY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
W-TOILET
STORAGE
OFFICE
ELECTRICAL
CORRIDOR
ELEVATOR
VESTIBULE
STAIRS
VESTIBULE
C-127
HAC
111A
ROOM
3/16" = 1'-0"1 Floor 1
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA107B
ARCHITECTURAL PLAN -
NEW LEVEL 1 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
McClellan B949 3401 Beech St McClellan Park, CA 95652
Revisions: Date:
FEETSCALE
201510505 3/16" = 1'-0"
NOTE:
ALL EXISTING WALL BASES WHERE FLOORING
IS REPLACED SHALL BE NEW RUBBER BASE:
· DEFAULT WALL BASE SHALL BE RB-1
· EXAM ROOMS SHALL BE RB-2
INSTALL NEW CARPETINSTALL NEW CARPET (CPT)
INSTALL NEW LUXURY VINYL TILE (LVT)
UPDN
OFFICE
222 M-TOILET
OFFICE
IT
217A
COPY
OFFICE
OFFICE
W-TOILET
212A
HAC
OFFICE
209A
OFFICE
209B
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
STAIRS
ELEVATOR
VESTIBULE
OFFICE
285 SF
BREAKROOM
76 SF
HAC
CORRIDOR
104 SF
OFFICE
230A
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA108A
ARCHITECTURAL PLAN -
EXISTING LEVEL 2 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
McClellan B949 3401 Beech St McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Floor 2
FEETSCALE
201510505 3/16" = 1'-0"
EXISTING CARPET
EXISTING VCT
UPDN
OFFICE
222 M-TOILET
OFFICE
IT
217A
COPY
OFFICE
OFFICE
W-TOILET
212A
HAC
OFFICE
209A
OFFICE
209B
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
STAIRS
ELEVATOR
VESTIBULE
OFFICE
BREAKROOM
HAC
CORRIDOR
OFFICE
230A
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA108B
ARCHITECTURAL PLAN -
NEW LEVEL 2 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
McClellan B949 3401 Beech St McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Floor 2
FEETSCALE
201510505 3/16" = 1'-0"
NOTE:
ALL EXISTING WALL BASES WHERE FLOORING
IS REPLACED SHALL BE NEW RUBBER BASE:
· DEFAULT WALL BASE SHALL BE RB-1
· EXAM ROOMS SHALL BE RB-2
INSTALL NEW CARPETINSTALL NEW CARPET (CPT)
INSTALL NEW LUXURY VINYL TILE (LVT)
OFFICE
322 M-TOILET
321A
OFFICE
OFFICE
OFFICE
COPY
OFFICE
CONFERENCE
BREAKROOM
W-TOILET
OFFICE
OFFICE
OFFICE
308OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
301OFFICE
STAIRS
ELEVATOR
VESTIBULE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
HAC
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA109A
ARCHITECTURAL PLAN -
EXISTING LEVEL 3 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
McClellan B949 3401 Beech St McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Floor 3
FEETSCALE
201510505 3/16" = 1'-0"
EXISTING CARPET
EXISTING VCT
OFFICE
322 M-TOILET
321A
OFFICE
OFFICE
OFFICE
COPY
OFFICE
CONFERENCE
BREAKROOM
W-TOILET
OFFICE
OFFICE
OFFICE
308OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
301OFFICE
STAIRS
ELEVATOR
VESTIBULE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
HAC
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
FOR REFERENCE ONLY
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
612A4-27-020
VA109B
ARCHITECTURAL PLAN -
NEW LEVEL 3 FLOORING
REPLACE FLOORING IN
MCCLELLAN
04.28.2026
McClellan B949 3401 Beech St McClellan Park, CA 95652
Revisions: Date:
3/16" = 1'-0"1 Floor 3
FEETSCALE
201510505 3/16" = 1'-0"
NOTE:
ALL EXISTING WALL BASES WHERE FLOORING
IS REPLACED SHALL BE NEW RUBBER BASE:
· DEFAULT WALL BASE SHALL BE RB-1
· EXAM ROOMS SHALL BE RB-2
INSTALL NEW CARPETINSTALL NEW CARPET (CPT)
INSTALL NEW LUXURY VINYL TILE (LVT)
| Sheets and Views |
| COVER |
File details come from the government source that posted it. Updated .