This document set consists of architectural drawings for flooring replacement projects at multiple Veterans Affairs facilities located in McClellan Park, California. The project involves replacing flooring in Buildings 88, 98, and 209, with work addressing parking lots, basement levels, and multiple floors within medical office buildings.

For Building 98 (VA Medical Center), the scope includes flooring replacement across three levels with existing carpet, vinyl composite tile (VCT), and stair treads to be replaced with new carpet (CPT), luxury vinyl tile (LVT), and resilient stair treads (RST). Exam rooms throughout require installation of RB-2 rubber base, while default wall bases use RB-1 rubber base specifications. Level 1 covers approximately 326 square feet of corridor space with multiple exam rooms, offices, and clinical spaces. Level 2 flooring extends across waiting areas, exam rooms, provider offices, and administrative spaces. The basement level contains mechanical systems and limited flooring work. Building 209 includes basement, Level 1, and Level 2 flooring work across office spaces, conference rooms, and support facilities. Building 949 requires flooring replacement across three levels including executive offices, conference rooms, breakrooms, and administrative spaces. The project specification notes indicate all existing wall bases where flooring is replaced shall be new rubber base with differentiated specifications by room type. Issue date for the majority of drawings is April 28, 2026, with one Building 209 drawing dated June 22, 2026. All drawings are marked as DRAFT and FOR REFERENCE ONLY with full sprinkler system coverage noted.

View the file

Other files

File Type Posted
36C26127Q0047.docx DOCX document
LVT-1_LUXURY VINYL TILE.pdf PDF
SOW ATTACHMENT_Specifications DRFT.pdf PDF
LVT-2_LUXURY VINYL TILE.pdf PDF
SOW Replace Flooring in McCellan_ DRFT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-013

VA100

COVER SHEET RE-SLURRY AND RE-STRIPE

BLDG. 88 AND 98 PARKING LOTS

04.28.2026

5342 Dudley Boulevard McClellan Park, CA 95652

Revisions: Date:

ARNOLD AVE

DUDLEY BLVD

Feet 1:1000

2001000 50

PALM ST

PEACEKEEPER W

AY

WATT AVE

O'MALLEY AVE

ARNOLD AVE

DRAFT

UP

MECHANICAL

ROOM

200 SF

STAIRS

1H27

EXTENT OF BUILDING ABOVE

LO

A

D

IN

G

MECHANICAL B

1/8" = 1'-0"1 Basement

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA101

ARCHITECTURAL PLAN -

BASEMENT (N.I.C.)

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

5342 Dudley Boulevard McClellan Park, CA 95652

Revisions: Date:

FEETSCALE

201510505 1/8" = 1'-0"

N

BASEMENT LEVEL IS NOT INCLUDED IN CONTRACT AND THE FLOOR PLAN IS ONLY PROVIDED FOR REFERENCE

UP

EXAM ROOM

1C81

EXAM ROOM

1C79

CONSULT

ROOM

1C75

CONSULT

ROOM

1C73U-TOILET

1C65A

PRINTING

1C67

CORRIDOR

1C82A

DECON

1D07

SOILED UTILITY

1D09

U-TOILET

1E11A

OFFICE

1B01A

EXAM ROOM

1B06

OFFICE

1B22

CONSULT

ROOM

1B08

EXAM ROOM

1B18

VITALS

1B16

EXAM ROOM

1C18

OFFICE

1C22

EXAM ROOM

1C24

OFFICE

1C28

EXAM ROOM

1C26

EXAM ROOM

1C12

EXAM ROOM

1C06

EXAM ROOM

1C04

CORRIDOR

1C82B

EXAM ROOM

1D21

CONSULT

ROOM

1D19

BREAKROOM

1E07

DRESSING

1E15B

HOLDING

1E15C

U-TOILET

1E15A

ULTRASOUND

1E19

W-TOILET

1A28

M-TOILET

1A26

OFFICE

1F02

OFFICE

1F05

OFFICE

1F03

CORRIDOR

1A30

STORAGE

1K17

M-TOILET

1A08

CONSULT

ROOM

1K06

CONSULT

ROOM

1K04

CORRIDOR

1F10

U-TOILET

1A16

ELECTRICAL

1H28

U-TOILET

1A18

HAC

1F01A

OFFICE

1F14

OFFICE

1F12

105 SF

EXAM ROOM

1H22

CORRIDOR

1B10

EXAM ROOM

1C32

EXAM ROOM

1C34

EXAM ROOM

1C36

EXAM ROOM

1C38

EXAM ROOM

1C42

EXAM ROOM

1B12

COPY ROOM

1B02

ELECTRICAL

1C25

U-TOILET

1C23A

STORAGE

1C91

OFFICE

1K02

CORRIDOR

1K00

OFFICE

1K08

OFFICE

1J14

OFFICE

1J12

HAC

1J06

STORAGE

1J08

OFFICE

1B05

VITALS

1B03

CONSULT

ROOM

1K01

OFFICE

1K05

CONSULT

ROOM

1K12

CORRIDOR

1J00A

BLOOD DRAW

1J32

ISOLATION

1D05

IT

1C85

U-TOILET

1C83

EXAM ROOM

1C58

EXAM ROOM

1C62

EXAM ROOM

1C56

EXAM ROOM

1C54

CONSULT

ROOM

1C66

EXAM ROOM

1C64

CONSULT

ROOM

1C72

CONSULT

ROOM

1C68

EXAM ROOM

1C52

EXAM ROOM

1C48

CONSULT

ROOM

1C74

EXAM ROOM

1C46

CONSULT

ROOM

1C61

CONSULT

ROOM

1C27

EXAM ROOM

1B15

OFFICE

1B07

PROCEDURE

ROOM

1B09

OFFICE

1C65

IT

1B02A

LACTATION

1B04

W-TOILET

1B34

CORRIDOR

1E00

ELECTRICAL

1E09

MAMMO

1D17

CONSULT

1D13

STORAGE

1E13

OFFICE

1D10A

OFFICE

1D00E

RECEPTION

1C93A

EXAM ROOM

1C16

EXAM ROOM

1C44

OFFICE

1G09

STORAGE

1G07

MAINTENANCE

OFFICE

1F30

CYLINDER

STOARAGE

1F28B

CORRIDOR

1F00

VESTIBULE

1A00

LOADING DOCK

W-TOILET

1A06

OFFICE

1K05A

EXAM ROOM

1C14

EXAM ROOM

1C08

TRIAGE

1C02

STAIR

#2

HAC

1G01

OFFICE

1F20A

PHARMACY

1G00

VAULT

1F26

FLAMMABLE

STORAGE

1F28A

EXAM ROOM

1B17

EXAM ROOM

1B19

OFFICE

1C63

EXAM ROOM

1Z04

EXAM ROOM

1H10

RECORDS

1E03

CORRIDOR

1C10

VESTIBULE

1D00A

SHOWER

1D11

CORRIDOR

1A32

CORRIDOR

1B10A

LAB

1J02

O&IT

1A20B

RECEIVING

1F20

PRINTING

1K14

CORRIDOR

1A10

CORRIDOR

1A04

RECEPTION

1B14

W-TOILET

1B11

RECORDS

1H20

ELEVATOR

CONTROL

ROOM

1A20A

OFFICE

1D01B

OFFICE

1C21

EXAM ROOM

1B24

CORRIDOR

1C30A

CORRIDOR

1C60

CORRIDOR

1C30

CORRIDOR

1D10

SUPPLY ROOM

1C23

WAITING

1B32

CORRIDOR

1E00A

CONTROL

ROOM

1E16

XRAY

1E15

XRAY

1E11

CORRIDOR

1J00

RECEPTION

1J04

CONSULT

ROOM

1C69

CONSULT

ROOM

1C71

CORRIDOR

1C82

STAIR #3

CORRIDOR

1H00

HAC

1B01B

CORRIDOR

1B00

STORAGE

1F01

ELECTRICAL

1C87

CENTRAL

WAITING AREA

1A12

OI&T

1Z09

DRESSING

1E12

STORAGE

1C67A

TOILET

1J103

GYM

1H20

TREATMENT

ROOM

1Z07

CORRIDOR

1K00A

STORAGE

1Z10

EXAM ROOM

1H22

STORAGE

1Z02

OFFICE

1H23

RECEPTION

1E01

SOILED LINEN

1C89

OFFICE

1D01A

PROCEDURE

1D03

VAULT

1G05

CORRIDOR

1A24

OFFICE

1F04

CONSULT

ROOM

1K08/27A

CONSULT

ROOM

1K08/28

CONSULT

ROOM

1K08/27B

CONSULT

ROOM

1K08/27C

STORAGE

1G07B

OFFICE

1F11

OFFICE

1F13

VAULT

1G00A

OFFICE

1D03A

BREAK ROOM

1D01

CONSULT

ROOM

1C69A

CLEAN LINEN

1Z06

OFFICE

1K14A

OFFICE

1Z12

OFFICE

1Z11

CLOSET

1Z08

STORAGEB

R

EA

K

R O

O M

MED SUPPLY

1C21A

ELEVATOR

1A20

CORRIDOR

1A11

U P

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA102A

ARCHITECTURAL PLAN -

EXISTING LEVEL 1 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

5342 Dudley Boulevard Street McClellan Park, CA 95652

Revisions: Date:

1/8" = 1'-0"1 Floor 2

FEETSCALE

201510505 1/8" = 1'-0"

N

EXISTING CARPET

EXISTING VCT

EXISTING STAIR TREAD

UP

EXAM ROOM

1C81

EXAM ROOM

1C79

CONSULT

ROOM

1C75

CONSULT

ROOM

1C73U-TOILET

1C65A

PRINTING

1C67

CORRIDOR

1C82A

DECON

1D07

SOILED UTILITY

1D09

U-TOILET

1E11A

OFFICE

1B01A

EXAM ROOM

1B06

OFFICE

1B22

CONSULT

ROOM

1B08

EXAM ROOM

1B18

VITALS

1B16

EXAM ROOM

1C18

OFFICE

1C22

EXAM ROOM

1C24

OFFICE

1C28

EXAM ROOM

1C26

EXAM ROOM

1C12

EXAM ROOM

1C06

EXAM ROOM

1C04

CORRIDOR

1C82B

EXAM ROOM

1D21

CONSULT

ROOM

1D19

BREAKROOM

1E07

DRESSING

1E15B

HOLDING

1E15C

U-TOILET

1E15A

ULTRASOUND

1E19

W-TOILET

1A28

M-TOILET

1A26

OFFICE

1F02

OFFICE

1F05

OFFICE

1F03

CORRIDOR

1A30

STORAGE

1K17

M-TOILET

1A08

CONSULT

ROOM

1K06

CONSULT

ROOM

1K04

CORRIDOR

1F10

U-TOILET

1A16

ELECTRICAL

1H28

U-TOILET

1A18

HAC

1F01A

OFFICE

1F14

OFFICE

1F12

105 SF

EXAM ROOM

1H22

CORRIDOR

1B10

EXAM ROOM

1C32

EXAM ROOM

1C34

EXAM ROOM

1C36

EXAM ROOM

1C38

EXAM ROOM

1C42

EXAM ROOM

1B12

COPY ROOM

1B02

ELECTRICAL

1C25

U-TOILET

1C23A

STORAGE

1C91

OFFICE

1K02

CORRIDOR

1K00

OFFICE

1K08

OFFICE

1J14

OFFICE

1J12

HAC

1J06

STORAGE

1J08

OFFICE

1B05

VITALS

1B03

CONSULT

ROOM

1K01

OFFICE

1K05

CONSULT

ROOM

1K12

CORRIDOR

1J00A

BLOOD DRAW

1J32

ISOLATION

1D05

IT

1C85

U-TOILET

1C83

EXAM ROOM

1C58

EXAM ROOM

1C62

EXAM ROOM

1C56

EXAM ROOM

1C54

CONSULT

ROOM

1C66

EXAM ROOM

1C64

CONSULT

ROOM

1C72

CONSULT

ROOM

1C68

EXAM ROOM

1C52

EXAM ROOM

1C48

CONSULT

ROOM

1C74

EXAM ROOM

1C46

CONSULT

ROOM

1C61

CONSULT

ROOM

1C27

EXAM ROOM

1B15

OFFICE

1B07

PROCEDURE

ROOM

1B09

OFFICE

1C65

IT

1B02A

LACTATION

1B04

W-TOILET

1B34

CORRIDOR

1E00

ELECTRICAL

1E09

MAMMO

1D17

CONSULT

1D13

STORAGE

1E13

OFFICE

1D10A

OFFICE

1D00E

RECEPTION

1C93A

EXAM ROOM

1C16

EXAM ROOM

1C44

OFFICE

1G09

STORAGE

1G07

MAINTENANCE

OFFICE

1F30

CYLINDER

STOARAGE

1F28B

CORRIDOR

1F00

VESTIBULE

1A00

LOADING DOCK

W-TOILET

1A06

OFFICE

1K05A

EXAM ROOM

1C14

EXAM ROOM

1C08

TRIAGE

1C02

STAIR

#2

HAC

1G01

OFFICE

1F20A

PHARMACY

1G00

VAULT

1F26

FLAMMABLE

STORAGE

1F28A

EXAM ROOM

1B17

EXAM ROOM

1B19

OFFICE

1C63

EXAM ROOM

1Z04

EXAM ROOM

1H10

RECORDS

1E03

326 SF

CORRIDOR

1C10

VESTIBULE

1D00A

SHOWER

1D11

CORRIDOR

1A32

CORRIDOR

1B10A

LAB

1J02

O&IT

1A20B

RECEIVING

1F20

PRINTING

1K14

CORRIDOR

1A10

CORRIDOR

1A04

RECEPTION

1B14

W-TOILET

1B11

RECORDS

1H20

ELEVATOR

CONTROL

ROOM

1A20A

OFFICE

1D01B

OFFICE

1C21

EXAM ROOM

1B24

CORRIDOR

1C30A

CORRIDOR

1C60

CORRIDOR

1C30

CORRIDOR

1D10

SUPPLY ROOM

1C23

WAITING

1B32

CORRIDOR

1E00A

CONTROL

ROOM

1E16

XRAY

1E15

XRAY

1E11

CORRIDOR

1J00

RECEPTION

1J04

CONSULT

ROOM

1C69

CONSULT

ROOM

1C71

CORRIDOR

1C82

STAIR #3

CORRIDOR

1H00

HAC

1B01B

CORRIDOR

1B00

STORAGE

1F01

ELECTRICAL

1C87

CENTRAL

WAITING AREA

1A12

OI&T

1Z09

DRESSING

1E12

STORAGE

1C67A

TOILET

1J103

GYM

1H20

TREATMENT

ROOM

1Z07

CORRIDOR

1K00A

STORAGE

1Z10

EXAM ROOM

1H22

STORAGE

1Z02

OFFICE

1H23

RECEPTION

1E01

SOILED LINEN

1C89

OFFICE

1D01A

PROCEDURE

1D03

VAULT

1G05

CORRIDOR

1A24

OFFICE

1F04

CONSULT

ROOM

1K08/27A

CONSULT

ROOM

1K08/28

CONSULT

ROOM

1K08/27B

CONSULT

ROOM

1K08/27C

STORAGE

1G07B

OFFICE

1F11

OFFICE

1F13

VAULT

1G00A

OFFICE

1D03A

BREAK ROOM

1D01

CONSULT

ROOM

1C69A

CLEAN LINEN

1Z06

OFFICE

1K14A

OFFICE

1Z12

OFFICE

1Z11

CLOSET

1Z08

STORAGEB

R

EA

K

R O

O M

MED SUPPLY

1C21A

ELEVATOR

1A20

CORRIDOR

1A11

U P

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA102B

ARCHITECTURAL PLAN -

NEW LEVEL 1 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

5342 Dudley Boulevard Street McClellan Park, CA 95652

Revisions: Date:

1/8" = 1'-0"1 Floor 2

FEETSCALE

201510505 1/8" = 1'-0"

N

NOTE:

ALL EXISTING WALL BASES WHERE FLOORING

IS REPLACED SHALL BE NEW RUBBER BASE:

· DEFAULT WALL BASE SHALL BE RB-1

· EXAM ROOMS SHALL BE RB-2

INSTALL NEW CARPET

INSTALL NEW LUXURY VINYL TILE (LVT)

INSTALL NEW RESILIENT STAIR TREAD (RST)

INSTALL NEW CARPET (CPT)

DN

DN

EXAM ROOM

2U13

EXAM ROOM

2U15

STORAGE

2U17

OFFICE

2U19

SOUND

BOOTHS

2L05A

OFFICE

2L03A

OFFICE

2L03B

AUDIOLOGY

2L03

HAC

2U11

U-TOILET

2U07

EXAM ROOM

2U05

OFFICE

2U03C

EXAM ROOM

2U03B

EXAM ROOM

2U03A

WAITING

2U01

OFFICE

2U03

BREAK ROOM

2T40

OFFICE

2T40A

OFFICE

2T40B

CORRIDOR

2L00A

WAITING

2L00

RECEPTION

2L02

TEST ROOM

2M13

EXAM ROOM

2M09

CORRIDOR

2M05

U-TOILET

2M07

EXAM ROOM

2M25

OFFICE

2M27

OFFICE

2M29

EXAM ROOM

2M31

PROVIDER

OFFICE

2M35

OFFICE

2M37

TREATMENT

2M39

EXAM ROOM

2M41

EXAM ROOM

2L07

OFFICE

2M15

OFFICE

2M17

OFFICE

2M19

OFFICE

2M21

HAC

2M23

EXAM ROOM

2M12

EXAM ROOM

2M14

EXAM ROOM

2M16

EXAM ROOM

2M18

OFFICE

2M22

OFFICE

2M24

EXAM ROOM

2M26

EXAM ROOM

2M28

EXAM ROOM

2M32

EXAM ROOM

2M34

IT

2M20A

ELECTRICAL

2M20B

OFFICE

2M08

OFFICE

2M06

COPY

2M04

OFFICE

2M02

EXAM ROOM

2N09

EXAM ROOM

2N07

ELEC.

2N05

U-TOILET

2N117

PROVIDER

OFFICE

2N13

BREAK ROOM

2N15

ELECTRICAL

COMMS

2M43OFFICE

2N45

OMNICELL

2M47

PROVIDER

OFFICE

2P19

OFFICE

2P21

EXAM ROOM

2P23

EXAM ROOM

2P25 EXAM ROOM

2P27

TREATMENT

2P29

OFFICE

2N00A

CHECK-IN

2P01

OFFICE

2P35

EXAM ROOM

2Q03A

STORAGE

2Q03

EXAM ROOM

2Q05

EXAM ROOM

2Q07

EXAM ROOM

2P31

U-TOILET

2P33

CONFERENCE

2A28

EQUIPMENT

2Q01

MECHANICAL

2A03AM-TOILET

2A16

W-TOILET

2A18

OFFICE

2A22

OFFICE

2R01

OFFICE

2R01A

CONSULT

ROOM

2S05

OFFICE

2S01

STORAGE

2S03

OFFICE

2A10A

OFFICE

2A10

OFFICE

2A08

OFFICE

2T17

OFFICE

2T15

OFFICE

2T21

HAC

2T19

OFFICE

2T27

EXAM ROOM

2T25

CONFERENCE

2T23

CONFERENCE

2T23A

OFFICE

2T11

OFFICE

2T13

IT

2T09A

IT

2T09B

MECHANICAL

2T09

OFFICE

2T07A

OFFICE

2T03

OFFICE

2T01

OI&T

2S13A

OFFICE

2T07 OFFICE

2T05

OFFICE

2S13

STORAGE

2S09B

GROUP ROOM

2S09

OFFICE

2S09A

OFFICE

2S07 OFFICE

2R07

STORAGE

2R05

CORRIDOR

2U00

VESTIBULE

2T30A

CORRIDOR

2T30

CORRIDOR

2L00B

CORRIDOR

2M11A

CORRIDOR

2M20

CORRIDOR

2M10

CORRIDOR

2M30

CORRIDOR

2M48

CORRIDOR

2N18

CORRIDOR

2N10

CORRIDOR

2P20

CORRIDOR

2P20A

CORRIDOR

2Q10

CORRIDOR

2Q00A

CORRIDOR

2A30

CORRIDOR

2A32

CORRIDOR

2R02

CORRIDOR

2T10

CORRIDOR

2T20

CORRIDOR

2T00B

OPEN TO BELOW OPEN TO BELOW

MEDICAL

RECORDS

2M03

CORRIDOR

2A12

CORRIDOR

2T00

CORRIDOR

2S04

CORRIDOR

2R10

STAIR #3

EXAM ROOM

2M11

PROVIDER

OFFICE

2N03A

ELEVATOR

1H25

BREAK

ROOM

TOILET

2T03A

CLOSET

2T03B

WAITING

2M00

RECEPTION

2M01

WAITING

2Q00

EXAM ROOM

2N03B

EXAM ROOM

2N03C

RECEPTION

2N03

SOUND BOOTH

2L05B

CORRIDOR

2L05

SOUND

BOOTH

2M05A

SOUND

BOOTH

2M05B

SOUND BOOTH

II

2L03C

SOUND BOOTH

I

2L03D

ROOF ACCESS ROOF ACCESS

#1 STAIR

LANDING

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA103A

ARCHITECTURAL PLAN -

EXISTING LEVEL 2 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

5342 Dudley Boulevard Street McClellan Park, CA 95652

Revisions: Date:

1/8" = 1'-0"1 Floor 2

FEETSCALE

201510505 1/8" = 1'-0"

EXISTING CARPET

EXISTING VCT

DN

EXAM ROOM

2U13

EXAM ROOM

2U15

STORAGE

2U17

OFFICE

2U19

SOUND

BOOTHS

2L05A

OFFICE

2L03A

OFFICE

2L03B

AUDIOLOGY

2L03

HAC

2U11

U-TOILET

2U07

EXAM ROOM

2U05

OFFICE

2U03C

EXAM ROOM

2U03B

EXAM ROOM

2U03A

WAITING

2U01

OFFICE

2U03

BREAK ROOM

2T40

OFFICE

2T40A

OFFICE

2T40B

CORRIDOR

2L00A

WAITING

2L00

RECEPTION

2L02

TEST ROOM

2M13

EXAM ROOM

2M09

CORRIDOR

2M05

U-TOILET

2M07

EXAM ROOM

2M25

OFFICE

2M27

OFFICE

2M29

EXAM ROOM

2M31

PROVIDER

OFFICE

2M35

OFFICE

2M37

TREATMENT

2M39

EXAM ROOM

2M41

EXAM ROOM

2L07

OFFICE

2M15

OFFICE

2M17

OFFICE

2M19

OFFICE

2M21

HAC

2M23

EXAM ROOM

2M12

EXAM ROOM

2M14

EXAM ROOM

2M16

EXAM ROOM

2M18

OFFICE

2M22

OFFICE

2M24

EXAM ROOM

2M26

EXAM ROOM

2M28

EXAM ROOM

2M32

EXAM ROOM

2M34

IT

2M20A

ELECTRICAL

2M20B

OFFICE

2M08

OFFICE

2M06

COPY

2M04

OFFICE

2M02

EXAM ROOM

2N09

EXAM ROOM

2N07

ELEC.

2N05

U-TOILET

2N117

PROVIDER

OFFICE

2N13

BREAK ROOM

2N15

ELECTRICAL

COMMS

2M43OFFICE

2N45

OMNICELL

2M47

PROVIDER

OFFICE

2P19

OFFICE

2P21

EXAM ROOM

2P23

EXAM ROOM

2P25 EXAM ROOM

2P27

TREATMENT

2P29

OFFICE

2N00A

CHECK-IN

2P01

OFFICE

2P35

EXAM ROOM

2Q03A

STORAGE

2Q03

EXAM ROOM

2Q05

EXAM ROOM

2Q07

EXAM ROOM

2P31

U-TOILET

2P33

CONFERENCE

2A28

EQUIPMENT

2Q01

MECHANICAL

2A03AM-TOILET

2A16

W-TOILET

2A18

OFFICE

2A22

OFFICE

2R01

OFFICE

2R01A

CONSULT

ROOM

2S05

OFFICE

2S01

STORAGE

2S03

OFFICE

2A10A

OFFICE

2A10

OFFICE

2A08

OFFICE

2T17

OFFICE

2T15

OFFICE

2T21

HAC

2T19

OFFICE

2T27

EXAM ROOM

2T25

CONFERENCE

2T23

CONFERENCE

2T23A

OFFICE

2T11

OFFICE

2T13

IT

2T09A

IT

2T09B

MECHANICAL

2T09

OFFICE

2T07A

OFFICE

2T03

OFFICE

2T01

OI&T

2S13A

OFFICE

2T07 OFFICE

2T05

OFFICE

2S13

STORAGE

2S09B

GROUP ROOM

2S09

OFFICE

2S09A

OFFICE

2S07 OFFICE

2R07

STORAGE

2R05

CORRIDOR

2U00

VESTIBULE

2T30A

CORRIDOR

2T30

CORRIDOR

2L00B

CORRIDOR

2M11A

CORRIDOR

2M20

CORRIDOR

2M10

CORRIDOR

2M30

CORRIDOR

2M48

CORRIDOR

2N18

CORRIDOR

2N10

CORRIDOR

2P20

CORRIDOR

2P20A

CORRIDOR

2Q10

CORRIDOR

2Q00A

CORRIDOR

2A30

CORRIDOR

2A32

CORRIDOR

2R02

CORRIDOR

2T10

CORRIDOR

2T20

CORRIDOR

2T00B

OPEN TO

BELOW

OPEN TO

BELOW

MEDICAL

RECORDS

2M03

CORRIDOR

2A12

CORRIDOR

2T00

CORRIDOR

2S04

CORRIDOR

2R10

STAIR #3 LANDING

EXAM ROOM

2M11

PROVIDER

OFFICE

2N03A

ELEVATOR

1H25

BREAK

ROOM

TOILET

2T03A

CLOSET

2T03B

WAITING

2M00

RECEPTION

2M01

WAITING

2Q00

EXAM ROOM

2N03B

EXAM ROOM

2N03C

RECEPTION

2N03

SOUND BOOTH

2L05B

CORRIDOR

2L05

SOUND

BOOTH

2M05A

SOUND

BOOTH

2M05B

SOUND BOOTH

II

2L03C

SOUND BOOTH

I

2L03D

ROOF

ACCESS

ROOF

ACCESS

#1 STAIR

LANDING

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA103B

ARCHITECTURAL PLAN -

NEW LEVEL 2 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

5342 Dudley Boulevard Street McClellan Park, CA 95652

Revisions: Date:

1/8" = 1'-0"1 Floor 2

FEETSCALE

201510505 1/8" = 1'-0"

INSTALL NEW CARPET (CPT)

INSTALL NEW LUXURY VINYL TILE (LVT)

INSTALL NEW RESILIENT STAIR TREAD (RST)

NOTE:

ALL EXISTING WALL BASES WHERE FLOORING

IS REPLACED SHALL BE NEW RUBBER BASE:

· DEFAULT WALL BASE SHALL BE RB-1

· EXAM ROOMS SHALL BE RB-2

UP UP

VACANT SPACE

PRINTING

LOADING DOCK

STORAGE

IT

OFFICE

OFFICE

OFFICE

STORAGE

22B

STORAGE

22A

CORRIDOR

23A

CONFERENCE

ROOM

STORAGE

8A

STORAGE

CORRIDOR

C1

OFFICE

OFFICE

5A

CORRIDOR

C2

PUMP ROOM

CORRIDOR

C3

ELECTRICAL

7A

ELEVATOR

CORRIDOR

C4

MECHANICAL

MECHANICAL

CORRIDOR

STAIR #2

SERVICE ELEVATOR

OFFICE

OFFICE

OPEN OFFICE

BREAKROOM

LACTATION

29B

VESTIBULE

29A

WOMENS

DUNGEON

7B

MENSHAC

CHASE

2 2 4 6 8 10 12 14 3/16" = 1'-0"

FEETSCALE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA104A

ARCHITECTURAL PLAN -

EXISTING BASEMENT FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.27.2026

3230 Peacekeeper Way McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Basement

EXISTING CARPET

EXISTING VCT

EXISTING STAIR TREAD

DRAFT

http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com

UP UP

VACANT SPACE

PRINTING

LOADING DOCK

STORAGE

IT

OFFICE

OFFICE

OFFICE

STORAGE

22B

STORAGE

22A

CORRIDOR

23A

CONFERENCE

ROOM

STORAGE

8A

STORAGE

CORRIDOR

C1

OFFICE

OFFICE

5A

CORRIDOR

C2

PUMP ROOM

CORRIDOR

C3

ELECTRICAL

7A

ELEVATOR

CORRIDOR

C4

MECHANICAL

MECHANICAL

CORRIDOR

STAIR #2

SERVICE ELEVATOR

OFFICE

OFFICE

OPEN OFFICE

BREAKROOM

LACTATION

29B

VESTIBULE

29A

WOMENS

DUNGEON

7B

MENSHAC

CHASE

3/16" = 1'-0"1 Basement 2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA104B

ARCHITECTURAL PLAN -

NEW BASEMENT FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.27.2026

3230 Peacekeeper Way McClellan Park, CA 95652

Revisions: Date:

NOTE:

ALL EXISTING WALL BASES WHERE FLOORING

IS REPLACED SHALL BE NEW RUBBER BASE:

· DEFAULT WALL BASE SHALL BE RB-1

· EXAM ROOMS SHALL BE RB-2

INSTALL NEW CARPETINSTALL NEW CARPET (CPT)

INSTALL NEW LUXURY VINYL TILE (LVT)

INSTALL NEW RESILIENT STAIR TREAD (RST)

DRAFT

http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com

UP

DN

UP

UPUP

DN

DN

ENTRY

STAIR #1

LOBBY

CORRIDOR

103A

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

111A

IT

OFFICE

MANAGEMENT

114A

MANAGEMENT

114B

102 SF

OFFICE

114C

OFFICE

114D

OFFICE

114E

OFFICE

114F

MANAGEMENT

OFFICE

115 M-TOILET

W-TOILET

CORRIDOR

IT

HAC

BREAKROOM

OFFICE

126A

OFFICE

126B

OFFICE

126C

OFFICE

126D

OFFICE

126E

OFFICE

CONFERENCE

ROOM

CONFERENCE

ROOM

ELEVATOR

STAIR #2

OPEN OFFICE

SPACE

COPY

OFFICE

113A

MECHANICAL

2 2 4 6 8 10 12 14 3/16" = 1'-0"

FEETSCALE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

BI

M

VA

N C

H C

S/

9_ M cC le lla n.

rv t

/0

2/

1:

:0

VA105A

ARCHITECTURAL PLAN -

EXISTING LEVEL 1 FLOORING 209

3230 Peacekeeper Way McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Floor 1

FOR REFERENCE ONLY REPLACE FLOORING IN

MCCLELLAN

06.22.2026

EXISTING CARPET

EXISTING VCT

DN

UP

UPUP

DN

UP

ENTRY

STAIR #1

LOBBY

CORRIDOR

103A

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

111A

IT

OFFICE

MANAGEMENT

114A

MANAGEMENT

114B

OFFICE

114C

OFFICE

114D

OFFICE

114E

OFFICE

114F

MANAGEMENT

OFFICE

258 SF

M-TOILET

284 SF

W-TOILET

CORRIDOR

IT

HAC

BREAKROOM

OFFICE

126A

OFFICE

126B

OFFICE

126C

OFFICE

126D

OFFICE

126E

OFFICE

CONFERENCE

ROOM

CONFERENCE

ROOM

ELEVATOR

STAIR #2

OPEN OFFICE

SPACE

COPY

OFFICE

113A

MECHANICAL

M-TOILET

W-TOILET

3/16" = 1'-0"1 Floor 1 2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

BI

M

VA

N C

H C

S/

9_ M cC le lla n.

rv t

/0

2/

1:

:0

VA105B

ARCHITECTURAL PLAN -

NEW LEVEL 1 FLOORING 209

3230 Peacekeeper Way McClellan Park, CA 95652

Revisions: Date:

FOR REFERENCE ONLY REPLACE FLOORING IN

MCCLELLAN

06.22.2026

INSTALL NEW CARPETINSTALL NEW CARPET (CPT)

INSTALL NEW LUXURY VINYL TILE (LVT)

INSTALL NEW RESILIENT STAIR TREAD (RST)

NOTE:

ALL EXISTING WALL BASES WHERE FLOORING

IS REPLACED SHALL BE NEW RUBBER BASE:

· DEFAULT WALL BASE SHALL BE RB-1

· EXAM ROOMS SHALL BE RB-2

DN

DN

DN

VESTIBULE

LANDING

201A

LOBBY

OFFICE

OFFICE

OFFICE

OFFICE

EQUIPEMENT

ROOM

CONFERENCE

ROOM

CORRIDOR

TOILET

LACTATION

ROOM

STORAGE

IT

TOILET

VESTIBULE

HAC

STAIR #2

OFFICE

OFFICE

CONFERENCE

ELEVATOR

BREAKROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

2 2 4 6 8 10 12 14 3/16" = 1'-0"

FEETSCALE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

BI

M

VA

N C

H C

S/

9_ M cC le lla n.

rv t

/0

2/

1:

:0

VA106A

ARCHITECTURAL PLAN -

EXISTING LEVEL 2 FLOORING 209

3230 Peacekeeper Way McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Floor 2

FOR REFERENCE ONLY REPLACE FLOORING IN

MCCLELLAN

06.22.2026

EXISTING CARPET

EXISTING VCT

DN

DN

DN

VESTIBULE

LANDING

201A

LOBBY

OFFICE

OFFICE

OFFICE

OFFICE

EQUIPEMENT

ROOM

CONFERENCE

ROOM

CORRIDOR

TOILET

LACTATION

ROOM

STORAGE

IT

TOILET

VESTIBULE

HAC

STAIR #2

OFFICE

OFFICE

CONFERENCE

ELEVATOR

BREAKROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

VESTIBULE

2 2 4 6 8 10 12 14 3/16" = 1'-0"

FEETSCALE

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

BI

M

VA

N C

H C

S/

9_ M cC le lla n.

rv t

/0

2/

1:

:0

VA106B

ARCHITECTURAL PLAN -

NEW LEVEL 2 FLOORING 209

3230 Peacekeeper Way McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Floor 2

FOR REFERENCE ONLY REPLACE FLOORING IN

MCCLELLAN

06.22.2026

NOTE:

ALL EXISTING WALL BASES WHERE FLOORING

IS REPLACED SHALL BE NEW RUBBER BASE:

· DEFAULT WALL BASE SHALL BE RB-1

· EXAM ROOMS SHALL BE RB-2

INSTALL NEW CARPETINSTALL NEW CARPET (CPT)

INSTALL NEW LUXURY VINYL TILE (LVT)

INSTALL NEW RESILIENT STAIR TREAD (RST)

UP

CONCRETE

CONFERENCE

M-TOILET

CONFERENCE

STORAGE

CONFERENCE

ROOM

MECHANICAL

MECHANICAL

LOUNGE

OFFICE

CONFERENCE

ROOM

101 OI&T

OFFICE

OFFICE

LIBRARY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

W-TOILET

STORAGE

OFFICE

14 SF

ELECTRICAL

CORRIDOR

ELEVATOR

VESTIBULE

STAIRS

VESTIBULE

C-127

HAC

111A

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA107A

ARCHITECTURAL PLAN -

EXISTING LEVEL 1 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

McClellan B949 3401 Beech St McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Floor 1

FEETSCALE

201510505 3/16" = 1'-0"

EXISTING CARPET

EXISTING VCT

UP

CONFERENCE

M-TOILET

CONFERENCE

STORAGE

CONFERENCE

MECHANICAL

MECHANICAL

LOUNGE

OFFICE

CONFERENCE

ROOM

101 OI&T

OFFICE

OFFICE

LIBRARY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

W-TOILET

STORAGE

OFFICE

ELECTRICAL

CORRIDOR

ELEVATOR

VESTIBULE

STAIRS

VESTIBULE

C-127

HAC

111A

ROOM

3/16" = 1'-0"1 Floor 1

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA107B

ARCHITECTURAL PLAN -

NEW LEVEL 1 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

McClellan B949 3401 Beech St McClellan Park, CA 95652

Revisions: Date:

FEETSCALE

201510505 3/16" = 1'-0"

NOTE:

ALL EXISTING WALL BASES WHERE FLOORING

IS REPLACED SHALL BE NEW RUBBER BASE:

· DEFAULT WALL BASE SHALL BE RB-1

· EXAM ROOMS SHALL BE RB-2

INSTALL NEW CARPETINSTALL NEW CARPET (CPT)

INSTALL NEW LUXURY VINYL TILE (LVT)

UPDN

OFFICE

222 M-TOILET

OFFICE

IT

217A

COPY

OFFICE

OFFICE

W-TOILET

212A

HAC

OFFICE

209A

OFFICE

209B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

STAIRS

ELEVATOR

VESTIBULE

OFFICE

285 SF

BREAKROOM

76 SF

HAC

CORRIDOR

104 SF

OFFICE

230A

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA108A

ARCHITECTURAL PLAN -

EXISTING LEVEL 2 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

McClellan B949 3401 Beech St McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Floor 2

FEETSCALE

201510505 3/16" = 1'-0"

EXISTING CARPET

EXISTING VCT

UPDN

OFFICE

222 M-TOILET

OFFICE

IT

217A

COPY

OFFICE

OFFICE

W-TOILET

212A

HAC

OFFICE

209A

OFFICE

209B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

STAIRS

ELEVATOR

VESTIBULE

OFFICE

BREAKROOM

HAC

CORRIDOR

OFFICE

230A

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA108B

ARCHITECTURAL PLAN -

NEW LEVEL 2 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

McClellan B949 3401 Beech St McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Floor 2

FEETSCALE

201510505 3/16" = 1'-0"

NOTE:

ALL EXISTING WALL BASES WHERE FLOORING

IS REPLACED SHALL BE NEW RUBBER BASE:

· DEFAULT WALL BASE SHALL BE RB-1

· EXAM ROOMS SHALL BE RB-2

INSTALL NEW CARPETINSTALL NEW CARPET (CPT)

INSTALL NEW LUXURY VINYL TILE (LVT)

OFFICE

322 M-TOILET

321A

OFFICE

OFFICE

OFFICE

COPY

OFFICE

CONFERENCE

BREAKROOM

W-TOILET

OFFICE

OFFICE

OFFICE

308OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

301OFFICE

STAIRS

ELEVATOR

VESTIBULE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

HAC

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA109A

ARCHITECTURAL PLAN -

EXISTING LEVEL 3 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

McClellan B949 3401 Beech St McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Floor 3

FEETSCALE

201510505 3/16" = 1'-0"

EXISTING CARPET

EXISTING VCT

OFFICE

322 M-TOILET

321A

OFFICE

OFFICE

OFFICE

COPY

OFFICE

CONFERENCE

BREAKROOM

W-TOILET

OFFICE

OFFICE

OFFICE

308OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

301OFFICE

STAIRS

ELEVATOR

VESTIBULE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

HAC

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-020

VA109B

ARCHITECTURAL PLAN -

NEW LEVEL 3 FLOORING

REPLACE FLOORING IN

MCCLELLAN

04.28.2026

McClellan B949 3401 Beech St McClellan Park, CA 95652

Revisions: Date:

3/16" = 1'-0"1 Floor 3

FEETSCALE

201510505 3/16" = 1'-0"

NOTE:

ALL EXISTING WALL BASES WHERE FLOORING

IS REPLACED SHALL BE NEW RUBBER BASE:

· DEFAULT WALL BASE SHALL BE RB-1

· EXAM ROOMS SHALL BE RB-2

INSTALL NEW CARPETINSTALL NEW CARPET (CPT)

INSTALL NEW LUXURY VINYL TILE (LVT)

Sheets and Views
COVER

File details come from the government source that posted it. Updated .