SOW Attachment (9) Contractor Production Report Form.docx
DOCX document 27 KB Posted
- Solicitation number
- N64498-25-R-4034
About this file
The submitted file is a Contractor Production Report Form for a fire alarm and mass notification system (FA&MNS) repair project at Building 542. The form is designed to track daily construction activities, safety measures, work hours, equipment usage, and potential incidents. It provides a structured template for contractors to document project progress, including sections for work performed, job safety meetings, total work hours, accidents, equipment and material received, and construction equipment on-site.
The associated federal contract opportunity (Solicitation N64498-25-R-4034) involves the Naval Surface Warfare Center, Philadelphia Division seeking a design-build solution to replace the existing fire alarm system and integrate a new mass notification system in Building 542. The project requires full design and implementation of labor, materials, and equipment to create a fully functional integrated system meeting specific UFC standards. The contract has a 199-day completion timeline, will be awarded using a Lowest Price, Technically Acceptable (LPTA) evaluation method, and requires performance and payment bonding. Work is restricted to Monday through Friday, 0700-1600 hours, with potential for authorized overtime.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
BLDG 542 FIRE ALARM & MASS NOTIFICATION SYSTEM (FA&MNS) REPAIR
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
| |_| YES |
| |_| NO |
| TOTAL WORK HOURS ON JOB SITE, |
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
| |_| YES |
| |_| NO |
| CUMULATIVE TOTAL OF WORK |
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
| |_| YES |
| |_| NO |
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
| |_| YES |
| |_| NO |
Schedule Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| |_| |
| SAFETY REQUIREMENTS HAVE BEEN MET. |
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
SOW Attachment 9 Contractor Production Report Form
BLDG 542 FIRE ALARM & MASS NOTIFICATION SYSTEM (FA&MNS) REPAIR
Sheet 1 of 1