SOW Attachment 2 - Corrective and Preventive Maintenance Checklist.pdf
PDF 121 KB Posted
- Solicitation number
- 36C26126Q0377
About this file
This document is a Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts used by the VA (Veterans Affairs Medical Centers). The checklist serves as a commissioning and inspection template to verify proper installation, functionality, and safety compliance of ceiling-mounted patient lift systems before they are released into service.
The checklist is organized into four primary inspection categories: Structure, Rails/Tracks and End Stops, Lift Unit and Straps, and Load Testing. Structure inspection verifies proper connections to the building's structural system, including seismic bracing, ceiling interface compatibility, and protective features around support rods. Rails/Tracks and End Stops inspection confirms proper tightening of fasteners, gap-free installation, cleanliness, and proper installation of end stops or docking gates. Lift Unit and Straps inspection includes visual casing inspection, charging verification, hand control operation testing, indicator light functionality, emergency function verification, strap extension and condition assessment, and spreader bar integrity. Load Testing verifies soft start/stop features with lifting speeds not exceeding 2.5 inches per second at zero load and 1.5 inches per second at maximum capacity, load and deflection testing at rated capacity, emergency stop function, and emergency lowering capability. The document includes a critical safety note that ceiling-mounted patient lifts are not to be installed in treatment units with actively suicidal patients. Completion requires sign-off from three parties: the Inspector, the VA Representative, and the Manager of the Service Using the Ceiling Mounted Lifts, with the manager confirming staff training and ongoing training processes are in place.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126Q0377_Combined Synopsis.docx | DOCX document | |
| 36C26126Q0377_Combined Synopsis.docx | DOCX document | |
| WD 2015-5641 Rev 29 dated 12-03-2025.pdf | ||
| 36C26126Q0377_Patient Lift Devices and Scales Maintenance and Repair_SAM.docx | DOCX document | |
| SOW Attach 1 - Patient Lift Devices and Scales by Acq Date and Location.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision 2.1 1 of 2 Serial #: ____________________
PASS FAIL
PASS FAIL
The commissioning for a patient ceiling lift system(s) shall include, but not be limited to, the following points as components of the commissioning procedures.
NOTE: Ceiling mounted patient lifts are not to be installed in treatment units with actively suicidal patients.
Lift Location:
VAMC Contact's Phone Number:
Installer:
VAMC Contact:
Manufacturer:
Model:
Facility: Work Order:
Serial Number: EE Number:
Installer's Phone Number:
Structure
Rails/Tracks and End Stops
NOTES:
Lift Unit and Straps
NOTES:
Perform a visual inspection to verify structural component sizing and physical installation to ensure that the correct structural system is in place and properly installed to support the lift.
Verification that all fasteners and set screws are properly tightened on the trollies and rails/tracks.
Ensure that the rail/track is free of gaps (unless required by design). If included in installation, verify rail turntable function, exchanger function, gate alignment, and safety block installation.
Confirm track is clean and clear of all debris. (Use manufacturer’s recommended cleaning materials to avoid damage to the motor case and other components.)
Verification that all manufacturer specified end stops or docking gates are properly installed.
Inspection of lift unit casing for cracks and alignment.
Inspection and activation of hand control for full operation (e.g., up, down, left, right) and “return to charge” function if applicable.
Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts
Mfgr Contact's Phone Number:
Date:
Mfgr Contact:
Confirm any and all lift unit indicator lights are functioning. (e.g., red service warning light, charging state light) Inspection and verification of all emergency functions of the lift unit.
Inspection of spreader bar and clips for cracks and for loose or missing rings or cotter pins.
Full extension and inspection of lift strap for loose threads or frays.
Complete
Verification that the lift unit charges properly.
Perform a visual inspection to verify proper connections of the lift's structural system to the building’s structure (including seismic bracing if applicable).
Perform a visual inspection to verify proper interface at the ceiling (hard deck or soft tile) and proper installation of all protective features around the support rods and rails/tracks.
Revision 2.1 2 of 2 Serial #: ____________________
PASS FAIL
NOTES:
After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the inspector shall release the ceiling mounted lift installation to VA representative.
SIGNATURE:
After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the manager of the service using the ceiling mounted lifts confirms that the current staff have received initial training on ceiling mounted lifts and that there is a process in place to provide ongoing training on the proper use of ceiling mounted lifts.
SIGNATURE:
TITLE:
Manager of the Service Using the Ceiling Mounted Lifts COMPLETE
TITLE:
VA Representative After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the VA representative shall review those items with the inspector prior to releasing the ceiling mounted lift back into service to ensure completion of all requirements.
SIGNATURE:
COMPLETE
Inspector COMPLETE
DATE:
DATE:
DATE:
Verification of any “soft start” or “soft stop” features and that lifting speed does not exceed 2.5 inches per second with “zero” load.
Verification of load testing and deflection testing at the manufacturer's specified maximum rated lift capacity.
Verification of any “soft start” and “soft stop” features and that lifting speed does not exceed 1.5 inches per second under maximum rated lift capacity.
Verification of emergency lowering feature at maximum rated lift capacity.
TITLE:
Verification of function of emergency stop at maximum rated lift capacity.
NOTES:
Load Testing
Inspection
| Facility: |
| Work Order: |
| Manufacturer: |
| Lift Location: |
| Model: |
| VAMC Contact: |
| Serial Number: |
| EE Number: |
| VAMC Contacts Phone Number: |
| Mfgr Contact: |
| Installer: |
| Mfgr Contacts Phone Number: |
| Installers Phone Number: |
| Date: |
| NOTES: |
| NOTES_2: |
| Serial: |
| NOTES_3: |
| NOTES_4: |
| DATE: |
| TITLE: |
| DATE_2: |
| TITLE_2: |
| DATE_3: |
| TITLE_3: |
| Serial_2: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |