SOW Attachment 09 - Jefferson Barracks - EHRM Building Plans_Part2.pdf
PDF 15 MB Posted
- Solicitation number
- 36C77622R0032
About this file
This notice is seeking Statements of Qualifications from firms for Architect-Engineering design services for an EHRM Infrastructure Upgrade project at the Veterans Affairs Saint Louis Health Care System in St. Louis, Missouri. The project scope involves network infrastructure installation, IT system renovations and upgrades, including improvements to electrical, HVAC, communications infrastructure, fiber connectivity, and security. Responses are due by January 11, 2023. The contract will be set aside for Service-Disabled Veteran-Owned Small Businesses and is estimated between $10-20 million for design and construction management services over a 365 day period of performance. Evaluation criteria include specialized experience with similar IT and network upgrade projects, professional qualifications of staff, capacity to complete the work on schedule, and past performance. The secondary criterion is geographic proximity to the project site.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GFI
GFI
ELEC
SHOP-FLR
1A 107
150 SF
PLUMBING
SHOP-FLR
1A 105
200 SF
MACH +
A/C-BENCH
1A 100a
440 SF
CART
STOR.
1A 108
600 SF
CARPENTRY
SHOP-BENCH
1A 104
1000 SF
LOCKSMITH
- BENCH
1A 102
150 SF
PAINT
SHOP
-BENCH
1A 103
380 SF
CONF RM
1B 100
300 SF
INT DESIGN
1B 125a
455 SF
VISN
WORK
ROOM
1B 128
270 SF
OFFICE,
FOREMAN
1B 101
120 SF
OFFICE, IH
1B 115
120 SF
OFFICE, IH
1B 114
120 SF
OFFICE,
SAFETY
1B 116
120 SF
OFFICE, PE
1B 102
120 SF
OFFICE, PE
1B 103
120 SF
OFFICE, PE
1B 104
120 SF
OFFICE, PE
1B 107
120 SF127
OFFICE, PE
1B 109
120 SF145
OFFICE, PE
1B 111
120 SF 129
OFFICE, PE
1B 110
120 SF
OFFICE,
CHIEF
1B 112
120 SF
OFFICE
ASSIST
1B 113
120 SF
OFFICE, PE
1B 108
120 SF
OFFICE, PE
1B 105
120 SF
OFFICE
AMMS
ASSIST
1B 131
120 SF 158
OFFICE
AMMS
CHIEF
1B 132
120 SF140
OFFICE
VISN
CONTRACT
1B 130
120 SF141
OFFICE
VISN
CONTRACT
1B 129
120 SF
ELEC
1A 106
0 SF
OFFICE
1B 119
0 SF
ELEC
1A 104d
0 SF
MECH
ENTR
1A 101
0 SF
M TOILET
1B 124
100 SF
W TOILET
1B 123
100 SF
PAINT
SHOP
-FLAMMABLE
STOR
1A 103c
220 SF
PAINT
AREA
1A 103b
500 SF
OFFICE
1A 104e
120 SF
OFFICE
1A 105c
120 SF
OFFICE
1A 100c
120 SF
OFFICE
1A 107c
120 SF
LOBBY
C1-2
0 SF
LOUNGE
1A 105e
200 SF
HOSP.
PLANS &
DRAFTING
1B 125
250 SF
E CORR
C1-16
0 SF
S CORR
C1-8
0 SF
W CORR
C1-9
0 SF
CORR
C1-12
0 SF
AMMS
ADMIN
CUBICLES
(6).
1B 133
480 SF
CLERK
CUBICLES
(4)
1B 106
384 SF
CORR
C1-7
0 SF
INSULATION
SP
1A 105f
300 SF
CARPENTRY
SHOP-FLR.
1A 104a
800 SF483
CARPENTRY
SHOP-STOR.
1A 104b
618 SF
MASON
SHOP
1A 104c
200 SF
LOCKSMITH
- STOR
1A 102b
150 SF
PAINT
SHOP-FLR
1A 103a
80 SF
ELEC
SHOP-BENCH
1A 107a
660 SF
CORR
C1-13
0 SF
CORR
C1-14
0 SF
LOUNGE
1B 122
400 SF
CARPENTRY
TOOL
LOCK-UP
1A 104f
100 SF
PLUMBING
TOOL
LOCK-UP
1A 105d
90 SF
ELECTRICAL
TOOL
LOCK-UP
1A 107d
80 SF
OFFICE
1B 118
120 SF
DATA
1B 121
0 SF81
DATA
1B 120
0 SF
VESTIBULE
C1-1
0 SF
BID
OPG/CONF
1B 134
168 SF
ELEC
SHOP-STOR
1A 107b
700 SF
LOUNGE
1A 100e
200 SF
MACH+A/C
TOOL
LOCK-UP
1A 100d
100 SF
WORK
AREA
1B 106a
CORR
C1-5
CORR
C1-4
CORR
C1-6
MACH+A/C
STORAGE
1A 100f
CARPENTRY
STOR.
1A 104h
LOUNGE
1A 104g
PLUMBING
SHOP-STOR
1A 105a
PLUMBING
SHOP-BENCH
1A 105b
LOUNGE
1A 107e
ALCOVE
C1-24
ALCOVE
C1-25
ALCOVE
C1-26
ALCOVE
C1-22
ALCOVE
C1-23
ALCOVE
C1-20
ALCOVE
C1-21
ALCOVE
C1-28
ALCOVE
C1-27
ALCOVE
C1-29
PT-A-1 PT-A-2
W TOILET
1B 127
150 SF
M TOILET
1B 126
250 SF
W SHOWER
1B 127a
0 SF
M SHOWER
1B 126a
50 SF
SC-B-1
SC-B-1
SC-B-1
P-1-2
P-1-2
P-1-2P-1-2P-1-2
P-1-2P-1-2
P-1-2P-2-3 ALL WALLS P-1-2
P-2-4
P-2-4
P-1-2
P-1-2P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
ALL WALLS P-1-2
P-1-2 P-1-2 P-1-2 P-1-2 P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
P-1-2
PT-C-1
PT-C-1
PT-C-1
PT-C-1
PT-2-4
PT-C-1
P-2-4
P-2-4
P-2-4
PT-C-1
PT-C-1
PT-C-1PT-C-1
EQ
EQ
EQ.
EQ.
1' - 0" 1' - 0"EQ. - EQ.
PT-A-1
PT-A-2
GENERAL NOTES - FINISH PLAN
1. FOR COLOR AND MATERIAL LEGEND AND SCHEDULE OF FINISHES SEE
SPECIFICATION SECTION 09 06 00.
2. ALIGN FLOOR TILE JOINTS AS SHOWN, EVERY ONE 18" X 18" TILE TO
EVERY THREE 6" X 12" TILES. FOR MORE INFORMATION ON FINISH
MATERIALS SEE 090600 FINISH SCHEDULE
3. FOR MORE INFORMATION ABOUT ACCENT PAINT EXTENTS IN CORRIDORS
SEE INTERIOR ELEVATIONS ON SHEET AI404.
PLAN TRUE
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Revisions
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofNo.
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e ei g h th in ch o n e fo o t
B
A
E th re e in ch es o n e fo o t o n e a n d o n e h a lf in ch es o n e fo o t o n e in ch o n e fo o t th re e q u a rt er s in ch o n e fo o t o n e h a lf in ch o n e fo o t th re e ei g h th s in ch o n e fo o t o n e q u a rt er in ch o n e fo o t
VA FORM 08-6231
5 6 87
F
D
C
94321
5 6 87 94321
B
A
E
F
D
C
JEFFERSON BARRACKS DIVISION
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
PRINTED ON ORIGINAL SIZE OF SHEET IS 30" X 42"
Department of Veterans AffairsDate
CODE CONSULTANT/FIRE PROTECTION:
CODE CONSULTANTS, INC.
2043 WOODLAND PARKWAY, SUITE 300
SAINT LOUIS, MO 63146-4235
PHONE: (314) 991-2633
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
TECHNOLOGY:
KJWW ENGINEERING CONSULTANTS
#15 SUNNEN DRIVE, SUITE 104
SAINT LOUIS, MO 63143
PHONE: (314) 645-1132
IRRIGATION CONSULTANT:
IRM
9502 BANYON TREE
ST. LOUIS, MO 63126
PHONE: (314) 610-4200
STRUCTURAL ENGINEER:
COWELL ENGINEERING
3008 SUTTON BOULEVARD
ST. LOUIS, MO 63143
PHONE: (314) 644-4002
CERTIFICATE OF AUTHORITY: 001487
MECHANICAL/ELECTRICAL/PLUMBING:
303RD ENGINEERING GROUP, LLC
1935 ARSENAL STREET
SAINT LOUIS, MO 63118
PHONE: (314) 664-3382
HAZARDOUS MATERIALS:
ALTEC ENVIRNMENTAL CONSULTANTS, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
SAINT LOUIS, MO 63103
PHONE: (314) 862-5344 TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2012 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 000842
ENGINEERING WAREHOUSE
BUILDING
29 OCTOBER 2012
657-313F
AI401
AUTHORCHECKER
FINISH PLAN - AREA A
1/8" = 1'-0"B1AE201
F1 FINISH PLAN - AREA A
AREA A
VHASTLFLORIK
Rectangle
VHASTLFLORIK
Text Box RED = Less Than 100 Sq. Ft. and NOT ABLE to expand, relocate, or consolidate TR.
YELLOW = Less Than 100 Sq. Ft. but likely ABLE to expand, relocate, or consolidate TR.
GREEN = TR is Greater Than 100 Sq. Ft. No room dimension modification is likely necessary.
GROUNDS -
MAINT
1A 109
1000 SF
STORAGE
SECURED
1C 104c
250 SF
ELEC
1B 141
0 SF
DATA
1B 140
0 SF
GROUNDS -
MAINT /
WET RM /
WASH BAY
1A 109d
500 SF
SOILED
HOLDING
1B 138f
500 SF
LOUNGE-STAFF
1B 138c
210 SF
OFFICE,
MANAGER
1B 138d
150 SF
OFFICE
1A 109b
120 SF
RECEIVING
1B 138e
700 SF
STOR
LINEN
1B 138g
240 SF
N CORR
C1-18
0 SF
ENG DOCK
C1-11
0 SF
M LOCKER
/ TLT
1B 138b
280 SF
W LOCKER
/ TLT
1B 138a
280 SF
CLERK
1A 109c
64 SF
CORR
C1-17
0 SF
DATA
1B 139
0 SF
DISTRIBUTION
& CLEAN
HOLDING
1B 138
3200 SF
HOUSEKEEPING
AIDS
CLOSET
1B 142
80 SF
HOUSEKEEPING
AIDS CL
1A 110a
HOUSEKEEPING
AIDS
CL-CLEAN
1A 110b
CENTRAL
LIQUID
SUPPLY &
LINEN
PACK
PREP
1B 138h
ALCOVE
C1-30
GROUNDS-STOR
1A 109e
244 SF
LOUNGE
1A 109f
200 SF
GROUNDS-BENCH
1A 109a
590 SF 258
MECH
1A 110
0 SF 235
RECYCLING
1B 136
0 SF
M SHOWER
1B 138k
50 SF
W SHOWER
1B 138j
50 SF
HOUSEKEEPING
AIDS
CLOSET-CLEAN
1B 143
80 SF81
ELEC
1B 137
0 SF
P-2-3
P-2-4
SC-B-3
PT-C-1
PT-C-1
PT-C-1
PT-C-1
SC-B-1
PT-C-1
PT-C-1
SC-B-2
P-2-1
PT-C-1
P-2-1
SC-B-2
P-2-4
SC-B-3
GENERAL NOTES - FINISH PLAN
1. FOR COLOR AND MATERIAL LEGEND AND SCHEDULE OF FINISHES SEE
SPECIFICATION SECTION 09 06 00.
2. ALIGN FLOOR TILE JOINTS AS SHOWN, EVERY ONE 18" X 18" TILE TO
EVERY THREE 6" X 12" TILES. FOR MORE INFORMATION ON FINISH
MATERIALS SEE 090600 FINISH SCHEDULE
3. FOR MORE INFORMATION ABOUT ACCENT PAINT EXTENTS IN CORRIDORS
SEE INTERIOR ELEVATIONS ON SHEET AI404.
PLAN TRUE
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Revisions
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofNo.
Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e ei g h th in ch o n e fo o t
B
A
E th re e in ch es o n e fo o t o n e a n d o n e h a lf in ch es o n e fo o t o n e in ch o n e fo o t th re e q u a rt er s in ch o n e fo o t o n e h a lf in ch o n e fo o t th re e ei g h th s in ch o n e fo o t o n e q u a rt er in ch o n e fo o t
VA FORM 08-6231
5 6 87
F
D
C
94321
5 6 87 94321
B
A
E
F
D
C
JEFFERSON BARRACKS DIVISION
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
PRINTED ON ORIGINAL SIZE OF SHEET IS 30" X 42"
Department of Veterans AffairsDate
CODE CONSULTANT/FIRE PROTECTION:
CODE CONSULTANTS, INC.
2043 WOODLAND PARKWAY, SUITE 300
SAINT LOUIS, MO 63146-4235
PHONE: (314) 991-2633
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
TECHNOLOGY:
KJWW ENGINEERING CONSULTANTS
#15 SUNNEN DRIVE, SUITE 104
SAINT LOUIS, MO 63143
PHONE: (314) 645-1132
IRRIGATION CONSULTANT:
IRM
9502 BANYON TREE
ST. LOUIS, MO 63126
PHONE: (314) 610-4200
STRUCTURAL ENGINEER:
COWELL ENGINEERING
3008 SUTTON BOULEVARD
ST. LOUIS, MO 63143
PHONE: (314) 644-4002
CERTIFICATE OF AUTHORITY: 001487
MECHANICAL/ELECTRICAL/PLUMBING:
303RD ENGINEERING GROUP, LLC
1935 ARSENAL STREET
SAINT LOUIS, MO 63118
PHONE: (314) 664-3382
HAZARDOUS MATERIALS:
ALTEC ENVIRNMENTAL CONSULTANTS, INC.
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
SAINT LOUIS, MO 63103
PHONE: (314) 862-5344 TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT TO
WHICH THEY ARE AFFIXED, AND WE
EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2012 CHRISTNER INC.
CERTIFICATE OF
AUTHORITY: 000842
ENGINEERING WAREHOUSE
BUILDING
29 OCTOBER 2012
657-313F
AI402
AuthorChecker
FINISH PLAN - AREA B
1/8" = 1'-0"B1AE201
F1 FINISH PLAN - AREA B
AREA B
VHASTLFLORIK
Rectangle
VHASTLFLORIK
Text Box RED = Less Than 100 Sq. Ft. and NOT ABLE to expand, relocate, or consolidate TR.
1084 SF
MECH. RM.
1084 SF
MECH. RM.
100 SF
TOILET, FEMALE
87 SF
TOILET, MALE
119 SF
OFFICE
120B
90 SF
PRINTER RM.
118 SF
OFFICE
118 SF
OFFICE
117 SF
OFFICE
127 SF
OFFICE
120 SF
OFFICE
122 SF
OFFICE
125 SF
OFFICE
124 SF
OFFICE
125 SF
STORAGE
125 SF
OFFICE
122 SF
OFFICE
123 SF
OFFICE
116 SF
OFFICE
115 SF
OFFICE
115 SF
OFFICE
115 SF
OFFICE
115 SF
OFFICE
115 SF
OFFICE
116 SF
OFFICE
50 SF
ELEC RM.
49 SF
HAC
59 SF
TOILET, FEMALE
172 SF
TOILET, FEMALE
59 SF
TOILET, MALE
127 SF
CORRIDOR
C112
393 SF
GROUP RM.
154 SF
TOILET, MALE
66 SF
OI&T
78 SF
EQUIPMENT RM.
116 SF
OFFICE
115 SF
OFFICE
117 SF
OFFICE
117 SF
OFFICE
116 SF
OFFICE
116 SF
OFFICE
117 SF
OFFICE
118 SF
OFFICE
203 SF
STORAGE
114 SF
OFFICE
111 SF
OFFICE
163 SF
CONFERENCE
RM.
134 SF
OFFICE
132 SF
OFFICE
139 SF
OFFICE
139 SF
OFFICE
350 SF
CORRIDOR
C114
480 SF
CORRIDOR
C113
406 SF
CORRIDOR
C106
12 SF
STORAGE
CLOSET
C106.1
671 SF
GROUP RM.
269 SF
GROUP RM.
295 SF
GROUP RM.
153 291 SF
LOUNGE
12983 SF
CORRIDOR
C111
587 SF
CORRIDOR
C110
384 SF
LOBBY
C108
426 SF
CORRIDOR
C107
57 SF
CLOSET
C110.1
405 SF
WAITING
C108
FE
FAP
FAP
FEC
FAP
FAP FAP
FAP
FAP
RAD
RAD
RAD RAD RAD RAD RAD RAD RAD RAD RAD
RAD
RADRADRADRAD
RAD
RADRADRADRADRADRAD
RAD
FEC
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
580 SF
CORRIDOR
C105 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
AS-BUILT DRAWINGS
FOR JEFFERSON BARRACKS
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
FACILITIES & ENGINEERING SERVICE JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
UNITED STATES OF AMERICA
/4
/2
8:
:4
AM
58-AE-111
ARCHITECTURAL FLOOR PLAN - FLOOR
WJS
131 164WJS11/01/2019
657-19-JBAB
AS-BUILT DRAWINGS
1/8" = 1'-0"1 OVERALL FLOOR PLAN - BUILDING 58 - FLOOR 01
PLAN
NORTH
2 SOTHWEST ISOMETRIC
VHASTLFLORIK
Rectangle
VHASTLFLORIK
Text Box RED = Less Than 100 Sq. Ft. and NOT ABLE to expand, relocate, or consolidate TR.
UP
MECH. RM.
E14
ELEV.
EQUIPMENT RM.
E13
OFFICE
E15
STAIRWELL NO.
E12
TOILET
E15A
LAUNDRY RM.
E11
OIT
TOILET
E10
STAIRWELL NO.
E16
VESTIBULE
E9
CORRIDOR
E20
CLOSET
101A
GUEST RM.
TOILET
102B
TOILET
101B
GUEST RM.
CLOSET
102A
GUEST RM.
CLOSET
103A
TOILET
103B
TOILET
104B
MECH. RM.
E22
CLOSET
104A
GUEST RM.
GUEST RM.
CLOSET
105A
TOILET
105B
TOILET
106BCLOSET
106A
GUEST RM.
CORRIDOR
E21
CORRIDOR
E19
CLOSET
107A
GUEST RM.
TOILET
108B
TOILET
107B
CLOSET
108A
GUEST RM.
CLOSET
109A
GUEST RM.
TOILET
109B
TOILET
110B
MECH. RM.
E23
CORRIDOR
E18
CLOSET
110A
GUEST RM.
GUEST RM.
CLOSET
111A
TOILET
112B
TOILET
111B
GUEST RM.
CLOSET
112A
ELEVATOR NO.
E1
LIVING ROOM
E2
DINING RM.
E3
CORRIDOR
E4
STAIRWELL NO.
E5
DAY RM.
E7
KITCHEN
E8
PLAN
NORTH
FE
FE
FEC
FE FEC
FE
FEC
UP
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
AS-BUILT DRAWINGS
FOR JEFFERSON BARRACKS
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
FACILITIES & ENGINEERING SERVICE JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
UNITED STATES OF AMERICA
/4
/2
8:
:0
AM
59-AE-111
ARCHITECTURAL FLOOR PLAN - FLOOR
WJS
140 164WJS11/01/2019
657-19-JBAB
AS-BUILT DRAWINGS
1/8" = 1'-0"1 OVERALL FLOOR PLAN - BUILDING 59 - FLOOR 01
VHASTLFLORIK
Polygon
VHASTLFLORIK
Text Box RED = Less Than 100 Sq. Ft. and NOT ABLE to expand, relocate, or consolidate TR.
FD
FD
FD
FD
FD
UP
FD
Rebuild as new cooler/freezer space with new insulated interior walls and ceilng. Replace existing floor with new insulated floor. Install new lighting
Install new cleanable flooring. See finish information.2
New cooler/freezer w/ insulated wall panels, insulation, insulated door and lighting
Dishwashing equipment to be replaced with new. New equipment to be VA provided, VA installed.
See plumbing drawings for cart wash equipment information.
Replace existing hot water heater - instantaneous type and provide alternate to provide back up water heater.
Replace existing sink and cabinets. Install new handwashing sink near the existing eyewash.
Keynote Legend - Floor Plan
New 3-compartment sink . See MEP drawings13
New work counter. See detail 1/A201.15
Install 42" dock fall protection and rolling gate. Paint P-3.
See spec.
Repair existing cracked concrete.18
Area of infilled depressed Slab; See detail 1/A400 for additional information
New handwashing sink23
Install new vertical steel support from floor to structure above where portion of existing steel tube has been removed. Size to match exiting steel to be supported.
Paint to match existing steel.
New 3'-6" x 7'-0" opening with masonry load bearing frame. Provide vinyl separation strips
Infill wall @ removed door with 5/8" GWB and 3 5/8" MTL studs. Create a flush and smooth surface on both sides of infill.
New ADA accessible drinking fountain27
New prep sink; Handsink in Stainless Steel Countertop28
Install vinyl seperation strips29
Relocated meat prep sink30
Patch and repair existing flooring at removed ramp32
Relocate existing sink to new wall furring33
Fully conceal capped plumbing with casework. See also plumbing drawings. Clean and repair existing surfaces at removed walls.
Relocated hand sink including all associated accessories20
Hand washing sink with eyewash31
New lockers. VA provided, VA installed19
Locate temporary storage as shown to avoid existing switch gear.
GC to provide and install new wall hung fire extinguisher.
Verify VA requirements.
Patch finishes at removed sink.22
Rework existing stair as shown with new guardrails and handrails with 1' extensions as shown.
Extend dock at shifted stair as shown. Area of extended dock shown shaded.
Rework or replace exisitng guard rail as required to match new.
Install new floor insulation & concrete pad. See detail 6/A301.
Concrete infill at depressed slab34
New 1 1/2" steel tube guard rail @ 42" above tread nosing/finish floor. Attach to 4 x 4 x 1/4" embed plate.
Paint (P-3)
Existing Wall
New Wall New Door
Existing Door
Floor Plan Legend
New Cooler Wall Panel
Vinyl Curtain
EE
FF
GG
HH
II
JJ
1.5
1.5
2.5
2.5
N
N
O
O
P
P
Q
Q
R
R
S
S
T
T
UU
VV
WW
Cooler
Corridor
Dishwash
Nourishment
Mop
Mechanical Equipment
Room
Tray Line
Connecting Corridor
112b
Office
Corridor
Cart Storage
Cart Wash
Cooler
Freezer
Corridor
Dry Storage
Food Storage
Office
120A
Receiving
Vest.
120B
Main Kitchen
Elec Distribution
Room
Pump Pit
132C
Meat Preparation
Toilet
Toilet
Cooler
Cooler
Bake Shop
133A
Connecting Corridor
112b
A200
A200
A200
120A
Cooler
Deep Freeze
Cooler
Cooler
C -1
-1
C-111-2
C
-2
C-112-3
C -1
C -1
C -1
B
C-124
C-121A
C -1
A
33'-2"
C -1
A
B
Temporary covered access to secured temporary cold and dry storage. Provide temporary security cameras
3'-6" 8'-0"
A2014
Shared Supervisor
Office
Shared Work Area
Freezer
133N
Thaw Box
133M
/2
17'-11" 13'-11 1/2"
/2
Storage
C-133P
C -1
M
C -1
N
Align
IT
C-134
14'-5"
1'-10"
14'-1"
2'-2"
/4
Temp. Dry Storage
Temp.
Freezer
Temp.
Cooler
HOLD
6'-7"
C
A2011
G
G
A301
1'-6"
14 14
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Department of Veteran's Affairs
Medical Center Jefferson
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
220 N. College Ave Indianapolis, IN 46202
(317) 646 - 9090 Dave Haun dhaun@daengineering.com
Barracks Division
John A Jurgiel & Assoc.
123 N. Main Street St. Charles, MO 63301
Tel 636.757.3060 636.757.3064
Industrial Hygenist
Heapy Engineering 1400 W. Dorothy Lane Dayton OH 45409
Tel Matt Graham
618.529.5262
Electrical 60
3/30/2018 5:41:00 AM
A100
Overall 1st Floor Plan Renovate Nutrition Center and Food Services
1 Jefferson Barracks Dr. , Building 60 St. Louis, MO 63125
657-17-112 JB
03-29-2018 RD HT
BID DOCUMENTS
General Notes - Floor Plans
A All work shown "Not In Contract" (NIC) may be accomplished by a contractor who is not included as part of the construction agreement. The GC is to coordinate with "other" contractors performing NIC work wich impacts or relates to work which is part of the construction aggreement.
B All Partitions to be type "C" UON
C All dimensions are from column center line to face of partiiton UON under no circumstances shall any measurement be scaled from the drawings. Any measurement not given an actual number dimension should be brought to the architect's attention before proceeding.
D All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.
N
1/8" = 1'-0"1 Overall First Floor Plan all phases
C
Revisions: Date:
htaylor HT MO Seal - Sig and Date
VHASTLFLORIK
Rectangle
VHASTLFLORIK
Rectangle
VHASTLFLORIK
Rectangle
VHASTLFLORIK
Text Box RED = Less Than 100 Sq. Ft. and NOT ABLE to expand, relocate, or consolidate TR.
DN
UP
UP
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
RM.
ENTRY
H101
OFFICE
OFFICE
OFFICE
HAC
TOILET, MALE
TOILET, FEMALE
KITCHEN
ELEC. CLOSET
WORK RM.
CLASS RM.
OFFICE
OFFICE
OFFICE
CORRIDOR
H102
CORRIDOR
H104
CORRIDOR
H103
FEC
FE
FE
PLAN
NORTH
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
RM.
ENTRY
H101
OFFICE
OFFICE
OFFICE
HAC
TOILET, MALE
TOILET, FEMALE
KITCHEN
ELEC. CLOSET
WORK RM.
CLASS RM.
OFFICE
OFFICE
OFFICE
CORRIDOR
H102
CORRIDOR
H104
CORRIDOR
H103
7' - 10"
7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10"
7' - 10"
7' - 10"7' - 10"
7' - 10"7' - 10"7' - 10"7' - 10"7' - 10"7' - 10"
7' - 10"
7' - 10" 7' - 10" 7' - 10" 7' - 10"
7' - 10"
FAS
FAS
FAS
FASFAS
FAS
FAS
EM
FAS
FAS
EM
EM
FASEM
OS
7' - 10" th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
AS-BUILT DRAWINGS
FOR JEFFERSON BARRACKS
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
FACILITIES & ENGINEERING SERVICE JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
UNITED STATES OF AMERICA
/4
/2
8:
:4
AM
60T-AE-111
ARCHITECTURAL FLOOR PLAN -
CEILING PLAN - FLOOR 01
WJS
60T
155 164WJS11/01/2019
657-19-JBAB
AS-BUILT DRAWINGS
1/8" = 1'-0"1 OVERALL FLOOR PLAN - BUILDING 60T - FLOOR 01
1/8" = 1'-0"2 OVERALL CEILING PLAN - BUILDING 60T - FLOOR 01
3 ISOMETRIC - BUILDING 60T
VHASTLFLORIK
Rectangle
VHASTLFLORIK
Text Box RED = Less Than 100 Sq. Ft. and NOT ABLE to expand, relocate, or consolidate TR.
112A 112B 112C
112D
112E
113A
113B
118 119
H102
S101
H101
125 124
129 130
H104
H103
104A 104B 107A
132F
134A 134B
H103A 101A
101B
102A
104C
104D
104E
108A
112G
112F
119B
117B
114B
132A
132E
132D
132C
132B
S101A
130A
131A 131
122A
124A
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
FACILITIES & ENGINEERING SERVICES
AS-BUILT DRAWINGS FOR
JEFFERSON BARRACKS
657-19-JBABARCHITECTURAL FLOOR PLAN -
FLOOR 01
61-AE-111
1 111/17/2019 WJS WJS
AS-BUILT DRAWINGS
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
FLOOR PLAN - BUILDING 61 - FLOOR 01
SCALE: 1/8" = 1'-0"
PLAN
NORTH
UNITED STATES OF AMERICA
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VHASTLFLORIK
Rectangle
VHASTLFLORIK
Text Box RED = Less Than 100 Sq. Ft. and NOT ABLE to expand, relocate, or consolidate TR.
YELLOW = Less Than 100 Sq. Ft. but likely ABLE to expand, relocate, or consolidate TR. GREEN = TR is Greater Than 100 Sq. Ft. No room dimension modification is likely necessary.
UP
F E
C
THE HIGHLIGHTED ITEMS SHOWN ARE PHYSICAL SECURITY. THE
PROSPECTIVE OFFERER IS TO TABULATE COSTS FOR THESE ITEMS
SEPARATELY FROM THE BASE BID COSTS. COSTS FOR PHYSICAL
SECURITY ITEMS ARE NOTED AS A SEPARATE LINE ITEM ON THE
PROPOSAL FORM. SEE SPECIFICATIONS FOR A DESCRIPTION OF THE
INDIVIDUAL PHYSICAL SECURITY ITEMS.
NOTE: NOT ALL PHYSICAL SECURITY NUMBERS USED THIS PAGE
PS5
PRECAST CONCRETE WALL PANELS STEEL SUPPORT/ BRACING
REQUIRED FOR PRECAST PANELS (SEE STRUCTURAL DRAWINGS FOR
MORE DETAIL)
PS6
BLAST RESISTANT DOOR. SEE DOOR SCHEDULE/ SPECIFICATIONS
PS7
BLAST RESISTANT DOOR. SEE DOOR SCHEDULE/ SPECIFICATIONS.
PS8
PRECAST CONCRETE WALL PANELS STEEL SUPPORT/ BRACING
REQUIRED FOR PRECAST PANELS. CONCRETE FOUNDATIONS. (SEE
STRUCTURAL DRAWINGS FOR MORE DETAIL)
PS9
STEEL FRAMING/ CONCRETE FOUNDATIONS HORIZONTAL BLAST
RESISTANT DOOR MOTORS/ CONTROLLERS / WIRING TO OPERATE
HORIZONTAL BLAST RESISTANT DOOR. (SEE STRUCTURAL &
ELECTRICAL DRAWINGS FOR MORE DETAIL)
PHYSICAL SECURITY
AE202
D1
AE201
AE201
AE202
D1
F1
F1
Control Room
1B 108
300 SF
Air Lock
C1-5
0 SF
C1
AE300
F1
AE300
Men's Toilet
1B 103a
100 SF
Entry
1B 103
70 SF
Men's Lockers
1B 103b
60 SF
Women's Lockers
1B 101b
60 SF
Entry
1B 101
70 SF
Women's Toilet
1B 101a
100 SF
Recyclable Storage
1B 102
120 SF
Break Room
1B 100
225 SF
Entry Room
1B 109
150 SF
Terminal Room-B
1B 105
100 SF
Shower
1B 103c
50 SF
Shower
1B 101c
50 SF
Switchgear
1C 100
950 SF
Switchgear
1C 101
1100 SF 1221
Switchgear
1C 102
1200 SF
Areaway
1C 104
700 SF
Areaway
1C 105
700 SF
203' - 9"
Vest.
C1-1
0 SF
Corridor
C1-6
0 SF
Chiller Bay
1A 100
7000 SF
Terminal Room-A
1B 107
100 SF
Office
1B 106
150 SF
Housekeeping
1B 104
40 SF
Sound Lock
C1-4
0 SF
Corridor
C1-3
0 SF
FD
FD
FD
FD
FD
/8
FD
FD FD
FD FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD
FD
AE520
F1
Substation
SITE
2400 SF
FD
FD
FD
FD
FD
FD
FD
FD
FD
5 5
5 5
F5
AE302
AE201A1
AE401
F8
AE504
A6
AE504
C1
AE504
D1
E1
AE502
AE520
F4
Corridor
C1-2
0 SF
Generator Bay
1C 103
4000 SF
1B 100.1
1B 102
C
.4
3' - 5"
/4
6' - 0 5/16"
9' - 0 3/4" 13' - 0 11/16"
A
.4
D
.3
8' - 5" 10' - 7 7/8" 8' - 5" 15' - 4 11/16" 8' - 5" 39' - 3" 14' - 9" 1' - 0"
3' - 5" 4' - 3 1/2"
16' - 0 3/4"
MO
6' - 4"
MO
3' - 8" 19' - 2"
M O
M O
M O
M O
/1
M O
M O
M O
M O
M O
MO
3' - 4" 3' - 3"
MO
6' - 4" 20' - 1"
MO
4' - 0"
6' - 3 1/2"
M O
/8
H12d
A
.4
H12fH12f
H12f
H12d
H12f
H12dH12d
H8f
MO
7' - 0"
1' - 4"
1' - 4"
M O
M O
3' - 5" 10' - 3 1/2"
1B 106
C1 41A 100.1
1B 108
B
1B 107
1B 105
C1 5 1C 104.2
1C 104.1
C
.2
C
.3
1C 101.3
1C 105.2
1C 105.1
C
.11 A
.3
1A 101.2
C
.1 C
.2
C
C
.1
C
M O
/1
54' - 0"
1C 101.2
AE504
A1
A
.2
AE504
A3
1' - 0" 6' - 0" 16' - 0" 17' - 3" 1' - 0"
AE504
A8
AE504
C8
B
.2
1B 101.1
B
.2
A
.1
B
1B 103.1
B L
B A
B L
B
B L
B A
B L
B B
BL 1B108C
3' - 8"
MO
3' - 8"
FD
1A 100.3
/2
1110984
A
G
321 5 6 7
F
D
C
B
E
H
J
A.6
3.7
A.1
C.5
Blast_N
Blast_W
Blast_S
3' - 0" 18' - 10 7/16" 3' - 10 3/8"
8' - 0 1/16"
1' - 7 3/16"
.0
90.0°
/8
AE520 F9
8" 8"
1' - 4"
1D 100.1
1' - 9"
H12d
H12d
H12d
H12d
2' - 0"8"
H12d
H12d
H12d
H12d
1' - 0"
11.1 12.5 13.1 14.1 15.1 15.9
D.1
C.6
C.1
A.8
A.4
A.2
12 13 14 15
2' - 5"8' - 3 3/4"
Boiler Bay
1A 101
7500 SF
FD
500'-4" 500'-4" 500'-4"
500'-4"500'-8"
500'-8"
501'-0"
500'-8"
500'-8"
DEPRESSED CONC
FOR GUIDERAIL
(CROSS-HATCHED AREA)
EDGE OF GB
EDGE OF GB
AE520 F9
OPH
FUTURE EXPANSION
1D 100.2
/2
STEEL BLAST RESISTANT
ROLLING SECURITY DOOR
14 14
14 14
14 14 14 14 14 14
14 14 14
14 14 14
171717
AE502
C7 F2
AE302
A6
GENERAL PLAN NOTE:
FINAL FLOOR DRAIN LOCATIONS TO BE DETERMINED
ACCORDING TO SELECTION OF FINAL EQUIPMENT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: ENERGY PLANT & UTILITY
INFRASTRUCTURE
657-313A Office ofOffice ofOffice ofOffice of ConstructionConstructionConstructionConstruction and Facilitiesand Facilitiesand Facilitiesand Facilities ManagementManagementManagementManagement o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT
TO WHICH THEY ARE AFFIXED, AND
WE EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2012 CHRISTNER INC.
Department of Veterans Affairs118
NORTH
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD, SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
MECHANICAL/ELECTRICAL/PLUMBING:
KJWW ENGINEERING CONSULTANTS
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CODE CONSULTANT/FIRE PROTECTION:
CODE CONSULTANTS, INC.
2043 WOODLAND PARKWAY, SUITE 300
ST. LOUIS, MO 63146
PHONE: (314) 991-2633
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL CONSULTING, LLC
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
CERTIFICATE OF
AUTHORITY: 000842
4/19/2012 2:39:31 PM
FIRST FLOOR PLAN
06 JULY 2012 JDL MW
AE101
DWG 95 OF
FULLY SPRINKLERED
KEYED NOTES - PLAN
1 ALIGN
2 SLOPE FLOOR 1/4"/FT TO DRAIN
3 ACCESS LADDER - SEE F9/AE520
4 FIRE EXTINGUISHER AND BRACKET
5 PIPING TRENCH - SEE STRUCTURAL
6 GUARDRAIL - SEE DETAIL C9/AE520
7 DEPRESSED SLAB/PIT - SEE STRUCTURAL
8 16' - 0" HIGH MECHANICAL DAMPER - SILL @ 2' - 0" AFF
9 14' - 8" HIGH MECHANICAL DAMPER - SILL @ 3' - 4" AFF
10 10' - 0" HIGH MECHANICAL DAMPER - SILL @ 2' - 0" AFF
11 8" HIGH CONC CURB - SEE STRUCTURAL
12 PROVIDE STUD FURRING, THERMAL BATTS AND VAPOR
RETARDER AT FOUNDATION WALL SIM TO F1/AE303
13 LINE OF ACOUSTICAL BARRIER ABOVE
14 CONC EQUIPMENT PAD - SEE STRUCTURAL
15 OVERHANG ABOVE
16 INSIDE FLOOR ELEVATIONS & EXT SIDE WALK ELEV @
DOOR = 495'
17 INSIDE FLOOR ELEVATIONS & EXT SIDE WALK ELEV @
DOOR = 501'
18 REMOVEABLE GUARDRAIL (SIM TO C9/AE520) @ 3'-6"
AFF. ANCHOR TO WALL
19 SHEET WALL PROTECTION
20 WATERPROOFING MEMBRANE & INSULATION
DRAINAGE PANELS
PS8
PS8
1/8" = 1'-0"D1AE201
F1 FIRST FLOOR PLAN
No. Date Revisions
1 4/20/12 AMENDMENT 7
CBarton Snapshot
Kiosk Line
MTouchette Arrow
MTouchette Line
MTouchette Arrow
MTouchette Line
MTouchette Line
MTouchette Line
MTouchette Line
MTouchette Line
MTouchette Line
MTouchette Arrow
MTouchette Arrow trose Line trose Line trose Line trose Line trose Line trose Text Box 6'-3 1/2" trose Text Box 4'-0" trose Callout
RFI 0215: 2'-9 1/2"
trose Cloud trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Line trose Callout RFI 0282: See Detail 4/S-003 for blocking out drain walls and slab.
trose Rectangle trose Rectangle trose Cloud trose Cloud trose Cloud trose Line trose Line trose Line
Project RFI #: 0437-0
Date Created: 06/05/2014
Priority: Normal
Request For Information
VA Jefferson Barracks Energy Plant - Contract#VA101F-12-C-0039/Proj#657CA2313A
Tel: Fax: Project # 003792.000 Answer Required By: 06/14/2014
Submitted BySubmitted To US Department of Veterans Affairs McCarthy Building Companies, Inc.
Kareem Souka Alex Schmidt
1 Jefferson Barracks Drive Building 101-T St. Louis, MO 63125
1341 North Rock Hill Road St. Louis, MO 63124
Subject: Access Ladder Discipline: Initiated By: McCarthy - Alex Schmidt Category: Ref RFI:
Reason:
Attachments DescriptionNameType Content
File EPUI - RFI 0437 - Access Ladder RFI 0437 - Access Ladder Sketch.pdf
Question
In the fuel pit of drawing AE101, due to the amount of piping the ladder that is shown will not allow for proper access into the pit. Is it acceptable to remove and add the ladders as shown in the attached file?
Date Answered: 06/11/2014Answer
Yes, your recommendation is acceptable.
-Kareem Souka 6/11/14
Architect/Engineer Signature
By:_________________________________________________ Date:__________________
Consultant:
Page 1 of 1Printed On: 6/11/14
Project RFI #: 0437-0
Date Created: 06/05/2014
Answer Required By: 06/14/2014
Kareem Souka Alex Schmidt
Subject: Access Ladder Discipline: Initiated By: McCarthy - Alex Schmidt
File EPUI - RFI 0437 - Access Ladder RFI 0437 - Access Ladder Sketch.pdf
In the fuel pit of drawing AE101, due to the amount of piping the ladder that is shown will not allow for proper access into the pit. Is it acceptable to remove and add the ladders as shown in the attached file?
Date Answered: Answer
Page 1 of 1Printed On: 6/6/14
ASchmidt
Snapshot
Rectangle
Text Box
Added Ladders
Arrow
Text Box
Removed Ladder
File Attachment
Project RFI #: 0379-0
Date Created: 02/27/2014
Answer Required By: 03/08/2014
Kareem Souka Teresa Rose
Subject: Control Panel Mounting Locations Discipline: Initiated By: McCarthy - Teresa Rose
File Control Panel Mounting Locations Control_Panel_Mounting_Locations.pdf
Contract drawings do not indicate location for building control panels. See the attached plans with the suggested locations. Each panel is 24"W x 36"H x 8"D and will be mounted at 36 inches above finished floor. Please confirm these locations are acceptable.
Date Answered: 02/28/2014Answer
We do not take any exception to these locations as long as the panels have been coordinated within the contractors BIM model and the locations are included on the final as-suilts.
The panels require 36-inches of front clearance and should meet the other National Electrical Code Article 110 requirements for electrical installations that are 600 volts or less. Other requirements are to allow full enclosure door opening swing, have working width as width of equipment or 30-inches whichever is greater. The working space height must be to the height of the equipment or a minimum of 6-1/2 feet whichever is greater.
Kareem Souka 2/28/2014
Page 1 of 1Printed On: 2/28/14 m Department of Veterans Affairs
Request for Information#: - 0379
Project: 657-313A
Contract Number: VA101F-12-C·0039 ·Energy Plant & Utility Infrastructure
To: McCarthy Building Companies, Inc.
Urgent: N Drawing Number:
Respond by: 03/08/2014 Specification Section:
Information. Requested:
Contract drawings do not indicate location for building control panels. See the attached plans with the suggested locations. Each panel is 24"W x 36"H x 8"0 and will be mounted at 36 inches above finished floor. Please confirm these locations are acceptable.
Requested By Jason Roberts Date 02/27/2014
Reply: .. .
We not take any exception to these locations as long as the panels have been coordinated within the contractors BIM model and the locations are included on the final as-builts.
The panels require 36-inches of front clearance and should meet the other National Electrical Code Article 110 requirements for electrical installations that are 600 volts or less. Other requirements are to allow full enclosure door opening swing, have working width as width of equipment or 30-inches whichever is greater. The working space height must be to the height of the equipment or a minimum of 6-1/2 feet whichever is greater.
Any questions, please contact: Kareem Souka
RepliedBy I~ Date 02/28/2014
PARAGON Program Management System
RFI02-01-RFI Reply
Report Date: February 28, 2014
Project RFI #: 0379-0
Date Created: 02/27/2014
Answer Required By: 03/08/2014
File Control Panel Mounting Locations Control_Panel_Mounting_Locations.pdf
Contract drawings do not indicate location for building control panels. See the attached plans with the suggested locations. Each panel is 24"W x 36"H x 8"D and will be mounted at 36 inches above finished floor. Please confirm these locations are acceptable.
Page 1 of 1Printed On: 2/27/14
F E
C
THE HIGHLIGHTED ITEMS SHOWN ARE PHYSICAL SECURITY. THE
PROSPECTIVE OFFERER IS TO TABULATE COSTS FOR THESE ITEMS
SEPARATELY FROM THE BASE BID COSTS. COSTS FOR PHYSICAL
SECURITY ITEMS ARE NOTED AS A SEPARATE LINE ITEM ON THE
PROPOSAL FORM. SEE SPECIFICATIONS FOR A DESCRIPTION OF THE
INDIVIDUAL PHYSICAL SECURITY ITEMS.
NOTE: NOT ALL PHYSICAL SECURITY NUMBERS USED THIS PAGE
PS5
PRECAST CONCRETE WALL PANELS STEEL SUPPORT/ BRACING
REQUIRED FOR PRECAST PANELS (SEE STRUCTURAL DRAWINGS FOR
MORE DETAIL)
PS6
BLAST RESISTANT DOOR. SEE DOOR SCHEDULE/ SPECIFICATIONS
PS7
BLAST RESISTANT DOOR. SEE DOOR SCHEDULE/ SPECIFICATIONS.
PS8
PRECAST CONCRETE WALL PANELS STEEL SUPPORT/ BRACING
REQUIRED FOR PRECAST PANELS. CONCRETE FOUNDATIONS. (SEE
STRUCTURAL DRAWINGS FOR MORE DETAIL)
PS9
STEEL FRAMING/ CONCRETE FOUNDATIONS HORIZONTAL BLAST
RESISTANT DOOR MOTORS/ CONTROLLERS / WIRING TO OPERATE
HORIZONTAL BLAST RESISTANT DOOR. (SEE STRUCTURAL &
ELECTRICAL DRAWINGS FOR MORE DETAIL)
PHYSICAL SECURITY
AE202
D1
AE201
F1
Control Room
1B 108
300 SF
Air Lock
C1-5
0 SF
C1
AE300
Men's Toilet
1B 103a
100 SF
Entry
1B 103
70 SF
Men's Lockers
1B 103b
60 SF
Women's Lockers
1B 101b
60 SF
Entry
1B 101
70 SF
Women's Toilet
1B 101a
Recyclable Storage
1B 102
120 SF
Break Room
1B 100
225 SF
Entry Room
1B 109
150 SF
Terminal Room-B
1B 105
Shower
1B 103c
50 SF
Shower
1B 101c
50 SF
Switchgear
1C 100
950 SF
1C 101
1100 SF 1221
1C 102
1200 SF
Areaway
1C 104
700 SF
1C 105
700 SF
203' - 9"
Vest.
C1-1
Corridor
C1-6
Chiller Bay
1A 100
7000 SF
Terminal Room-A
1B 107
Office
1B 106
150 SF
Housekeeping
1B 104
40 SF
Sound Lock
C1-4
C1-3
/8
FD FD
AE520
Substation
SITE
2400 SF
5 5
5 5
F5
AE302
AE201A1
AE401
F8
AE504
A6
E1
AE502
F4
C1-2
Generator Bay
1C 103
4000 SF
1B 100.1
1B 102
.4
3' - 5"
/4
6' - 0 5/16"
9' - 0 3/4" 13' - 0 11/16"
A
D
.3
8' - 5" 10' - 7 7/8" 8' - 5" 15' - 4 11/16" 8' - 5" 39' - 3" 14' - 9" 1' - 0"
3' - 5" 4' - 3 1/2"
16' - 0 3/4"
MO
6' - 4"
3' - 8" 19' - 2"
M O
/1
3' - 4" 3' - 3"
6' - 4" 20' - 1"
4' - 0"
6' - 3 1/2"
H12d
H12fH12f
H12f
H12f
H12dH12d
H8f
7' - 0"
1' - 4"
3' - 5" 10' - 3 1/2"
1B 106
C1 41A 100.1
1B 108
B
1B 107
1B 105
C1 5 1C 104.2
1C 104.1
.2
1C 101.3
1C 105.2
1C 105.1
.11
1A 101.2
.1
/1
54' - 0"
1C 101.2
A1
A3
1' - 0" 6' - 0" 16' - 0" 17' - 3" 1' - 0"
A8
C8
1B 101.1
1B 103.1
L
BL 1B108C
3' - 8"
3' - 8"
1A 100.3
/2
1110984
G
321 5 6 7
H
J
A.6
3.7
A.1
C.5
Blast_N
Blast_W
Blast_S
3' - 0" 18' - 10 7/16" 3' - 10 3/8"
8' - 0 1/16"
1' - 7 3/16"
.0
90.0°
AE520 F9
8" 8"
1D 100.1
1' - 9"
2' - 0"8"
1' - 0"
11.1 12.5 13.1 14.1 15.1 15.9
D.1
C.6
C.1
A.8
A.4
A.2
12 13 14 15
2' - 5"8' - 3 3/4"
Boiler Bay
1A 101
7500 SF
500'-4" 500'-4" 500'-4"
500'-4"500'-8"
500'-8"
501'-0"
DEPRESSED CONC
FOR GUIDERAIL
(CROSS-HATCHED AREA)
EDGE OF GB
EDGE OF GB
AE520 F9
OPH
FUTURE EXPANSION
1D 100.2
STEEL BLAST RESISTANT
ROLLING SECURITY DOOR
14 14
14 14
14 14 14 14 14 14
14 14 14
14 14 14
171717
AE502
C7 F2
A6
GENERAL PLAN NOTE:
FINAL FLOOR DRAIN LOCATIONS TO BE DETERMINED
ACCORDING TO SELECTION OF FINAL EQUIPMENT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: ENERGY PLANT & UTILITY
INFRASTRUCTURE
657-313A Office ofOffice ofOffice ofOffice of ConstructionConstructionConstructionConstruction and Facilitiesand Facilitiesand Facilitiesand Facilities ManagementManagementManagementManagement o n e e ig h o n fo t 1 re c h e s o n t e a n d o n e h a lf in c h e s o n e in c h o n q u a rt h o n e h a lf in c h o n ig s c h o n e q u a rt r h o n
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT
TO WHICH THEY ARE AFFIXED, AND
WE EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2012 CHRISTNER INC.
Department of Veterans Affairs118
NORTH
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD, SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
MECHANICAL/ELECTRICAL/PLUMBING:
KJWW ENGINEERING CONSULTANTS
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CODE CONSULTANT/FIRE PROTECTION:
CODE CONSULTANTS, INC.
2043 WOODLAND PARKWAY, SUITE 300
ST. LOUIS, MO 63146
PHONE: (314) 991-2633
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL CONSULTING, LLC
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
CERTIFICATE OF
AUTHORITY: 000842
4/19/2012 2:39:31 PM
FIRST FLOOR PLAN
06 JULY 2012 JDL MW
AE101
DWG 95 OF
FULLY SPRINKLERED
KEYED NOTES - PLAN
1 ALIGN
2 SLOPE FLOOR 1/4"/FT TO DRAIN
3 ACCESS LADDER - SEE F9/AE520
4 FIRE EXTINGUISHER AND BRACKET
5 PIPING TRENCH - SEE STRUCTURAL
6 GUARDRAIL - SEE DETAIL C9/AE520
7 DEPRESSED SLAB/PIT - SEE STRUCTURAL
8 16' - 0" HIGH MECHANICAL DAMPER - SILL @ 2' - 0" AFF
9 14' - 8" HIGH MECHANICAL DAMPER - SILL @ 3' - 4" AFF
10 10' - 0" HIGH MECHANICAL DAMPER - SILL @ 2' - 0" AFF
11 8" HIGH CONC CURB - SEE STRUCTURAL
12 PROVIDE STUD FURRING, THERMAL BATTS AND VAPOR
RETARDER AT FOUNDATION WALL SIM TO F1/AE303
13 LINE OF ACOUSTICAL BARRIER ABOVE
14 CONC EQUIPMENT PAD - SEE STRUCTURAL
15 OVERHANG ABOVE
16 INSIDE FLOOR ELEVATIONS & EXT SIDE WALK ELEV @
DOOR = 495'
17 INSIDE FLOOR ELEVATIONS & EXT SIDE WALK ELEV @
DOOR = 501'
18 REMOVEABLE GUARDRAIL (SIM TO C9/AE520) @ 3'-6"
AFF. ANCHOR TO WALL
19 SHEET WALL PROTECTION
20 WATERPROOFING MEMBRANE & INSULATION
DRAINAGE PANELS
1/8" = 1'-0"D1AE201
F1 FIRST FLOOR PLAN
No. Date Revisions
1 4/20/12 AMENDMENT 7
Cloud
Callout
Chiller and Cooling Tower Control Panels (Typ. 4)
Boiler HHW Panels (Typ. 2)
RO System Panel (Typ. 1)
Generator Panel (Typ. 1)
AE201E6
(OPEN TO BELOW)
(OPEN TO BELOW)
(OPEN TO BELOW) (OPEN TO BELOW)
(CHILLER BAY ROOF - SEE F1/AE103)
(OPEN TO
BELOW)
INACCESSIBLE AREA OF
FUTURE EXPANSION
GUARDRAIL - SEE DETAIL C9/AE520
AE102
AE201A1
AE303
C6
F6
E8
Lower Mezzanine
2B 100
1650 SF
Upper Mezzanine
2C 100
450 SF
F3
AE540
C5
AE540
1110984
321 5 6 7
3.7
C.5
Blast_N
Blast_W
ROOF - SEE F1/AE103
1' - 4 5/8" 8" 8"
11"
8" 8"
G6f
F7
AE503
Generator Bay
SwitchgearSwitchgear
Boiler Bay
1 HR RATED
ENCLOSURE
ABOVE AT
ROOF
(PROVIDE GYP BD ACOUSTICAL
BARRIER ON BOTTOM OF STL
BEAMS. SEE C7/AE540) F7
1' - 0"
BELOW @
511' ELEV.
11.1 12.5 13.1 14.1 15.1 15.9
D.1
C.6
C.1
A.8
A.4
A.2
12 13 14 15
507'-0"
519'-3"
514'-0"
C3
LEDGE ABOVE
LEDGE ABOVE
SEALANT
AROUND
JOINT
AE501
2' - 0" 4' - 2"
3' - 6"
Battery
2C 101
2' - 0"
M.O.
6' - 4"
H8d
H8d
8' - 5" 3' - 8 13/16"
AE611
1 HR RATED ENCLOSURE
ABOVE AT ROOF TO
ENCLOSE MECH. DUCTS
AE503 SIM
C4
AE611
CATWALK
SEE
STRUCTURAL
8' - 2 1/2" 1' - 9 7/16"
2' - 9 7/16"
A9
C9
A9
2' - 8"
SIM
V
R T
IC
S
U P
LADDER
WITH CAGE
LOUVER
5 6
V
IC
U
THE HIGHLIGHTED ITEMS SHOWN ARE PHYSICAL SECURITY. THE PROSPECTIVE OFFERER
IS TO TABULATE COSTS FOR THESE ITEMS SEPARATELY FROM THE BASE BID COSTS.
COSTS FOR PHYSICAL SECURITY ITEMS ARE NOTED AS A SEPARATE LINE ITEM ON THE
PROPOSAL FORM. SEE SPECIFICATIONS FOR A DESCRIPTION OF THE INDIVIDUAL
PHYSICAL SECURITY ITEMS.
NOTE: NOT ALL PHYSICAL SECURITY NUMBERS USED THIS PAGE
PRECAST CONCRETE WALL PANELS / STEEL SUPPORT AND BRACING REQUIRED FOR
PRECAST PANELS (SEE STRUCTURAL DRAWINGS FOR MORE DETAIL)
PRECAST CONCRETE WALL PANELS AND STEEL SUPPORT AND BRACING REQUIRED FOR
PRECAST PANELS. CONCRETE FOUNDATIONS. (SEE STRUCTURAL DRAWINGS FOR MORE
DETAIL)
STEEL FRAMING / CONCRETE FOUNDATIONS / HORIZONTAL BLAST RESISTANT ROLLING
GATE / MOTORS / CONTROLLERS / WIRING TO OPERATE HORIZONTAL BLAST RESISTANT
DOOR. (SEE STRUCTURAL & ELECTRICAL DRAWINGS FOR MORE DETAIL)
PHYSICAL SECURITY
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
JEFFERSON BARRACKS DIVISION
ARCHITECT: ENERGY PLANT & UTILITY
INFRASTRUCTURE
657-313A Office ofOffice ofOffice ofOffice of ConstructionConstructionConstructionConstruction and Facilitiesand Facilitiesand Facilitiesand Facilities ManagementManagementManagementManagement e e ig h o n t 1 c h e s o n e a n d o n e h a lf in c h e s o n e in c h o n q u a rt h o n e h a lf in c h o n ig s c h o n e q u a rt r h o n
VA FORM 08-6231 PRINT DATE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
1 2 3 4 5 6 87 9
97 8654321
TEL 314 725 2927 | FAX 314 725 2928 | CHRISTNERINC.COM
168 N. MERAMEC AVENUE | ST. LOUIS, MISSOURI 63105
ARCHITECTS | DESIGNERS | PLANNERS | LANDSCAPE ARCHITECTS
THE SEAL(S) AND SIGNATURE(S)
APPLY ONLY TO THE DOCUMENT
TO WHICH THEY ARE AFFIXED, AND
WE EXPRESSLY DISCLAIM ANY
RESPONSIBILITY FOR ALL OTHER
PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER
DOCUMENTS OR INSTRUMENTS
RELATING TO OR INTENDED TO BE
USED FOR ANY PART OF PARTS OF
THE PROJECT.
© COPYRIGHT 2012 CHRISTNER INC.
Department of Veterans Affairs118
NORTH
STRUCTURAL ENGINEER:
KPFF CONSULTING ENGINEERS
1630 DES PERES ROAD, SUITE 100
ST. LOUIS, MO 63131
PHONE: (314) 835-0524
MECHANICAL/ELECTRICAL/PLUMBING:
KJWW ENGINEERING CONSULTANTS
#15 SUNNEN DRIVE, SUITE 104
ST. LOUIS, MO 63143
PHONE: (314) 645-1132
CODE CONSULTANT/FIRE PROTECTION:
CODE CONSULTANTS, INC.
2043 WOODLAND PARKWAY, SUITE 300
ST. LOUIS, MO 63146
PHONE: (314) 991-2633
CIVIL ENGINEER:
STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
257 CHESTERFIELD BUSINESS PARKWAY
CHESTERFIELD, MO 63005
PHONE: (636) 530-9100
ESTIMATING:
KWAME BUILDING GROUP, INC.
1204 WASHINGTON AVENUE, SUITE 200
ST. LOUIS, MO 63103
PHONE: (314) 862 5344
HAZARDOUS MATERIALS:
ALTEC ENVIRONMENTAL CONSULTING, LLC
P.O. BOX 17867
SHREVEPORT, LA 71138-0867
PHONE: (318) 687-3771
CERTIFICATE OF
AUTHORITY: 000842
4/19/2012 2:40:23 PM
MEZZANINE PLAN
06 JULY 2012 JDL MW
AE102
DWG 96 OF
FULLY SPRINKLERED
KEYED NOTES - PLAN
1 ALIGN
2 SLOPE FLOOR 1/4"/FT TO DRAIN
3 ACCESS LADDER - SEE F9/AE520
4 FIRE EXTINGUISHER AND BRACKET
5 PIPING TRENCH - SEE STRUCTURAL
6 GUARDRAIL - SEE DETAIL C9/AE520
7 DEPRESSED SLAB/PIT - SEE STRUCTURAL
8 16' - 0" HIGH MECHANICAL DAMPER - SILL @ 2' - 0" AFF
9 14' - 8" HIGH MECHANICAL DAMPER - SILL @ 3' - 4" AFF
10 10' - 0" HIGH MECHANICAL DAMPER - SILL @ 2' - 0" AFF
11 8" HIGH CONC CURB - SEE STRUCTURAL
12 PROVIDE STUD FURRING, THERMAL BATTS AND VAPOR
RETARDER AT FOUNDATION WALL SIM TO F1/AE303
13 LINE OF ACOUSTICAL BARRIER ABOVE
14 CONC EQUIPMENT PAD - SEE STRUCTURAL
15 OVERHANG ABOVE
16 INSIDE FLOOR ELEVATIONS & EXT SIDE WALK ELEV @
DOOR = 495'
17 INSIDE FLOOR ELEVATIONS & EXT SIDE WALK ELEV @
DOOR = 501'
18 REMOVEABLE GUARDRAIL (SIM TO C9/AE520) @ 3'-6"
AFF. ANCHOR TO WALL
19 SHEET WALL PROTECTION
20 WATERPROOFING MEMBRANE & INSULATION
DRAINAGE PANELS
1/8" = 1'-0"
UPPER MEZZANINE (521' elevation)
1/8" = 1'-0"E1AE102
F1 LOWER MEZZANINE CURTAIN WALL (511' elevation)
E9
EAST AREAWAY ( 532'-8" elevation)
WEST AREAWAY (532'-8" elevation)
LOUVER
LADDER
WITH CAGE
No. Date Revisions
1 4/18/12 AMENDMENT 6
2 4/20/12 AMENDMENT 7
MAU Panel (Typ. 1)
AHU-1 Panel (Typ. 1)
AHU-2 Panel (Typ. 1)
AHU-3 Panel (Typ. 1)
Project RFI #: 0215-1
Date Created: 05/29/2013
Answer Required By: 06/07/2013
Kareem Souka Matt Touchette
Subject: Steps in foundation wall dimension clarification Discipline: Initiated By: McCarthy - Matt TouchetteStructural
ClarificationReason:
File EPUI - RFI 0215 - Steps in foundation wall dimension clarification.pdf
EPUI_-_RFI_0215_-
_Steps_in_foundation_wall_dimension_clarification.pd f
Please refer to the attached sketches, Volume 1 drawing AE201 detail D1 for the south elevation, and Volume 1 AE202 detail D1 for the north elevation. Please clarify the dimensions of the steps in the foundation wall off of column lines for the south and north elevations.
Date Answered: 05/29/2013Answer
Dimensions shown on AE202 are to center line of joint. Precast wall edge is to line up with edge of concrete foundation wall allowing the 3/4" joint to be continuous where the adjacent precast wall runs down past the horizontal joint of the concrete foundation wall and precast wall above. Coordinate foundation wall and precast wall to ensure that joints line up as described.
See dimensional mark ups and notes with PDFs attached.
Please review previously issued SI 0004 (RFP D-011) as it directly relates to this RFI.
Kareem Souka 05/29/2013
Page 1 of 1Printed On: 5/29/13
KPFF: Arch to verify and GC to coordinate(CHRISTNER) COORDINATE ALL
CURTAIN WALL OPENINGS WITH
CURTIAN WALL SUPPLIER
COORDINATE ALL DOOR OPENINGS
WITH DOOR SUPPLIER
Please clarify the dimension from the step in the foundation wall to the column lines
AE301
10' - 3
10' - 4 3/4"7' - 10 9/16"9/16"
1'
2'
2'
Q
EQ
(CI 5/13/13) EDGE
OF FDTN WALL
F3
AE500
C8
4 5
TT
Q 38
EQ EQ
RETAINING WALL - SEE CIVIL
2' - 6"
1'
(CI 5/13/13) This is dimensioned on floor plan sheet AE101
(CI 5/16/13)
OK (CI 5/16/13) YES,
THEY SHOULD
ALIGN
1'-6 1/2"
(CI 5/16/13) SUPPLIMENTAL INFORMATION TO RFI # 215
11'-11 1/4"
6'-4 1/4"
3'-3 1/2"
3'-0 3/4"
(CI 5/16/13) SEE SI
#004 ISSUED ON
2/13/13
ATTATCHED AS
LAST (4) SHEETS
OF THIS PDF FOR
REFERENCE
(CI 5/16/13) 1'-0" OFF
OF COL LINE 6 PER
SI #004.
COORDINATE WITH
PRECAST SUPPLIER
FOR CONNECTIONS
AND EMBEDMENTS
1'-6 1/2"
YES
4'-0"
6'-3 1/2"
(CI 5/28/13) THIS
DIMENSION IS TO THE
ALUMINIUM CURTAIN
WALL, SUBRTRACT +/-
3/4" FOR SEALANT
JOINT.
(CI 5/16/13)
WRONG, SEE RFI
#154 FOR NEW
LOCATION OF
DOOR
11'-10 1/4"
SEE SI #004 FOR
DETAIL HERE
YES
2'-9 1/2"
Project RFI #: 0392-0
Date Created: 03/31/2014
Answer Required By: 04/09/2014
Subject: Future Generator Exhaust Damper
Drawing AE 101 Note 10 calls for a 10' high mechanical damper for the future generator exhaust, and states to "see mechanical drawings". There is no reference to a future generator damper on the mechanical or electrical drawings, and is not called out on the damper schedule. Please advise if a motorized damper is required.
Suggestion
Infill opening with metal studs and cover with sheet metal.
Date Answered: 04/10/2014Answer
A motorized damper is not required, infill the opening with 6” metal studs and cover both sides with 16 gauge galvanized sheet metal, wall to be flush with generator side of the opening.
Kareem Souka 4/10/2014
Page 1 of 1Printed On: 4/14/14
Rose, Teresa
From: Souka, Kareem (CFM) <Kareem.Souka@va.gov>
Sent: Thursday, April 10, 2014 9:52 AM
To: Rose, Teresa
Cc: Miller, Christopher J; Koonce, Michelle L. (STL); Brown, William (Cabot) (CFM); Roberts, Jason; Linda Lenceski
Subject: RE: EPUI - RFI 0392 - Future Generator Exhaust Damper
Follow Up Flag: Follow up
Flag Status: Flagged
Jason, Our response to RFI-392 is as follows:
A motorized damper is not required, infill the opening with 6” metal studs and cover both sides with 16 gauge galvanized sheet metal, wall to be flush with generator side of the opening.
Let me know If you have any questions.
Kareem Souka
Senior Resident Engineer
314-894-6108 (o)
202-341-4136 (c)
From: Rose, Teresa [mailto:TRose@mccarthy.com]
Sent: Monday, March 31, 2014 10:04 AM
To: Souka, Kareem (CFM); Koonce, Michelle L. (STL); Brown, William (Cabot) (CFM)
Cc: Miller, Christopher J
Subject: [EXTERNAL] EPUI - RFI 0392 - Future Generator Exhaust Damper
Kareem, Please see the attached RFI 0392 regarding the exhaust damper for the future generator.
Thank you, Teresa Rose Project Engineer
McCarthy Building Companies, Inc.
VAJB Energy Plant & Utility Infrastructure #3792
1 Jefferson Barracks Dr. | St. Louis, MO 63125 314-714-4378 x49107 mccarthy.com
LinkedIn | Twitter | Facebook | YouTube
150 Years – And We’re Just Getting Started.
Project RFI #: 0392-0
Date Created: 03/31/2014
Answer Required By: 04/09/2014
Subject: Future Generator Exhaust Damper
Drawing AE 101 Note 10 calls for a 10' high mechanical damper for the future generator exhaust, and states to "see mechanical drawings". There is no reference to a future generator damper on the mechanical or electrical drawings, and is not called out on the damper schedule. Please advise if a motorized damper is required.
Infill opening with metal studs and cover with sheet…