SOW Attachment 03 - SOCAMES 6 Design Alert 1.pdf

PDF 124 KB Posted

Attached to
C1DA--EHRM Infrastructure Upgrade - St. Louis 657-21-709JB - New Data Center Tier2 Design - Jefferson Barracks
Solicitation number
36C77622R0032
Issued by

About this file

This document provides details for a federal contract opportunity to design an infrastructure upgrade project for the Veterans Affairs Saint Louis Health Care System. The project involves designing upgrades to the EHRM infrastructure including a new Tier 2 data center. The solicitation number is 36C77622R0032 and the project is set aside for Service-Disabled Veteran-Owned Small Businesses. The required services include developing construction documents, drawings, specifications, reports and providing construction period services. The period of performance for design is 365 calendar days from notice to proceed and the construction budget is between $10-20 million. Firms must submit an SF 330 by January 11, 2023 highlighting their experience designing network infrastructure projects, qualifications of staff licensed in required disciplines including architecture and engineering, capacity to complete the work on schedule, and past performance references for relevant projects. The selection criteria prioritize experience with IT systems design and infrastructure upgrades.

View the file

Other files

File Type Posted
36C77622R0032 0002.pdf PDF
Attachment 14 - Design Alerts.pdf PDF
Attachment 2 - OEHRM Site Infrastructure Requirements - 2.0.pdf PDF
Attachment 13 Questions and Answers 1.6.23.pdf PDF
Statement of Work 1.6.23 .pdf PDF
SOW Attachment 10 - Jefferson Barracks Campus Map.pdf PDF
SOW Attachment 11 - Hazmat Information _ Jefferson Barracks _ Building 1 P1.pdf PDF
SOW Attachment 09 - Jefferson Barracks - EHRM Building Plans_Part1.pdf PDF
SOW_PDF.pdf PDF
SOW Attachment 07 - VHA Directive 1013 Seasonal Influenza with Vaccines.pdf PDF
SOW Attachment 09 - Jefferson Barracks - EHRM Building Plans_Part2.pdf PDF
SOW Attachment 12 _ Hazmat Information _ Jefferson Barracks _ Building 5.pdf PDF
SOW Attachment 01 - VHA Required Div 01 Spec Sections.pdf PDF
36C77622R0032_1.docx DOCX document
SOW Attachment 02 - VA OEHRM Site Infrastructure Requirements - 1-8.pdf PDF
SOW Attachment 05 - EHRM Arch and Eng CPM Schedule Spec.pdf PDF
SOW Attachment 04 - Sensitive Infrastructure Data Classification Memo.pdf PDF
PPQ - EHRM St. Louis.docx DOCX document
SOW Attachment 08 - VHA Directive 1061.pdf PDF
SOW Attachment 06 - PG 18-15 AE Submission Reqts Vol C.pdf PDF
SOW Attachment 11 _ Hazmat Information _ Jefferson Barracks _ Buildi (1) P2.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HEFP/10NA5G/29APR20

SOCAMES 6 Design Alert 1

Problem

During a recent construction activity of cable upgrades to an existing telecommunication room (TR) at an Initial Operating Capability (IOC) site, it was discovered during cable testing procedures that some of the cables being upgraded were greater in length to the end user device than standards allows.

Background

ANSI/TIA-568.D, “Balanced Twisted-Pair Telecommunications Cabling and Components” (Sep 2018) version of industry standards for telecommunication room fixed cabling installation, limits the total length of a network Unshielded Twisted Pair (UTP) cable segment to 100 meters. The 100 meters is broken down as 10 meters for patch cables and 90 meters for total fixed cabling. Cable length requires a three-dimensional assessment to ensure that the fixed cables being installed do not exceed the specified UTP cable segment of 90 meters of fixed cable length.

There are several scenarios that require an assessment to occur to ensure that a telecommunication rooms UTP cable segments do not exceed 90 meters.

Scenario 1: The installation of a new telecommunication room to serve an area.

Scenario 2: The relocation of an existing telecommunication room to serve an area.

Scenario 3: The installation of new cabling upgrades in a telecommunication room that will remain in place to serve an area.

Scenario 4: An existing telecommunication room that will not receive any cabling upgrades.

Solution

To ensure that an assessment is performed for each of the four telecommunication room scenarios listed above, our office in conjunction with the SD-DCIE team is providing a recommended three-dimensional estimation approach that can be shared with your respective facility leads and design team to verify all telecommunication rooms do not exceed the specified UTP cable segment of 90 meters.

Step 1: Ensure you have an accurate floor plan that depicts the locations of the telecommunication rooms serving the facility.

Step 2: Utilizing AutoCAD or rule, center on the location of the telecommunication room being assessed.

From the center of the room project out lines, 80 meters in length from that point, in the plan north, south, east and west respectively.

Step 3: At the end each of the 80 meters lines created, connect a line 45 degrees from that point out to the next end point creating a diamond.

Step 4: Validate that all areas served by that telecommunication room fall within the parameters of the diamond overlay.

HEFP/10NA5G/29APR20

Step 5: If the area served by that telecommunication room is within the diamond overlay then the distance, as provided by the estimation tool, is adequate for that telecommunication room.

Step 6: If the area served by that telecommunication room is outside the diamond overlay then the distance, as provided by the estimation tool, is inadequate for that telecommunication room and further investigation is required by electronically testing the cable lengths to see if they pass or physical measurement. Any UTP cabling that does not pass testing protocols and is too long will need to have further design considerations to remedy the distance issue.

Notes

Since it is necessary to account for vertical cable distance, installation of slack for bypassing obstructions, cable management, bend radii and other in-situ obstacles 80 meters is utilized instead of the 90 meters acceptable length. This is to provide a realistic estimation of coverage of the representative telecommunication room.

This estimation tool is a recommended approach to validate fixed cable lengths meet the standards.

Designers and installers remain responsible for ensuring actual cable distances do not exceed the limits in the standards.

Below is a diagram of an example demonstrating the use of the estimation tool.