SOW Attachment 01 - VHA Required Div 01 Spec Sections.pdf
PDF 108 KB Posted
- Solicitation number
- 36C77622R0032
About this file
This document provides details for an Architect-Engineer services solicitation for an EHRM Infrastructure Upgrade project located at the Veterans Affairs Saint Louis Health Care System facility. The solicitation seeks Statements of Qualifications from SDVOSB firms by January 11, 2023 to complete design and construction period services for a new data center project with a projected construction value between $10-20 million. Interested firms must have specialized experience designing IT and network infrastructure upgrades, with relevant past performance references and qualified staff in architecture, engineering, and project management. The selected firm will provide full design services and construction period support on a firm-fixed price contract with a 365-day period of performance beginning after notice to proceed on or before March 2023.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements