SOW Attachment 01 - VHA Required Div 01 Spec Sections.pdf

PDF 106 KB Posted

Attached to
C1BG-- 542-22-700 EHRM Infrastructure Upgrades Design Coatesville, PA VAMC (VA-22-00028428)
Solicitation number
36C77622R0072
Issued by

About this file

This document provides details for a federal contract opportunity to provide Architect-Engineer (A-E) design services for infrastructure upgrades at the Coatesville Veterans Affairs Medical Center in Coatesville, Pennsylvania. The scope of work involves upgrading existing facilities to support a new Electronic Health Record Modernization system and includes potential work in over 30 buildings. Interested firms must submit SF 330 qualifications packages by May 13, 2022 to be considered, with selection based on specialized experience, past performance, professional qualifications, capacity, and approach to construction period services. A 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, the fixed price design contract is expected to be awarded by August 16, 2022 for a 365-day period of performance.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 – Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 – Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 – Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 – Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 – General Commissioning Requirements

File details come from the government source that posted it. Updated .