SOW Attachment 01 - Required Div 01 Spec Sections.pdf

PDF 688 KB Posted

Attached to
C1DA--Copy of AE-NRM-687-26-100 Modernize Physical/Electronic Security Systems
Solicitation number
36C26026Q0147
Issued by

About this file

This document is a list of VHA (Veterans Health Administration) Required Division 01 General Requirement Specification Sections for a construction or design project. The specifications cover a comprehensive range of project management and quality control requirements, including general requirements, project schedules, shop drawings, safety requirements, reference standards, quality control, testing laboratory services, environmental controls, construction waste management, sustainable construction requirements, and commissioning requirements.

The document notes that it is the responsibility of the A-E (Architect-Engineer) to determine if additional specifications are needed beyond those listed. Site-specific required specifications are available through wbdg.org, and the document includes two additional sections for closeout submittals and operation and maintenance data. The document is marked as a DRAFT, indicating it is a preliminary version of the specification requirements.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

Site specific required Division 01 specifications (available for wbdg.org)

01 78 00 Closeout Submittals

01 78 23 Operation and maintenance Data

DRAFT

File details come from the government source that posted it. Updated .