SOW Attach 7_Photographs - B-77H Split System HP-3 Replacement.docx

DOCX document 2 MB Posted

Attached to
Bldg 77H Split System HP-3 Replacement, NSWCPD Federal contract opportunity
Solicitation number
N6449821Q0195
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Bldg 77H Split System HP-3 Replacement, NSWCPD, newest first.
File Type Posted
N64498-21-Q-0195 Amendment 0001.pdf PDF
SOW Attach 9_Sketch 1 -- Bldg 77H Split System HP-3.pdf PDF
Attach 10_ Construction Cost Breakdown.xlsx XLSX spreadsheet
N64498-21-Q-0195.pdf PDF
SOW Attach 5_AHA Form.docx DOCX document
SOW Attach 4_Mobile Equipment Check List.pdf PDF
SOW Attach 6_NSWCPD ENTRY SCREENING ASSESSMENT 26 APR 2021 Rev 10.pdf PDF
SOW Attach 1_SiteMap PNBC.pdf PDF
SOW Attach 2_Contractor Production Report Form.doc DOC document
SOW Attach 3_Contractor Lift Plan Form.pdf PDF
SOW Attach 8_Instrumentation Drawings - Split HP-3 DDC Schematic.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHOTO 1 – Existing Split System HP-3 Air Handing Unit.

PHOTO 2 – Existing Split System HP-3 Air Handing Unit.

PHOTO 3 – Existing Split System HP-3 Air Handing Unit.
PHOTO 4 – Existing Split System HP-3 Air Handing Unit equipment information.
PHOTO 5 – Existing Split System HP-3 Air Handing Unit.
PHOTO 6 – Existing Split System HP-3 Air Handing Unit – General Drains and Refrigerant Lines.
PHOTO 7 – Existing Split System HP-3 Air Handing Unit -- General Drains and Refrigerant Lines.
PHOTO 8 – New Location for Outside Air Inlet Duct.
PHOTO 9 – New Location for Outside Air Inlet Duct.
PHOTO 10 – Location of Existing Split System HP-3 Condenser.
PHOTO 11 – Existing Split System HP-3 Condenser.
PHOTO 12 – Existing Split System HP-3 Condenser.

PHOTO 13 – Existing Split System HP-3 Condenser – Refrigerant and Power lines.

PHOTO 14 – Typical Wall penetrations – Note all penetrations through building are sealed.

PHOTO 15 – General – Existing Stair case to Split System HP-3.
PHOTO 16 – General – Existing Inlet Air Duct Design – Split System #6 – For reference only.
PHOTO 17 – General -- Existing Inlet Air Duct Layout – Split System #6 – For reference only.
PHOTO 18 – General -- Existing Inlet Air Duct Layout – Split System #6 – For reference only.

BUILDING 77H SPLIT SYSTEM HP-3 REPLACEMENT

SOW ATTACHMENT 7

PHOTOGRAPHS

Sheet 5 of 5 image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .