SOW_ASR-9 Beacon Cable Kit_062026.pdf

PDF 112 KB Posted

Attached to
AC-26-03745 - ASR-9 Beacon Cable Kit
Solicitation number
AC-26-03745-ASR-9_Beacon_Cable_Kit
Issued by

About this file

This Statement of Work describes the Federal Aviation Administration's procurement of ASR-9 Beacon Cable Replacement Kits to support modifications to Air Traffic Control Beacon Interrogator (ATCBI-5) configurations at ASR-9 facilities as part of the Brand-New Air Traffic Control System implementation under the Radar System Replacement Program. The kits will replace existing beacon cables to convert rotary joints to a Mode Select Beacon System (Mode-S) configuration, enabling integration with the RSR architecture. The contractor must provide all labor, facilities, equipment, and materials to fabricate the kits according to a detailed parts list provided in Attachment 1.

The procurement is structured in two Contract Line Item Numbers: CLIN 001 requires delivery of one first article unit within ninety (90) days after receipt of order, followed by FAA visual inspection and a thirty-day approval or rejection period. CLIN 002 is an option to purchase up to nineteen (19) production units, with delivery required no later than one hundred eighty (180) days after notification of first article approval. All kits must be preserved, packaged, and packed in accordance with Provision 61. The Contracting Officer's Representative is Brandon Brumley, AJW-L910, Radar Technical and Program Support Branch.

View the file

Other files

File Type Posted
Attachment 1 - Parts List.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Procurement of ASR-9 Beacon Cable Replacement Kit

1. BACKGROUND

The Federal Aviation Administration (FAA) has identified a requirement to procure conversion kits to support modifications to the Air Traffic Control Beacon Interrogator (ATCBI-5) configuration at Airport Surveillance Radar Model 9 (ASR-9) facilities as part of the Brand-New Air Traffic Control System (BNATCS) implementation under the Radar System Replacement (RSR) Program.

The rotary joints currently installed at ASR-9/ATCBI-5 sites do not provide the number of signal paths required to support integration with the RSR architecture. To achieve compatibility, the existing rotary joints must be converted to the configuration utilized at ASR-9 sites equipped with the Mode Select Beacon System (Mode-S). This conversion requires the installation of a kit developed by AJW-1433, which replaces the existing beacon cables.

2. CONTRACTING OFFICER’S REPRESENTATIVE (COR):

The COR formally designated this responsibility by the Contracting Officer to provide direction and Government oversight to the contractor on matters related to this contract. The COR is:

Brandon Brumley AJW-L910, Radar Technical and Program Support Branch

3. SCOPE OF WORK

The contractor must furnish all labor, facilities, equipment, and materials to fabricate a kit as outlined in each section that follows.

A. CLIN 001 – One (1) First Article Unit B. CLIN 002 – Option to purchase up to nineteen (19) Production Units after first article approval

4. REQUIREMENTS

4.1 Design, Construction, and Testing

The contractor shall procure and package the parts listed in Attachment 1 – Parts List into a Kit.

4.2 First Article Unit Delivery

Contractor must deliver one verification unit. Delivery shall occur no later than (NLT) ninety (90) days at receipt of order

(ARO).

4.3 Verification Unit Analysis

Upon receipt of first article unit, FAA shall perform visual inspection to determine conformance to Attachment 1 – Parts List. FAA will have 30 days to accept or reject first articles.

4.4 Production Units

Once approval is provided for the first article unit, the contractor shall be considered an approved source of production units. The number of units for production is nineteen (19). Delivery of production units shall occur NLT 180 days after notification of First Article Approval.

5. PREPARATION FOR DELIVERY

5.1 Preservation, Packaging, and Packing

Preservation, packaging, and packing shall be IAW Provision 61.