SOW Alcade 107 Interior and exterior Tile_ paving revamp.pdf

PDF 281 KB Posted

Attached to
Expression of interest – PR14933732 for Int/Ext Tiling/Residential painting at 107 Alcade str, Lynnwood Glen, Pretoria
Solicitation number
PR14933732
Issued by

About this file

This document is a Statement of Work (SOW) for a contract opportunity to perform interior and exterior tile and paving revamp work at the U.S. Embassy residence located at 107 Alcade Street, Pretoria, South Africa.

The SOW details the required tasks, which include removing and replacing interior and exterior floor tiles, performing paving repairs, and completing associated preparatory work. Specific requirements include stripping and removing existing tiles, cleaning floor surfaces, installing new tiles with appropriate spacing and grout, repairing concrete and paving as needed, and pressure washing exterior surfaces. The contractor is also required to provide a project plan, safety plan, and warranty information. The project duration is estimated to be 5 weeks. Interested contractors must submit a proposal with details on tasks, timelines, and pricing. A site visit has already been conducted. This SOW is related to a pre-solicitation for the U.S. Embassy Pretoria for interior and exterior tiling and residential painting work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR SIGNATURE___________________________________________________________

US Embassy Statement of Work – GOP Residential, Preparing residence for Occupation.

Interior and exterior- Tile & paving revamp.

Alcade 107

P a g e 1 | 6

Embassy of the United States of America

Pretoria, South Africa.

STATEMENT of WORK

Maintenance and repair.

Project: Interior and exterior- Tile & paving revamp.

Interior and exterior- Tile & paving revamp.

Alcade 107

P a g e 2 | 6

Project title: Alcade 107- Interior and exterior- Tile & paving revamp.

1. General

(a) Work Required: The work required under this contract consists of furnishing all professional services, labor, materials, equipment, required insurance, permits, and any other items, accessories, and services necessary to complete the maintenance bid documents specified herein. All work shall be in accordance with this statement of work, available information, and local regulations.

(b) Project Description: The U.S. Government requests floor surface replacement and resurfacing work bid documentation for 107 Alcade Street, Pretoria to reflect removal, surface preparations, and installation of new finishes. Currently there are end of life, damaged and an outdated mixture of flooring and surface finishing throughout the residence.

Proposals to include:

- Project plan.

- All interior floors to be lifted and re-tiled.

- Exterior front porch, tiled entrances, all exterior tiled areas to be lifted and re-tiled.

- Various concrete and paving repairs.

(c) Proposal Submission: The requested services and costs shall be addressed in the consultant's proposal for each category of services. In addition, the proposal shall include a schedule presenting the time required to perform the above services, and detailed lump sum fee for the services to be performed.

(d) Access:

All contractor employees are required to be vetted before allowing access to work site within an U.S. Government property.

This vetting procedure includes providing, to the P.O.C. copies of I.D’s, P.O.C. will submit to the security office for temporary clearance.

Access Clearances issued will be valid only for the discussed times with P.O.C.

All service dates are to be indicated on the access control sheets upon site visits/ meetings.

Site visits, original ID’s must be taken with for access confirmation. Not certified, original only.

2. Definitions.

(a) Whenever the term "Owner" is used herein, it shall refer to the U.S. Embassy in Pretoria.

(b) Whenever the term “P.O.C.” is used herein, it shall refer to the project manager, “Point of contact”.

(c) Whenever the term “Contractor” is used herein, it shall refer to vendor.

3. Site Familiarization: Site meeting/ visit and brief held: Done.

The Contractor shall be familiar with the nature of the work, the general and local conditions, and all matters which may in any way affect the work under this contract. A site visit will be arranged to discuss the scope of work and requirements from the owner.

The Contractor shall notify the P.O.C. in writing of any additional information needed.

4. Suggested Modifications.

Any suggestions for modification of the requested scope believed to be appropriate to improve the outcome of the project are welcome and will be reviewed for acceptance.

Interior and exterior- Tile & paving revamp.

Alcade 107

P a g e 3 | 6

5. Deliverables for quotation/ proposal submission

- If new to the U.S.G. projects submission, a company profile, to include indications of previous and similar work completed.

- Should detail all Tasks listed below.

- Expected work plan/ time frame.

- Safety plan will be required before work commences.

CONTRACTOR/COMPANY: ________________________________________

➢ Contractor to confirm measurements before quoting. NO COST ADJUSTMENTS WILL BE APPROVED DUE TO

INCORRECT MEASUREMENTS.

STANDARD PREPARATION AND WORK TO BE DONE.

Cost Labour Cost Material

TASK # 1: General- Project & Safety. R R

TASK # 2: Interior floor surfaces. R R

TASK # 3: Exterior floor surfaces R R

Sub Total R R

VAT (if applicable) R R

TOTAL AMOUNT QUOTED R

Contractor concerns and notes:

Interior and exterior- Tile & paving revamp.

Alcade 107

P a g e 4 | 6

6. Project requirements:

TASK # 1: General- Project & Safety.

- Provide actual project plan and samples for approval.

- Project specific safety plan.

- Contractor to always uphold a clean and organized environment.

o Daily site cleanup.

- Remove and dispose all taken out/ scrap material from site. Confirm with P.O.C. before removal.

- Project to include top to bottom/ surrounding effected damaged areas neatening and finishing.

o Attention to detail is ESSENTIAL.

- Contractors will be liable for repairs or replacement of damaged fixtures and fittings.

- Installation/ workmanship warranty: 12 Month warranty.

TASK # 2: Interior floor surfaces.

- Do not remove or disconnect any wiring, contact P.O.C. for removal.

- All interior floor tiles.

- Contractor to strip/remove all tiles and skirting.

- Clean/remove all access tile cement from floor.

- Install new tiles with a spacing of 3/ 5mm. (TBC. Tile type).

- Grout all tile joints with light grey grout. (TBC. Tile type).

- Contractor to make allowance to patch and prepare floors as needed.

- Install tile skirting of 100mm with 10mm half round aluminum tile edge.

- Kitchen wall to be tiled with a white subway tile.

- Suggested tile: Floor T.B.C. Approximately 190 m². PC Sum R 250.00m²

- Suggested tile: Walls T.B.C. Approximately 60 m². PC Sum R 250.00m²

- Estimated coverage: Measured by potential vendors on site meeting.

- Outside quarters to be tiled, two rooms, passage, and bathroom with interior tile.

❖ Bathroom wall to be a white subway tile.

TASK # 3: Exterior floor surfaces

- Do not remove or disconnect any wiring, contact P.O.C. for removal.

- All exterior tiled areas.

❖ Contractor to strip/remove all tiles and skirting.

❖ Clean/remove all access tile cement from floor.

❖ Install new tiles with a spacing of 3/ 5mm. (TBC. Tile type).

❖ Grout all tile joints with light grey grout. (TBC. Tile type).

❖ Contractor to make allowance to patch and prepare floors as needed.

❖ Install tile skirting of 100mm with 10mm half round aluminum tile edge.

❖ Suggested tile: Kilimanjaro anti slip floor tile 635 x 420mm. PC Sum R 200.00m² ❖ Estimated coverage: Measured by potential vendors on site meeting. Approximately 150 m².

- All paved areas, lift and repair areas that is in bad condition.

❖ Lift and relay pavers. Approximately T.B.C. m².

❖ Replace pavers. Approximately T.B.C. m².

❖ Multiple area edging to be replaced. Approximately T.B.C.

❖ Concrete walkway repairs: Approximately- T.B.C. m².

- Garage floor to be tiled with exterior tile.

- Pressure wash and clean all exterior surfaces.

Interior and exterior- Tile & paving revamp.

Alcade 107

P a g e 5 | 6

7. Point of Contact:

(a) U.S. Embassy Pretoria, Project Manager

Etienne Smit

(b) U.S. Embassy Pretoria Procurement.

Before PO is issued, all communication to route via Pretoria Procurement agent assigned to the project.

8. Location of residence:

107 Alcade Rd. Pretoria.

9. Project duration:

Five weeks, to include, manufacturing, delivery & installation.

10. Picture indications:

T.B.C.

1. General Safety

a. The Contractor must demonstrate an understanding of their responsibilities related to the safety and health requirements by addressing hazards in the pre-planning processes and meetings.

b. Before starting a project, the Contractor must review the work site and identify hazards that may occur while performing the work project.

c. The Contractor is expected to provide a “competent person” to implement the site safety and health plan and oversee its strict compliance. A competent person is an individual who, by way of training and/or experience, is knowledgeable of applicable standards, capable of identifying workplace hazards related to the specific operation, is designated by the employer, and has the authority to take appropriate actions.

d. The Contractor must provide proof of payment of local insurance for all employees involved in the work project for the duration of the project. This information must be included as part of the safety file.

e. The Contractor will conduct a safety briefing before starting daily work.

f. Any Contractor personnel who show signs of intoxication will be denied entry into the work area.

g. The Contractor shall ensure personnel working at the site are trained and aware of potential hazards. The Contractor shall unequivocally ensure that personnel have proper safety equipment to prevent accidental injury per the contract's requirements.

h. The Contractor must accept the safety and health standards established by the U.S. Embassy.

i. All workers shall remove any chains, rings, watches, bracelets, and other jewelry during the execution of the work project. Medical bracelets are excluded.

j. Smoking is strictly prohibited at the work site, and personnel will only use areas identified as “designated smoking areas.” The consumption of marijuana or similar recreational substances is strictly prohibited on U.S. government-held properties.

k. The Contractor will report accidents and near misses to the COR, who will pass the proper data to the POSHO.

2. Barricading and Warning Signs The Contractor must place provisional barricades and warning signs to maintain a safe and accessible path of travel for all pedestrians, including those with disabilities, to avoid accidents with third parties. Barricades alert others about hazards created by construction activities and should be used to control vehicular traffic around the work site. The Contractor shall:

a. Erect and maintain proper barricades for the duration of the contract, including fencing material, traffic cones, caution tape, and temporary curb rams, complying with all applicable access codes and regulations.

b. Ensure that no construction materials are stored and/or positioned in the path of travel.

c. Maintain the construction barriers in a sound, neat, and clean condition.

Interior and exterior- Tile & paving revamp.

Alcade 107

P a g e 6 | 6

3. Personal Protective Equipment (PPE)

a. All Contractor personnel must use the PPE required per the contracted work.

b. The Contractor must inspect and maintain spare PPE in case of equipment damage, deterioration, or loss.

c. The PPE must meet the technical specifications required by local and international standards.

d. All sharp cutting tools must be carried in tool-carrying cases. Under no circumstances shall they be carried on-person in uniform pockets.

e. In those takes where certified PPE is required, the Contractor must provide the current certification to the POSHO via the COR.

f. The Contractor must provide records of PPE received for all the employees involved in the task.

4. Safety Inspections

a. All tools, equipment, and machinery used in executing the contracted work must be inspected by a competent person before starting the project.

b. COR and/or safety representatives of the U.S. Embassy may inspect the Contractor's equipment, tools, and machinery at any time and request a change if necessary.

5. Hand & Power Tool Safety

a. The Contractor must ensure the safety of all tools and equipment its employees use.

b. All hand and power tools must be inspected regularly and maintained in good condition per the manufacturer's specifications. Tools that are damaged must be removed from service.

c. The Contractor shall ensure that all tools are used only for their intended purposes.

End of SOW