SOW_AE25030_BU-B-UCL_18MAR2026.pdf
PDF 204 KB Posted
- Solicitation number
- W91CRB-26-R-5005
About this file
This is a Statement of Work (SOW) for a Foreign Military Sales (FMS) case under case number BU-B-UCL AE25030, dated 18 March 2026, for the delivery of electronic network equipment to Bulgaria.
The contract requires the delivery of PacStar network equipment in the following quantities: 38 sets of PacStar 447 w/Cisco Blackheart ESR (6300, Network Essentials, 50 Mbps max throughput) with factory-installed software upgrades to 250Mbps; 38 PacStar Small Form Factor GIG-E Switch modules with Cisco switch technology providing 8 x 1G ports and 2 x 10G SFP ports; 19 sets of 6 Core Xeon E Processors with 96GB ECC memory, single 2.5" SSD drive bays, and VMWare ESXi Essentials Version 6.7 software; 19 KG250XS sleds compatible with PacStar Smart Chassis; and 19 250W chassis units with 5-slot capacity and MIL-STD-999 DC input connectors. No services are required. The contractor must comply with applicable military standards including MIL-STD-130N for identification marking, MIL-STD-129R for shipment and storage marking, MIL-STD-882E for system safety, and packaging standards per ASTM D 3951-18 with commercial level protection. All items with acquisition cost of $5,000 or more require Item Unique Identification (IUID) marking. Additional requirements include wood packaging material compliance with ISPM 15 standards, safety engineering hazard identification, antiterrorism training for all contractor personnel, OPSEC procedures, and personnel security training.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
PacStar Network Equipment
Foreign Military Sales (FMS) Case
BU-B-UCL
AE25030
18 March 2026
STATEMENT OF WORK (SOW)
1 SCOPE
This document describes work to be performed to deliver Electronic Equipment under Foreign
Military Sales (FMS) case BU-B-UCL AE25030 for the country of Bulgaria. The word Government in this document refers to the United States Government. The word country in this document refers to the
FMS Customer(s).
2 APPLICABLE DOCUMENTS
2.1 Military Standards (MIL-STD)
MIL-STD-130N with Change 1 Identification Marking of U.S. Military Property
MIL-STD-129R Military Marking for Shipment and Storage
MIL-STD-882E System Safety
U.S Army Communications-
Electronics Command (CECOM)
Regulation 380-16
Industrial Security Program Requirements
Directive Type Memorandum
(DTM) 09-019
Policy Guidance for Foreign Ownership, Control, or Influence
(FOCI)
Department of Defense (DoD)
Directive 5230.11
Disclosure of Classified Military Information to Foreign
Governments and International Organizations
DoD 8570.01-M Information Assurance Workforce Improvement Program
Army Regulation (AR) 525-13 Antiterrorism
AR 530-1 Operations Security
2.2 Commercial Standards
International Society of
Phylolactic Materials (ISPM)
Guidelines for Regulating Wood Packaging Material in
International Trade
Association of Standards for
Technology in Manufacturing
(ASTM) D 3951-18
Standard Practice for Commercial Packaging
3 REQUIREMENTS
3.1 Requirements for Hardware. The contractor shall provide equipment described. Equipment shall be provided in accordance with (IAW) and shall meet the specifications and performance criteria stated in this SOW.
3.1.1 PacStar 447 w/Cisco Blackheart ESR. The contractor shall deliver thirty-eight (38) sets of PacStar 447 w/Cisco Blackheart ESR as stated below:
PS447-01 PacStar 447 w/Cisco Blackheart ESR 6300, Network Essentials, 50 Mbps Max throughput. (MUST BE BUNDLED WITH A PSA-S-447U-xxx SOFTWARE
SKU)
PSA-S-447U-NE250-100 PacStar Accessory, Software, PS447 38 - Upgrade - Network Essentials / 250Mbps (factory installed)
3.1.2 PacStar Small Form Factor GIG-E Switch. The contractor shall deliver thirty-eight (38) sets of PacStar Small Form Factor GIG-E Switches as stated below:
PS444-02 PacStar Small Form Factor GIG-E Switch Module, Built with Cisco Switch technology.
Provides 8 X 1G ports (4 of which are PoE+) and 2 X 10G SFP Ports (SFP not included). Includes AC/DC brick.
3.1.3 6 Core Xeon E Processor. The contractor shall deliver nineteen (19) sets of 6 Core Xeon E Processor as stated below:
PS451-2276ME-96-25D-06 6 Core Xeon E Processor, 96GB ECC Memory, Single 2.5" SSD Drive Bay and NO internal SSD, 5 Port I/O: 5 X GIGE (2 PoE), 1 Full Size USB, 1 Console Serial, 1 Mini Display Port, 1 Micro-USB.
Includes AC/DC Brick SSD-25-1000 Single 2.5" SSD, 1 TB Capacity 19 - SW-VM-01-04 VMWare ESXi Essentials Version 6.7. 19 -
3.1.4 KG250XS Sled. The contractor shall deliver nineteen (19) sets of KG250XS Sleds as stated below:
PS400-KG250XS-01 KG250XS Sled fitting 1-slot in the PacStar Smart Chassis (Compatible with standard lid)
3.1.5 50W Chassis, 5 Slot. The contractor shall deliver nineteen (19) sets of 50W Chassis, 5 Slot as stated below:
PS400-250-CHAS-5-004 250W Chassis. 5 Slot. Power button on front, and MIL-STD-999 DC input connector. Includes 2590 LI-ION Battery.
3.2 Requirements for Services.
Services not required.
3.3 Item Unique Identification (IUID).
The Contractor shall mark all contract deliverables in accordance with Defense Federal Acquisition
Regulation Supplement (DFARS) clause 252.211-7003 in Section F of this contract and the following requirements:
3.3.1 IUID Marking.
a. New items: The Contractor shall provide IUID, or DoD recognized equivalent, for all items delivered with an acquisition cost of $5,000.00 or more and Government serial numbered items. For long term contracts, the Contractor shall implement IUID markings IAW MIL-STD-130N w/Ch1, dated 16 Nov 12 for any item that will exceed the $5,000.00 unit price for any range quantity or contract year. This requirement is effective throughout the life of this contract.
b. Repair items: The Contractor shall mark those items as identified by the Government. Items received for repair shall be inspected for IUID markings. Those items where the marking is damaged or missing the Contractor shall mark the equipment. When marking requirements are not clearly specified then the Contractor shall advise the PCO. For previously acquired items where the IUID markings were not required the Contractor shall follow the procedures as if the item was a new item.
c. Commercial Markings. All other items shall have acceptable commercial markings that meet the guidelines in DoD Guide to Uniquely Identifying Items https://www.acq.osd.mil/asda/dcp/ce/ds/indes.html
d. Permanency and Legibility. The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-STD-130N w/Ch1, dated 16 Nov 12.
e. Deleterious Effect. Marking of items shall be accomplished in a manner that shall not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of the marking shall not create hazardous conditions.
f. Mandatory Information Reporting for all items requiring IUID marking. The Contractor shall include the National Stock Number (NSN), if the item has a NSN, the Serial Number marked on the item, if a Serial Number is marked on the item, the original part number, the current part number (only if not the same as the original part number), the current part number effective date (only if the current part number is used) and the USARMY as the SERVICE /AGENCY/COMMAND data element in the information reported to the Aberdeen Proving Ground Army Acquisition Command (APG ACC), in addition to the information required to be reported to the APG ACC by DFARS clause 252.211-7003.
g. Wide Area Workflow (WAWF) users shall report this mandatory information to the APG
ACC by Direct submission via an X12 Ship Notice/Shipment and Billing Notice (856/857) transaction, an IUID XML transaction, an IUID flat file transaction or a WAWF IUID Material
Inspection and Receiving Report/Combo UDF through the Global Exchange (GEX) Service, or https://www.acq.osd.mil/asda/dcp/ce/ds/indes.html manually, via the IUID Web Entry Site at http://www.bpn.gov/iuid. For WAWF users, these methods do not replace the current WAWF interaction, but are performed in addition to it after the shipment has been accepted to provide IUID data that cannot be provided via WAWF.
3.3.2 IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130N w/Ch1, dated 16 Nov 12.
a. Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD-130N w/Ch1, dated 16 Nov 12. First priority is the 2D data matrix symbol
(machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.
b. If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.
c. If items are not described by Government Product Technical Data (i.e. Commercial Items), the Contractor shall maintain diagrams showing placement and description of the IUID marking and applicable installation and processing instructions for government review.
d. The Contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list.
The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The Contractor shall provide this list to the government at the end of the contract.
3.4 Packaging. Packaging/packing shall be in accordance with ASTM D 3951-18, Standard
Practice for Commercial Packaging, Level of Protection (LOP): Commercial, Level of Pack (LPK):
Commercial, Quantity Unit Pack (QUP): 001. Marking shall be in accordance with MIL-STD-129R.
3.4.1 Wood Packaging Material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
3.4.2 All WPM shall meet the requirements of IISPM Number 15, “Regulations in Wood Packaging
Material in International Trade (2009)”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.
3.4.3 All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) IAW American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see www.alsc.org/WPM_summary_mod.htm).
http://www.bpn.gov/iuid
3.4.4 All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that shall be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.
3.4.5 Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
3.4.6 The Contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packing and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products.
3.6 Perform Safety Engineering. The Contractor shall identify all real and potential hazards associated with the equipment ordered on this contract. This shall include any toxic substance exposure concerns to personnel during operation or maintenance to include transportation or resulting from damage to the equipment. The Contractor shall also identify any special disposal procedures.
The identified hazards and special disposal procedures shall be described either in the applicable
Technical Manual shipped with each hardware item, or alternatively as a separate insert (in English) included with each hardware item if no Technical Manual is available for the item. All hazards that cannot be eliminated shall be reduced to lowest risk possible. Those hazards that cannot be eliminated must be presented to the contracting officer, providing as a minimum the post and pre-fix hazard severity and hazard probability levels, corrective action and status, prior to government acceptance of the equipment. MIL-STD-882E shall be used in assessing system safety. The Contractor shall affix applicable safety/hazardous precautionary warnings on hardware in English.
4 SECURITY AND Operational Security (OPSEC)
4.1. Antiterrorism (AT) / iWATCH
a. AT Level I training. This standard language is for contractor employees with an area of performance within a controlled installation, facility or area: All contractor employees, to include subcontractor employees, requiring access to installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to to the contracting officer within 60 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
https://jkodirect.jten.mil/ for CAC holders (Course number “-US007”). Non-CAC-holders may go to:https://jko.jten.mil/courses/atl1/launch.html.
b. AT Awareness Training - AT Awareness Training for Official and Unofficial Contractor
Personnel Traveling Overseas: US based contractor employees and associated subcontractor employees shall receive government provided area of responsibility(AOR) specific AT awareness submit training as directed by AR 525-13, or other specific requirements, as necessary. Specific
AOR training content is directed by the combatant commander with the unit ATO being the local point of contact. US based contractor employees and associated subcontractor employees will update their PRO-File survey prior to their official or unofficial travel, in accordance with AR 525-
28, Personnel Recovery. The PRO-File survey is available at the following link:https://prmsglobal.prms.af.mil/prmsconv/Login/Banner.
c. iWATCH Training. This standard language is for contractor employees with an area of performance within a facility or area. The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity
Approved Training Organization (ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the Contracting Officer.
4.2 OPSEC
a. For contracts that require a formal OPSEC program. The contractor shall develop an
OPSEC Standing Operating Procedure (SOP)/Plan, Operations Security (OPSEC) Plan, within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The Contractor shall implement
OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1. Details on obtaining Level II certification can be furnished by the Government OPSEC Officer.
b. For contracts that require OPSEC Training: Per AR 530-1 Operations Security, the CECOM
OPSEC Plan, and AR 350-1 Army Training and Leader Development contractor employees must complete Level I OPSEC Awareness training within 30 calendar days of reporting for duty and annually thereafter. Level I OPSEC training is available via the Army Learning Management System
(ALMS) application at the following link: https://www.lms.army.mil/ and by searching “Army
OPSEC Level I (Duration: 2 hours). An Enterprise Access Management Service Army (EAMS) account is required to access the ALMS application. Contractors shall also participate in any command directed OPSEC stand downs, e.g., ad-hoc refresher trainings. If Computer Based Training (CBT) via
ALMS cannot be completed, the organization's OPSEC Officer can provide the training to meet the
Initial and Refresher training requirements.
4.3 Personnel Security (PERSEC).
a. Security training for contractors: Several training requirements exist for contractor personnel per DoD and Army regulation/directives. On-site contractors may receive training briefs from the government appointed Security Manager; however, contracting companies will be required to provide training to off-site contractor employees. Training is tailored to the organization’s requirements as well as local policy. Some examples of Security training provided to integrated/embedded contractors may include, but is not limited to, the following:
• Initial Security Orientation: Online training available on the Army Learning Management
System (ALMS) site, reference ALARACT207-2103 - Initial training https://prmsglobal.prms.af.mil/prmsconv/Login/Banner.
https://www.lms.army.mil/
• Annual Security Orientation: Online training available on the Army Learning Management
System (ALMS) site, reference ALARACT 207-2103 - Annual training requirement
b. For Contract Requiring Performance or Delivery in a Foreign Country. DFARS
Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors outside the US.
The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key
AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force commander policies and directives.
File details come from the government source that posted it. Updated .