SOW AC-25-02322 Keyence Reverse Engineering and Quality Assurance Kit.pdf
PDF 120 KB Posted
- Solicitation number
- AC-25-02322_Complete_Coordinate_Measuring_System
About this file
This Statement of Work (SOW) details the Federal Aviation Administration's procurement of a Reverse Engineering and Quality Assurance Kit for technical operations and equipment sustainment. The procurement includes a comprehensive set of advanced dimensional inspection systems and accessories, specifically the XM-5000 Coordinate Measuring System and IM-8030 Instant Measurement System, with 21 total line items ranging from wireless modules and batteries to software and calibration tools.
The SOW specifies that all systems must be delivered new, fully operational, and capable of supporting reverse engineering workflows including dimension extraction, tolerance evaluation, CAD comparison, and report generation. The contractor is required to provide a support package with installation guidance, initial training, technical support, and comprehensive documentation. Delivery is set for 21 days after receipt (ARO) to the FAA facility in Oklahoma City, with acceptance contingent upon inspection and verification of all listed items and system functionality.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Reverse Engineering and Quality Assurance Kit Procurement
Date: 5/22/2025
1. Objective This Statement of Work defines the procurement requirements for a Reverse Engineering and Quality Assurance Kit composed of two advanced dimensional inspection systems and supporting accessories. This equipment will enable precision inspection, part validation, and reverse engineering functions critical to the FAA’s mission in technical operations and equipment sustainment.
2. Scope of Work The vendor shall furnish, deliver, and support a fully integrated Reverse Engineering and Quality Assurance Kit composed of:
- XM-5000 Coordinate Measuring System
- IM-8030 Instant Measurement System All accessories, software, power systems, batteries, chargers, and setup tools required for full operational deployment of these systems are detailed in Section 3.
3. Deliverables The contractor shall provide the following equipment and components:
3.1 Combined Equipment Table:
Line Item Code Description Qty
1 XM-5000 Coordinate Measuring System (Camera, Single Probe)
2 XM-WA Wireless Modules (2-pack)
3 XM-M50E Manual Kit 1
4 XM SUPPORT PK XM Support Package 1
5 972349 Windows 10 Laptop & Software for XM
6 XM-B1 Rechargeable Li-Ion Battery for XM
7 XM-BC1 4-Slot Battery Charger
8 XM-H5000 Stage (Large) 1
9 972352 M8 Fixture Kit 1
10 XM-AT Camera Setting Attachment
11 OP-88754 Magnet for Stylus Calibration
12 OP-88701 2.5 mm Stylus (XM Probe Accessory)
13 XM-H5C2 CAD Import Software for XM
14 CMS-1 USB-C Hub 1
15 OP-88569 USB Type-C Cable 1
16 HR-X300WB Rugged Wireless Handheld 1D/2D Code Reader
17 IM-8030 IM Head Unit 1
18 IM-8001 IM Controller Unit 1
19 IM-M80A Accessory Set for IM 1
20 IM-H3C CAD Offline Software
21 IM-H3EA Offline Editor Software
4. Performance Requirements All systems must be delivered new and fully operational. All software shall be licensed for unrestricted use and support file formats typical for CAD and manufacturing data exchange.
Systems must support reverse engineering and quality assurance workflows including dimension extraction, tolerance evaluation, CAD comparison, and report generation.
5. Support Requirements The contractor shall include a support package to provide:
- Installation guidance
- Initial training on XM and IM systems
- Access to technical support and firmware/software updates Documentation shall include manuals for hardware operation, software use, maintenance, and safety.
6. Delivery and Acceptance Delivery Address:
Bldg 2, LSF, WC#422 6500 S MacArthur Boulevard Oklahoma City, OK 73169
Delivery: 21 Days ARO
Acceptance will be contingent on inspection and verification of all listed items and system functionality.
| 1. Objective |
| 2. Scope of Work |
| 3. Deliverables |
| 3.1 Combined Equipment Table: |
| 4. Performance Requirements |
| 5. Support Requirements |
| 6. Delivery and Acceptance |
File details come from the government source that posted it. Updated .