SOW - 66 RGS Power to Equpiment Install.pdf
PDF 113 KB Posted
- Attached to
- UPDATED**66 RGS Power to Equipment Install
- Solicitation number
- F3G2EB2349A101
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Questions and Answers 5.8.23.docx | DOCX document | |
| F3G2EB2349A101response.docx | DOCX document | |
| 66 RGS F3G2EB2349A101 photos.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
INSTALL POWER/INDUSTRIAL RECEPTACLES & AIR COMPRESSOR VARIOUS LOC’S
Bldgs. 61685
NELLIS AIR FORCE BASE, NEVADA
13 February 2023
NELLIS AIR FORCE BASE, NEVADA
STATEMENT OF WORK
1. SCOPE: The Contractor shall provide all labor, equipment, and material to power equipment located at Bldg. 61685, Nellis AFB. The Contractor shall utilize existing sub panels and provide power for the following equipment: (1) one each DB600 Machinery, (1) one each Bandsaw, (1) one each Iron Worker, (1) one each Bench Press, (1) one each Belt Sander, (1) one each Magnetic Sheet Metal Brake, and (1) one dedicated circuit to power the Air Compressor (located in the adjacent facility warehouse).
The Contractor shall include all wire, breakers, conduit, fuses, and all else necessary to power the equipment. Voltage(s)/amperage(s) shall be determined by the individual equipment data plates and/or manufactures specifications. All fittings shall be compression type and conduit less than 3/4” shall not be used. The Contractor shall provide dedicated circuitry for each piece of equipment and label the panel schedule(s). Upon completion of the project the Contractor shall test in the presence of the Government any/all 3-phase motors for proper rotation and all other equipment within scope to ensure operation. All work shall be in strict compliance with the NEC, UFC, IFC and all other applicable codes. The Contractor shall provide a period of (1) year warranty commencing at the time of Government acceptance of all work.
2. LOCATION: The project site is located at Nellis AFB, Nevada. The Main base is located approximately nine (9)miles north of downtown Las Vegas on Highway US 93 (Las Vegas Blvd.).
NAFB consists of three main areas: the Main Base, Area II and Area III.
3. COMMUNICATIONS SPECIFICATIONS: All design and construction must be in compliance with the International Building Code (IBC) latest Edition, Department of Defense Unified Facilities Criteria Standards (UFC), all Public Laws (P.L.), Executive Orders (E.O.), Code of Federal Regulations (CFR), Department of Defense Instructions (DODI), Department of Defense Directives (DODD), Nellis Installation Development and Design Standards (ID2) and Clark County, State of Nevada, and Federal standards, codes, and laws or other higher authority documents as applicable.
Any discrepancies between code or standards provisions and the contract documents shall immediately be brought to the Contracting Officer’s attention, and the more stringent requirements shall apply unless otherwise directed.
4. DRAWING STANDARDS: The contractor shall provide As-Built drawings, heat maps, equipment lists, with Serial Numbers.
5. ENVIRONMENTAL PROTECTION:
5.1 The Contractor shall identify walls, ceiling tiles and areas that will be penetrated or disturbed for successful completion of the project.
6. CONTRACTOR PERSONNEL
6.1 Contractor personnel will comprise of cleared U.S. citizens only. The general contractor and sub-contractors must submit all required documentation for every employee to the GSSO’s prior to entry.
The general contractor will provide the GSSO’s with a daily employee roster (EAL) which will document the work performed. U.S. citizens must perform all phases of construction, to include the final phase of any work necessary. The Security Manager will maintain documentation and logs of all contracted construction personnel, construction material delivered to the construction site, details of each phase of construction, and any other anomalies which may have occurred.
7. WORKING HOURS: Standard working hours are from 7:00 a.m. to 4:00 p.m. Monday through Friday excluding Federal Holidays and the day after Thanksgiving. Contractor requested deviations to this schedule will be considered if it is in the best interest of the government as determined by the Contracting Officer. If the Contractor desires on working hours other than 7:00 am to 4:00 pm, Monday through Friday, he must submit to the Contracting Officer a work schedule at least five working days prior. The schedule shall note the activities planned, the planned hours of work, and the reason for the additional hours so that the construction inspectors can plan their work schedule.
8. DESCRIPTION OF WORK:
5.1 Provide power for DB600 208/230V, 3 phase with 30A materials included.
5.2 Provide power for bandsaw 208V, 3 phase 30A materials included.
5.3 Provide Power for Iron Worker 208V 30A materials included.
5.4 Provide power for bench press 208V 30A materials included.
5.5 Provide two dedicated circuits for Belt Sander and Magnetic Sheet Metal Brake. Provide power for fans by installing four new surface mount Duplex Receptacles. Pricing should include the necessary conduit, wire, breakers, receptacles, hardware, and all terminations.
5.6 Provide 480V, 3 phase, 30A CKT for air compressor (existing Panel M2) to include Air Compressor plumbing. Pricing should include the necessary conduit, wire, breakers, receptacles, hardware, and all terminations.
File details come from the government source that posted it. Updated .