F3G2EB2349A101response.docx

DOCX document 13 KB Posted

Attached to
UPDATED**66 RGS Power to Equipment Install
Solicitation number
F3G2EB2349A101
Issued by

View the file

Other files

File Type Posted
Site Visit Questions and Answers 5.8.23.docx DOCX document
66 RGS F3G2EB2349A101 photos.docx DOCX document
SOW - 66 RGS Power to Equpiment Install.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOW states that the contractor shall utilize existing and new panels. Is there something installed already?

A: There are 2 subpanels. Equipment is installed just does not have power.

2. Can photos be provided for this solicitation?

A: See included photos of machines with subpanels in background

3. Please provide the square footage of Bldg. 61686.

A: It is Bldg. 61685. Sq footage is 3200

4. How far are the subpanels from the equipment that will need to be installed?

A: approx. 20, 25, 30, 20. This is straight line estimate.

File details come from the government source that posted it. Updated .