SOW 25mm High RAP RU20 Beaver County 2026.pdf

PDF 236 KB Posted

Attached to
25mm High RAP RU20 Beaver County 2026
Solicitation number
6100066076
Issued by
Beaver County, Pennsylvania

About this file

This is a Scope of Work and mix design specification document issued by PennDOT for Beaver County, Pennsylvania, for the procurement of plant-mixed asphalt containing Reclaimed Asphalt Pavement (RAP) material. The solicitation requests quotes for 25mm RAP binder course asphalt with RAP content not to exceed 50% by weight, manufactured in compliance with PennDOT Bulletin 408 specifications and Superpave asphalt mixture design standards. The project encompasses three delivery components: 2,500 tons for Department Force pickup, 250 tons for vendor delivery of asphalt, and 250 tons for vendor delivery of asphalt with millings hauling. All material deliveries are scheduled between August 1, 2026, and November 30, 2026, with expected delivery times within three calendar days of notification and a required delivery rate of 150–175 tons per hour. The material will be placed on State Route 3020 in Beaver County Section 20. Questions regarding Solicitation #6100066076 must be submitted by June 4, 2026, at 11:00 AM EST, with bids publicly opened and read virtually via Microsoft Teams on June 10, 2026, at 11:01 AM EST. The contract includes a three-month (90-day) extension period following the initial validity end date.

Vendors are required to bid on a per-ton price basis for the estimated tonnage of material and must provide QC testing, mix design development, and certification prior to delivery. The awarded vendor will receive up to an estimated 1,500 tons of RAP millings delivered to the plant nearest to the jobsite; these millings are not provided on a one-to-one ton exchange basis and may be credited toward awarded millings the vendor receives. All material certifications, weight tickets, and millings certifications must be submitted daily via email to designated PennDOT representatives. Asphalt cement grades of PG 64S-22 or PG 58S-28 are specified depending on RAP percentage, with air void tolerances and VFA ranges detailed in the provided tables. The vendor must comply with all Pennsylvania state labor and workforce safety laws and submit the Worker Protection and Investment Certification Form (BOP-2201) with the bid. Primary contact for the project is Daniel Lechok, Roadway Programs Technician II, at (724) 774-6610.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RAP Mix Design Specification

25mm RAP Mix

PennDOT Beaver County is requesting quotes for a Plant Mixed asphalt product containing various percentages of RAP material allotted in PUB 408 specifications with maximum amount of RAP less than or equal to 50%. The material mix design must be approved prior to any delivery of materials. This material is for placement by Department forces and equipment. The awarded vendor is to supply warm mix asphalt as approved by the District Materials Manager. Testing and development of mix designs will be the responsibility of the vendor and subject to review/approval of the District Materials Manager.

Adam Krehnovi

45 Thoms Run Rd, Bridgeville, PA 15017

(412) 429-9371

SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, MODIFIED HIGH RAP REQUIREMENTS,

PG 64S-22, < 0.3 MILLION ESALS, 25 MM MIX-HIGH RAP

Section 411/413 with revisions as follows:

Revise reference to 409.2(a)2/413.2(a)2 to read as follows:

Mix Containing More than 15% RAP. RAS may not be used in mixtures containing more than 15% RAP. Utilize the class (grade) of asphalt cement in the mixture as listed in Table HR.

Furnish material conforming to the requirements of Standard Specifications for Performance-Graded Asphalt Binder, AASHTO M 322, except as revised in Bulletin 25. Obtain material from a source listed in Bulletin 15 for the specified grade. Provide QC testing and certification as specified in Sections 106.03(b) and 702.1(b)1.

Provide the Representative a copy of a signed Bill of Lading for bituminous material on the first day of paving and when the batch number changes.

Design mixes in accordance with Section 411/413 with the following modifications:

TABLE HR

RAP % by weight Gyrations at N design

Air Voids at Ndes

Virgin PG Binder Grade

Aggregate Gradation Control Points for the No.

8(2.36 mm) Sieve Size, %

Min. – Max.

F/A Ratio Voids Filled with Asphalt (VFA)Range, %

>15 to ≤25

50 3.0 – 4.0% 64S-22 or 58S-28*

25% 0.6 – 1.3 69-81

>25 to ≤50

50 2.5 – 3.5% 58S-28** 25% 0.6 – 1.3 73-84

* Producer may elect to use either PG 64S-22 or PG 58S-28 virgin binder grade in the mix. No blending evaluation is needed for RAP up to 30% by weight.

** A different grade of virgin asphalt may be approved if the contractor chooses to have the asphalt cement in the RAP evaluated, and that evaluation shows that blending will achieve a 64S-22 grade at the proportions in the JMF.

TABLE B1

Job-Mix Formula Volumetric Tolerance Requirements of the Laboratory Compacted Mix for Mixtures Meeting the Alternate

Modified High RAP Requirements of this Special Provision Property Each Specimen Multiple

Specimens Air Voids at Ndesign (Va) (+ 2%)(1) (+ 1.5%) Minimum VMA % for 25.0 mm 12.5

(1) The + 2% tolerance only applies down to a minimum Air Voids at Ndesign (Va) of 1.5%.

Bulletin 27, Chapter 2A, 2. Department Revisions to AASHTO R35 with the following modifications:

Section 6.8 The Department will eliminate the need for three trial blends based on a Producer’s previous

Superpave mix design work with specific aggregate blends.

Section 10.1 Prepare replicate mixtures (Note 8) containing the selected design aggregate structure at each of the following three binder contents: (1) the estimated design binder content, Pb (design); (2) 0.5 percent below Pb

(design); and (3) 0.5 percent above Pb (design).

Revise reference to 409.2(e)1.d.1/413.(e)1.d.1 to read as follows:

Apparent Moisture Content. Sample the mixture according to PTM No. 1 daily. Determine the apparent moisture content in the mixture according to PTM No. 749. Produce a mixture with the apparent moisture content not to exceed 0.5%. If moisture exceeds 0.5%, slow the rate of production operations and perform a subsequent PTM No.

749 test.

Revise reference to Section 409.2(e)1.e/413.2(e)1.e Corrective Action, add a fifth bullet point to read as follows:

• QC test results on multiple specimens are < 1.5% total air voids

Mixture acceptance will be by certification.

Vendor will bid on providing estimated tonnage of 25mm Binder mix to section 20 of Beaver County. The vendor will bid price per ton. Quantities for pick-up and delivery appear as follows:

Item 1: tons 2500 Department Force Pick-up Item 2: tons 250 Vendor Delivery of Asphalt Item 3: tons 250 Vendor Delivery of Asphalt and Millings Hauling

Item 3 will require the vendor’s trucking to delivery asphalt and then line up to have the truck filled with millings.

Those millings will be returned to the plant and be credited toward the amount of awarded millings the vendor is to receive.

All quantities are estimated.

Measurement and payment will be in accordance with Pub 408 Section 409.4/413.4 (Ton).

The department reserves the right to add and/or eliminate SR’s within the sections. Delivery of 25mm Binder mix will take place between August 1, 2026 & November 30, 2026.

This PO is subject to a 3-month (90 day) extension period following the validity end date.

All deliveries will be coordinated with the awarded vendor prior to required delivery date; expected delivery time will be within 3 calendar days after being notified by the Department. The material required delivery rate should be between 150 – 175 Tons/Hour depending on project.

For information purposes, only, the material will be delivered to the following state routes:

Section 20 – State Route 3020 segment 10/0 to 60/2418. The department reserves the right to add and/or eliminate SR’s within the section.

Millings Award

The awarded vendor will receive up to an estimated 1,500 tons of RAP millings that will be delivered. The millings will be delivered to the vendor’s plant closest to the current job site/project on that day. The returning millings are not a 1 ton to 1 ton exchange.

For all materials, a daily material certification for pickup, delivery, and delivery with millings hauling will be required to be sent via email. In addition to the material certification, a weight ticket and/or certification for the amount of millings returned to the plant by either the vendor’s trucking or the Department’s trucking must be supplied daily.

All Certifications and tickets must be emailed daily to:

Mike Zimmerman (michaelz@pa.gov) John Grimm (johgrimm@pa.gov) Kathy Guthrie (kguthrie@pa.gov) Dan Lechok (danilechok@pa.gov) Brett Bradshaw (bbradshaw@pa.gov)

Points of Contact Daniel Lechok

Roadway Programs Technician II Beaver County

(724) 774-6610

All questions pertaining to Solicitation # 6100066076 must be made prior to June 4, 2026 at 11:00 AM (EST). All questions and answers will be posted to the Solicitation in eMarketplace for public viewing.

Bids will be publicly opened and read virtually via Microsoft Teams on June 10, 2026, at 11:01 am Eastern Standard Time. Please contact Kathy Guthrie (kguthrie@pa.gov) request a meeting invitation.

Worker Protection and Investment

Pursuant to Executive Order 2021-06, Worker Protection and Investment (October 21, 2021), the Commonwealth mailto:michaelz@pa.gov mailto:johgrimm@pa.gov mailto:kguthrie@pa.gov mailto:danilechok@pa.gov mailto:bbradshaw@pa.gov mailto:kguthrie@pa.gov is responsible for ensuring that every Pennsylvania worker has a safe and healthy work environment and the protections afforded them through labor laws. To that end, contractors and grantees of the Commonwealth must certify that they are in compliance with all applicable Pennsylvania state labor and workforce safety laws. Such certification shall be made through the Worker Protection and Investment Certification Form (BOP-2201) and submitted with the bid, proposal or quote.

Adam Krehnovi
Section 411/413 with revisions as follows:
TABLE HR
TABLE B1
Job-Mix Formula
Volumetric Tolerance Requirements of the Laboratory Compacted Mix for Mixtures Meeting the Alternate Modified High RAP Requirements of this Special Provision
(1) The + 2% tolerance only applies down to a minimum Air Voids at Ndesign (Va) of 1.5%.
Bulletin 27, Chapter 2A, 2. Department Revisions to AASHTO R35 with the following modifications:
Revise reference to 409.2(e)1.d.1/413.(e)1.d.1 to read as follows:
Revise reference to Section 409.2(e)1.e/413.2(e)1.e Corrective Action, add a fifth bullet point to read as follows:
Item 1: tons 2500 Department Force Pick-up Item 2: tons 250 Vendor Delivery of Asphalt
For information purposes, only, the material will be delivered to the following state routes:
For all materials, a daily material certification for pickup, delivery, and delivery with millings hauling will be required to be sent via email. In addition to the material certification, a weight ticket and/or certification for the amount of milling...