SOW 20OSS BLDG 1997 24Jun26.pdf
PDF 321 KB Posted
- Attached to
- B1997 RAPCON Facility Security System
- Solicitation number
- FA480326Q0077
About this file
This is a Statement of Work (SOW) for camera and door access control installation at Building 1997, Shaw Air Force Base, South Carolina, dated 24 June 2026.
The contractor shall provide all personnel, equipment, tools, materials, installation, and training to install five cameras and two electric door strikes. The camera installation includes two 180-degree cameras at the northeast and southwest corners, one doorbell camera at the main door of Room 112, one overhead camera facing the main door of Room 112, and one corridor camera facing the main entrance doors to Rooms 108 and 112. All cameras must be Power over Ethernet (PoE) enabled and routed to a government-provided 65-inch monitor in Room 103. The contractor must also install two Simplex E5010 E-Plex electronic door strikes for Rooms 108 and 112 with remote unlock capability from Room 103. Equipment must comply with UFC-4-133 section 3-9, UFC-020-01, UFC 4-010-01, the National Electric Code, and NDAA-889 requirements. The estimated period of performance is 60 calendar days from contract award, with work scheduled Monday through Friday, 7:00 AM to 3:00 PM, with outside-hours work subject to government approval.
Security requirements include criminal background checks by Shaw Air Force Base Security Forces, physical security of government property, weapons prohibition, reporting of security threats, and restricted photography of Air Force operational aircraft. The contractor must coordinate hazardous material handling through the base HAZMAT section prior to use, maintain work areas free of waste, comply with fire prevention practices per National Fire Code 30, and repair any damage to existing facilities. Key personnel names will be provided upon contract award. The government will identify delivery areas, with freight carriers authorized to drop shipments four days or less prior to installation. The contractor shall maintain compliance with Force Protection Condition (FPCON) requirements as notified by the government.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Building 1997 Camera and Door Access Control
Shaw AFB South Carolina
24 June 2026
1. Description of Work: The Contractor shall provide all personnel, equipment, tools, materials, installation, and training, as defined in this SOW for installing five (5) cameras and two (2) door access controls (electric door strikes). The installation will include: two (2) 180-degree cameras, one (1) doorbell camera, and two (2) overhead cameras. One (1) camera will face the main entrance towards access and one (1) camera corridor camera inside the building facing the main entrance for the building and door leading to the IFR Room- see attachment). All cameras will be routed and displayed on a government provided 65” monitor located in room 103. All cameras need to be PoE (Power over Ethernet) to provide electrical power to them.
1.1 Below is a breakdown of equipment and installation requirement:
• Two (2) 180-degree cameras will be located on the NE and SW corners of building 1997.
• One (1) doorbell camera will face the main door vest tube 112. Note: The conduit is already in place.
• One (1) overhead camera will face the main door of Room 112. (Note: The conduit is already in place at indoor camera locations.
• One (1) camera in corridor will face the two (2) main entrance doors to rooms 108 and 112.
• Two (2) Simplex E5010 E-Plex (or equal) Electronic Pushbutton Compatible electric door strikes – one (1) for door 108 and one (1) for door 112, with the capability to unlock these doors from a single remote location in 103.
2. General Requirements. The Contractor shall procure and install equipment that complies with UFC-4-133 section 3-9, UFC-020-01 DoD Security Engineering Facilities Planning Manual, and UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings. These materials must comply with the national electric code. In addition, the equipment must also meet NDAA-889.
2.1 All details of workmanship shall be in accordance with the highest standards and best practices for flooring installation, flooring maintenance, and all work shall conform to the latest edition of the National Electric Code.
2.2 Period of Performance. The Government estimates the period of performance for this project to be 60 calendar days from the contract award date. The Government understands that the period of performance may change due to potential long-lead time for required parts and components. Any changes to the period of performance or terms and conditions can only be approved by the Contracting Officer (CO).
2.3 Normal hours of operation. The normal duty hours for this project are Monday through Friday, from 7:00 AM to 3:00 PM. Work completed outside the normal duty hours may be approved on a case-by-case basis and must be coordinated and approved by the Government.
2.4 Recognized holidays. Any of the holidays below falling on a Saturday will be observed on the preceding Friday: holidays falling on a Sunday will be observed the following Monday
New Year’s Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June Independence Day 4 July
Labor Day First Monday in September Columbus Day Second Monday in October
Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
2.5 Security requirements for unclassified contracts.
2.5.1 Pass and Identification Items. The Contractor shall ensure the pass and identification items required for contract performance are obtained for employees.
2.5.2 Background Checks: All Contractor employees shall submit to a criminal background check accomplished by Shaw Air Force Base Security Forces prior to the employee being issued base access credentials. Each Contractor personnel must submit their Social Security Number, Date of Birth, and Driver’s License state and number (if applicable). Failure to submit required information can result in denial or delay of issuance of credentials. Background checks are only good for the company that requested them. Processing criminal background checks take, at a minimum, 7-10 days from time of submission.
2.5.3 Retrieving Identification Media. The Contractor is responsible for retrieving all identification media from employees who depart for any reason before the contract expires, e.g. terminated for cause, retirement, etc. The Contractor shall return the retrieved items to the Project Manager.
2.5.4 Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned vehicle or privately-owned vehicle while on Shaw AFB.
2.5.5 Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances that may pose a threat to the security of DOD personnel, Contractor personnel, resources, and classified or unclassified defense information.
2.5.6 Physical Security. The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for Contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
2.5.7 Controlled/Restricted Areas. The Contractor will always be escorted IAW local base procedures for entry to Air Force controlled/restricted areas.
2.5.8 Photography Restrictions: No one is authorized to take any pictures or video recordings of Air Force operational aircraft or restricted areas without the approval of 20 FW/CVN regardless of location while on Shaw AFB. This includes, but is not limited to, photographs taken from personal electronic devices such as blackberries, iPADs, iPODs, cell phones, or any other devices with digital recording capabilities.
2.6 Use of delivery area, freight elevator, and loading dock.
2.6.1 Delivery. The Government will identify a delivery area at Shaw AFB. The freight carrier may drop off the shipment four (4) days or less prior to the Contractor installation date. The Contractor will notify the Government at least forty-eight (48) hours prior to shipment to ensure delivery/storage plan is set. The Government point of contact will be identified at time of award.
2.6.2 Loading dock use. If the materials are large in nature or regular access is needed for construction equipment or tools, the Contractor will coordinate request to use facility loading dock with the Project Manager.
2.7 Repairing damage to existing facility and property. The Contractor shall repair any damage caused to the existing facility including carpet, walls, floor, equipment, furniture, etc.
3.0 Hazardous Materials and Material Recycling:
3.1 Hazardous Material Handling: The Contractor shall have approval from the base Hazardous Material Pharmacy (HAZMART) section prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products that require Material Safety Data Sheets (MSDS). The Contractor shall identify these materials and products on Air Force Form 3952 Chemical/Hazardous Material Authorization Request, Process Identification Form, and Shop Disposal Form. The Contractor shall provide one copy of the MSDSs for each item to HAZMART section for review prior to any chemicals being brought onto Shaw AFB (to include its annexes such as Poinsett or Wateree). The Contractor shall maintain one copy of the MSDSs for each hazardous material line item used within the work center.
4. Clean Up:
4.1 The Contractor shall keep the interior and exterior of the Contractor’s work areas and storage areas free from accumulation of waste material and rubbish. Upon completion of the job, the Contractor shall leave the work area and surrounding premises in a clean, neat, workmanlike condition and in accordance with commercial practices.
5. Fire Prevention: The Contractor is responsible for following fire prevention practices and procedures. The Contractor shall provide approved storage facilities meeting National Fire Code 30, Flammable and Combustible Liquids Code, requirements for storage of flammable materials.
6. Performance of Work During National or Local Crisis:
6.1 FPCON (Force Protection Condition) Checks. Additional FPCON checks may occur sporadically. Increased military security measures shall dictate the use of force protection conditions (FPCON) Alpha, Bravo, Charlie or Delta for the facility. The Government will notify the Contractor if the facility has changed the FPCON and provide the appropriate FPCON instructions to follow.
7. Key Personnel: The Government will provide the names of Key Personnel upon contract award.
End of Statement of Work.
Attachment 1- Building Schematic