SOW 2025 - MMD Stoplog Placement and Removal.pdf
PDF 1 MB Posted
- Solicitation number
- W912DW25Q8004
About this file
This Statement of Work (SOW) details a crane rental requirement for the U.S. Army Corps of Engineers at Mud Mountain Dam in Enumclaw, Washington. The project involves two critical crane picks for installing and removing three tunnel entrance stoplogs on the R-3 intake, with specific equipment specifications requiring a Liebherr LTR 1060 or similar telescopic crawler crane capable of lifting 100,000 pounds at 40 feet. The stoplogs vary in weight from 52,000 to 80,000 pounds, and the work will be executed in two phases: installation during the week of July 14, 2025, and removal during the first or second week of October 2025.
The SOW emphasizes complex logistical challenges, including a steep access road that prevents large truck traversal and requires careful equipment movement. The contractor must provide an operator, rigger, and rigging gear, and will use a government-provided lifting beam with a pneumatic cylinder pin release mechanism. Safety requirements mandate compliance with EM 385-1-1 safety standards, submission of a site-specific safety plan, and completion of an Activity Hazard Analysis. The contract period runs from July 1 to October 17, 2025, with payment made as a lump sum for mobilization and demobilization, covering equipment assembly, transportation, and removal under the Contracting Officer's direction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DW25Q8004 Amendment 0002.pdf | ||
| W912DW25Q8004 Amendment 0001.pdf | ||
| W912DW25Q8004 MMD Crane Rental for Stoplog Picks.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Mud Mountain Dam Stop Log Placement and Removal
(Equipment w/ Operator)
Enumclaw, WA
REQUIREMENTS:
The U.S. Army Corps of Engineers, Mud Mountain Dam has a requirement for 2 total crane picks on the upstream face. We are seeking a properly sized (see below) crane with operator to install/ remove metal stop logs. Access to the location has a steep grade and will take time to traverse in and out. Counterweights can be installed at the top of the dam; however, any additional counterweights will need to be brought down on a smaller truck as a tractor trailer cannot traverse the grade and switch backs. Photos are provided showing the stoplog lifting beam, access along the upstream side of the dam, and the location where the crane will operate. An additional photo shows a crane placing a stoplog.
Contractor to verify all weights and radiuses prior to mobilization. A full walk through of all the lifts will be required prior to mobilization to ensure appropriate equipment is mobilized.
Contractor will need to supply proper rigging gear to attach to the Govt’ provided lifting beam (shackles provided as seen in picture attached) at a weight of 104,00lbs (beam + largest stop log). Due to the inability to access the connection points, this beam is equipped with a pneumatic cylinder pin release mechanism and is required for all picks. Mud Mountain project personnel will operate this device.
1. Pick #1: Requirements for (3) Items - Install Tunnel Entrance Stoplogs (100k @ 40 ft approximately)
Liebherr LTR 1060 or Similar (Telescopic Crawler Crane)
Capable of lifting 100,000lbs at 40’
Crane rental with operator, rigger, and rigging gear required to install 3 tunnel entrance stoplogs on R-3 intake at Mud Mountain Dam. Movement of crane, counterweights, and all other required equipment down to bottom of dam @ 960 deck and back up present an additional challenge due to grade of road. Stoplogs to be installed, weigh approx. - Bottom - 80,0001bs / Middle - 72,0001bs / Top - 52,000Ibs. (Clean and dry)
Work to be done the week of 14 July 2025.
2. Pick #2: Requirements for (3) Items - Remove Tunnel Entrance Stoplogs (100k @ 40 ft Approximately)
Liebherr LTR 1060 or Similar (Telescopic Crawler Crane)
Capable of lifting 100,000lbs at 40’
Crane rental with operator, rigger, and rigging gear required to remove 3 tunnel entrance stoplogs on R-3 intake at Mud Mountain Dam. Movement of crane, counterweights, and all other required equipment down to bottom of dam @ 960 deck and back up present an additional challenge due to grade of road. Stoplogs to be installed, weigh approx. - Bottom - 80,0001bs / Middle - 72,0001bs / Top - 52,000Ibs. (Clean and dry)
Work to be done the first or second week of October 2025.
ATTACHED PHOTOS FOR LIFTING BEAM AND LOCATIONS:
Figure 1: Stoplog lifting beam.
Figure 2: Lifting beam pneumatic pin actuator.
Figure 3: Up-stream access road.
Figure 4: Stoplog pick work site.
Crane Location
Stoplog Slot
Permanent Cradle
(Original Position)
Figure 5: Previous stoplog placement.
LOCATION:
Equipment and operator furnished under this Purchase Order shall be delivered to and used at the Mud Mountain
Dam in Enumclaw, WA.
COMMENCEMENT, PROSECUTION AND COMPLETION:
Work will begin as coordinated by the designated Emergency Management Representative. The anticipated Period of Performance is July 1, 2025, to October 17, 2025.
INSPECTION AND SUPERVISION: All work will be coordinated with appropriate POC at time of award, Seattle District, Corps of Engineers.
SAFETY REQUIREMENTS:
Operation of equipment shall be conducted in accordance with the requirements of EM 385-1-1, “Safety and Health
Requirements Manual”. All personnel are required to have PPE in accordance with EM 385 1-1. EM 385 1-1 can be found at: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
a) Contractor will verify in EM 385-1-1 if these lifts meet the critical lift requirements.
b) Site Specific Safety Plan shall be completed in accordance with EM 385-1-1 and submitted for Government approval. An Activity Hazard Analysis shall also be included as part of the Site-Specific Safety Plan.
SECURITY:
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the QAR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This
Form will be provided to the Contracting Officer and shall become part of the official contract file
SERVICE CONTRACT LABOR STANDARDS APPLY. SEE ATTACHED.
MEASUREMENT AND PAYMENT:
Payment will be made at the purchase order lump sum price for line item, Mobilization and Demobilization, payment of which shall constitute full compensation for assembling equipment at site preparatory to starting work, and for removing it there from at completion of the work under direction of the Contracting Officer.
E-Mail invoices to:
• POC given at time of award.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.uscis.gov/e-verify