This Statement of Work is issued by the Regional Transportation District (RTD) in Denver, Colorado for lighting upgrades at two locations: Denver Union Station Light Rail Plaza (1701 Wynkoop Street) and Civic Center Parking Garage (1560 Broadway). The project scope includes LED lamp replacements at Denver Union Station, installation of LED retrofit kits for existing fluorescent light fixtures, and installation of new linear LED fixtures at the parking garage. The contractor must furnish all necessary labor, materials, equipment, supervision, permits, and insurance to complete the modifications in accordance with construction drawings and specification packages. The Period of Performance is three months. The contractor is required to conduct a site visit to review existing job conditions and determine total quantities of materials and labor needed for completion.

The contractor shall perform all work in strict conformance with local laws, ordinances, and regulations. Work must be carefully planned to minimize cutting, drilling, or channeling of building structures, with any damage repaired at no additional cost to RTD. The contractor is responsible for removal of all materials and scrap, leaving the premises clean and orderly. Upon completion, the contractor must conduct a final walkthrough with building management to confirm satisfaction and proper functionality, transfer all relevant documentation, and support RTD personnel during commissioning and functional testing of the lighting controls. Any work deemed unsatisfactory by building management must be immediately redone at no additional cost to RTD. The Statement of Work does not specify pricing terms, set-asides, funding amounts, or other financial details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Regional Transportation District Denver, CO

Statement of Work

Lighting Upgrades at Denver Union Station and Civic Center Parking Garage - 2026

Version: 1 July 22, 2026

Lighting Upgrades at Denver Union Station and Civic Center Parking Garage - 2026 2

1.1 SUMMARY

A. Scope of Work consists of Lighting Upgrades involving LED lamp replacements at Denver Union Station Light Rail Plaza, 1701 Wynkoop St Denver, CO 80202.

Project scope also involves installation of LED retrofit kits for existing fluorescent light fixtures along with new linear LED fixtures at the Civic Center Parking Garage, 1560 Broadway Denver, CO 80202.

B. The Period of Performance is 3 months.

C. The Contractor shall furnish all necessary labor, materials, equipment, supervision, permits and insurance necessary to make the modifications as shown in the IFB construction drawings and specification package.

1.2 TECHNICAL REQUIREMENTS

A. All work shall be performed in strict conformance with all local laws, ordinances, rules and regulations of government authorities having jurisdiction.

B. The Contractor shall visit the job site to review this scope of work as per existing job conditions and determine total quantities of materials, labor and incidental items necessary to complete the work.

C. Carefully lay out all work in advance to eliminate where possible, cutting, channeling, chasing, or drilling of floors, walls, partitions, ceilings and roofs. Any damage to the building, structure, piping, ducts, equipment or any defaced finish shall be repaired by skilled mechanics of the trades involved at no additional cost to the Owner. Any necessary cutting, channeling, drilling or welding as required for the proper support, concealment, installation or anchoring of raceways, outlets, or other electrical equipment shall be performed in a careful manner. All openings made in walls, floors, or ceilings shall be patched and made tight.

D. Contractor shall remove all materials, scrap, etc., relative to the electrical installation, and leave the premises and all equipment in a clean, orderly condition.

E. Upon successful completion of the project, the contractor shall conduct a final walkthrough with building management to ensure satisfaction and proper functionality.

The project shall be officially handed over to the building management, including all relevant documentation.

F. Any work deemed unsatisfactory by building management shall be immediately redone at no additional cost to RTD.

G. Contractor shall support RTD personnel(s) during commissioning to ensure proper functional testing of the lighting controls.