SOO Tinker LAR Bldg 9001.pdf

PDF 162 KB Posted

Attached to
Liquid Argon (LAR) for Anniston Army Depot, AL, Robins AFB, GA and Tinker AFB, OK
Solicitation number
SPE601-21-R-0304
Issued by

View the file

Other files

File Type Posted
SOO Robins LAR.pdf PDF
SOO Anniston Liquid Argon.pdf PDF
SOO Tinker LAR Bldg 3001 and 3221.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TSW – CDSBLD9001 DODAAC – FP8151

STATEMENT OF OBJECTIVES, 3 Apr 20

Scope: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Liquid Argon to Tinker AFB, OK into a Government-owned tank. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Tinker AFB.

Product: Liquid Argon, Type II, Grade A, NSN 9135-01-649-5576, shall meet the requirements of the most current version of MIL-PRF 27415.

No. of Tanks Capacity Type Tank Location Max PSI

1 3000 Above Ground BLDG. 9001 250 psi

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

Product Delivery: Routine product deliveries shall be within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

Expedited/Emergency Delivery:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

Method of Measurement: Method of measurement shall be by truck mounted calibrated flow meter.

Inspection and Acceptance: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

Tank Over-Pressure Protection: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

Tank Hot Fill: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

Security Requirements: Contractor personnel shall provide a valid passport, driver’s license, insurance, vehicle paperwork, and shall be escorted at all times at each destination. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.