Attach_1_-_Drawings_Revised.pdf
PDF 9 MB Posted
- Solicitation number
- SongBldg813
About this file
Attach 1 - Drawings_Revised
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE
BUILDING 813
• MIL-STD 3007
• Unified Facilities Criterion, most current edition particularly the following sections:
• UFC-1-200-01, DoD Building Code (General Building Requirements)
• UFC 1-200-02, High Performance and Sustainable Building Requirements
• UFC 3-101-01, Architecture
• UFC 3-110-03, Roofing
• UFC 3-120-01, Interior Design
• UFC 3-120-01 Air Force Sign Standards
• UFC 3-201-01, Civil Engineering
• UFC 3-201-02, Landscape Architecture
• UFC 3-220-01, Geotechnical Engineering
• UFC 1-300-09N Design Procedures
• UFC 3-301-01, Structural Engineering
• UFC 3-310-04, Seismic Design for Buildings
• UFC 3-401-01, Mechanical Engineering
• UFC 3-410-01, Heating, Ventilating, and Air Conditioning
• UFC 3-420-01, Plumbing Systems
• UFC 3-501-01, Electrical Engineering
• UFC 3-520-01, Interior Electrical Systems
• UFC 3-530-01, Interior and Exterior Lighting Systems and Controls
• UFC 3-550-01, Exterior Electrical Power Distribution
• UFC 3-560-01, Electrical Safety, O&M
• UFC 3-575-01, Lightning and Static Electricity Protection Systems
• UFC 3-580-01, Telecommunications Building Cabling Systems Planning and Design
• UFC 3-600-01, Fire Protection Engineering for Facilities
• UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings
• UFC 4-021-01, Design and O&M: Mass Notification Systems
• International Building Code 2015 (IBC)
• International Existing Building Code 2015 (IEBC)
• NFPA 54 (ANSI Z223.1), National Fuel Gas Code
• National Electrical Code 2017
• AFRC Facility Energy Policy of 2011
• Current AT/FP standards as applicable
• ABA Standards with special provisions of the Department of Defense Deputy
Secretary of Defense Memorandum Subject: Access for People with Disabilities, October 31, 2008.
• Dobbins ARB Design Guide, August 2011
• Occupational Safety and Health Aministration (OSHA)
• American National Standards Institute (ANSI)
• ASTM
• Local Authority Having Jurisdiction (AHJ), being the component office of responsibility – in this case, the U.S. Air Force (AFCEC)
• Public Laws (P.L.) and Executive Orders (E.O.)
• Code of Federal Regulations (CFR)
• Department of Defense Instructions (DoDI)
• Department of Defense Manuals (DoDM)
• Department of Defense Directives (DoDD)
• Other higher authority documents as applicable, as listed in MIL-STD-3007F, Appendix B
• 28 CFR Part 36 Americans with Disabilities Act
APPLICABLE CODES:
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2019-02-07
2/ 8/
:2
5:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
G-001
C O
V E
R S
H E
E T
2018-150
J. RYAN
J. MORGAN
Repair Interior and Exterior Community Center Facility
FGWB 16-0031 BUILDING 813
DOBBINS AIR RESERVE BASE, GA
DRAWING INDEX
NUMBER S
H
E E
T
O F
S H
E E
T S
SHEET NAME IS
S
A
8-
-2
S
U B
M
IT
T A
L
IS
S
B
8-
-0
S
U B
M
IT
T
L
IS
C
8-
-0
S
U B
M
IT
T A
L
IS
S
D
8-
-2
0% S
U B
M
IT
T A
L
-0 2-
C
O M
M E
N T
S
GENERAL
G-001 1 COVER SHEET X X X X X
G-002 2 GENERAL INFORMATION X X X X X
LS101 3 OVERALL LIFE SAFETY PLAN X X X X X
ARCHITECTURAL DEMOLITION
AD101 4 DEMOLITION PLAN X X X X X
AD131 5 DEMOLITION REFLECTED CEILING PLAN X X X X X
AD201 6 DEMOLITION ELEVATIONS X X X X X
ARCHITECTURAL
A-001 7 PARTITION TYPES X X X X X
A-101 8 PROPOSED FLOOR PLAN X X X X X
A-131 9 REFLECTED CEILING PLAN X X X X X
A-151 10 ROOF PLAN X X X X
A-201 11 OVERALL EXTERIOR ELEVATIONS X X X X X
A-311 12 WALL SECTIONS X X X X
A-351 13 SECTION DETAILS X X X X
A-352 14 SECTION DETAILS X X X X
A-400 15 STANDARD RESTROOM DETAILS X X X X
A-401 16 ENLARGED PLANS & PLAN DETAILS X X X X
A-601 17 DOOR SCHEDULE, WINDOW, & DETAILS X X
INTERIORS
I-001 18 ROOM FINISH SCHEDULE & FINISH MATERIALS X X X X
I-101 19 FLOOR FINISH PLAN X X X X X
I-751 20 STANDARD MILLWORK DETAILS X X X X X
IS101 21 INTERIOR SIGNAGE - FIRST FLOOR X X
IS701 22 INTERIOR SIGNAGE SCHEDULE & LEGEND X X
PLUMBING DEMOLITION
PD101 23 DEMOLITION PLAN X X X X X
PLUMBING
P-101 24 NEW WORK PLAN X X X X X
P-501 25 PLUMBING DETAILS & SCHEDULES X X X X X
MECHANICAL DEMOLITION
MD101 26 DEMOLITION PLAN X X X X X
MECHANICAL
M-101 27 NEW WORK PLAN X X X X X
M-501 28 MECHANICAL DETAILS & SCHEDULES X X X X X
M-701 29 IO POINTS LIST & CONTROL DIAGRAMS X X X
ELECTRICAL DEMOLITION
ED101 30 ELECTRICAL DEMOLITION PLAN X X X X X
ELECTRICAL
E-100 31 ELECTRICAL GENERAL NOTES X X X X X
E-101 32 LIGHTING PLAN X X X X X
E-102 33 POWER & SYSTEMS PLAN X X X X X
E-103 34 LIGHTING PROTECTION PLAN X X X X X
E-501 35 ELECTRICAL SCHEDULES X X X X X
E-502 36 ELECTRICAL DETAILS X X X
Grand total: 36
N.T.S.
G-001
VICINITY MAP
N.T.S.
G-001
PROJECT LOCATION
PLAN
NORTH
PLAN
NORTH
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
C 2018-11-02 95% SUBMITTAL
D 2018-12-20 100% SUBMITTAL
1 2019-02-07 100% COMMENTS
MATCH LINE MARK
SPECIFIC KEY NOTES
SHEET NOTE
DETAIL NUMBER
ELEVATION NUMBER
DRAWING NUMBER
SHEET NO. (WHERE SHOWN)
ELEVATION NUMBER
COLUMN LINE NUMBER
ROOM NUMBER AND LEVEL
SHEET NO. (WHERE SHOWN)
PARTITION TYPE
DOOR NUMBER
ELEVATION MARKS
WINDOW TYPE
GRID LINE
095100.A1
W1
A1
A101
A1
A101 A1
A101
LEGENDS & SYMBOLS:
SECTION NUMBER
A101
A1
A*
BUILDING SECTION
DETAIL
EXTERIOR ELEVATION
TITLES
INTERIOR ELEVATION
INDICATES WINDOW ABOVE
SHEET NO. (WHERE SHOWN)
SHEET NO. (WHERE SHOWN)
ROOM NAME NAME
A101
A1
SHEET NO. (WHERE SHOWN)
SECTION NUMBER
A101
A1
WALL SECTION
SHEET NO. (WHERE SHOWN)
COLUMN GRID
16. UNLESS OTHERWISE NOTED, ELECTRICAL CONDUITS,
PLUMBING LINES, ETC., SHALL BE RUN CONCEALED AND
FRAMING SHALL BE ADEQUATE SIZE TO ACCOMPLISH RESULT
WITHOUT CAUSING ANY CHANGES IN THE WALL PLANE.
17. COORDINATE WITH ALL TRADES THE LOCATIONS OF SLEEVES
OR OTHER PRESET ACCESSORIES INVOLVING OTHER TRADES.
18. THESE PLANS SHOULD BE STUDIED AND USED IN THEIR
ENTIRETY AS INFORMATION VITAL TO EACH STAGE OF
CONSTRUCTION
19. GENERAL CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE
FOR COMPLETION OF ALL WORK SHOWN OR REASONABLY
IMPLIED BY THESE DRAWINGS AND / OR SPECIFICATIONS. HE
SHALL CONFIRM ALL DIMENSIONS AND CONDITIONS AT THE
SITE AND SHALL IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) IN WRITING OF ANY
DISCREPANCIES.
20. CONTRACTING OFFICER'S REPRESENTATIVE (COR) IS NOT
RESPONSIBLE FOR EQUIPMENT OR MATERIALS NOT SPECIFIED
ON THESE PLANS.
21. DIMENSIONS ON FLOOR PLANS ARE FROM FACE OF STUD AT
EXTERIOR WALLS AND TO THE FACE OF GWB OF INTERIOR
WALLS UNO, BEAMS AND GIRDERS ARE DIMENSIONED TO THE
CENTERLINE UNO.
22. DETAILS TAKE PRECEDENCE OVER PLANS & ELEVATIONS -
LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER SMALLER
SCALE DRAWINGS.
1. THE GENERAL CONTRACTOR SHALL FURNISH COPIES OF PERMITS,
INSPECTIONS, AND CERTIFICATES TO THE CONTRACTING OFFICER (CO) AS
REQUESTED ALONG WITH FIRST APPLICATION FOR PAYMENT.
2. THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) SHALL BE
RESPONSIBLE FOR OBTAINING ALL REQUIRED BUIDLING PERMIT
APPROVALS AND HEALTH DEPARTMENT APPROVALS.
3. NOT USED
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL
CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS FOR
ACCURACY AND CONFIRMING THAT WORK IS BUILDABLE BEFORE
PROCEEDING WITH CONSTRUCTION - IF THERE ARE ANY QUESTIONS
REGARDING THIS OR OTHER COORDINATION QUESTIONS, THAT
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING. CLARIFICATION
FROM CONTRACTING OFFICER'S REPRESENTATIVE (COR) BEFORE
PROCEEDING WITH WORK IN QUESTION OR RELATED WORK IN
SUFFICIENT TIME FOR CONTRACTING OFFICER'S REPRESENTATIVE (COR)
TO RENDER A DECISION WITHOUT DELAYING THE PROGRESS OF THE
PROJECT.
5. THE CONTRACTOR SHALL VERIFY THAT NO CONFLICTS EXIST IN
LOCATIONS OF ANY AND ALL MECHANICAL, ELECTRICAL & PLUMBING (TO
INCLUDE ALL PIPING, DUCTWORK, AND CONDUIT) AND THAT ALL
REQUIRED CLEARANCES FOR INSTALLATION AND MAINTENANCE OF
ABOVE EQUIPMENT IS PROVIDED - NOTIFY CONTRACTING OFFICER'S
REPRESENTATIVE (COR) SO THAT ANY CONFLICTS WILL BE MUTUALLY
RESOLVED.
1. "ALIGN" MEANS (I.E.) WHERE A NEW PARTITION IS TO BE BUILT TO ALIGN
WITH ONE SIDE OF THE COLUMN, STUDS SHALL ALIGN WITH THE COLUMN
OR EXISTING PARTITION SO THAT THE GYPSUM WALL BOARD WILL BE
CONTINUOUS ACROSS STUDS AND FINISHED FACE OF COLUMN OR
EXISTING PARTITION, AND JOINT SHALL BE SMOOTH AND UNDETECTABLE.
2. DIMENSIONS NOTED AS "CLEAR" SHALL BE FROM FINISHED FACE TO
FINISHED FACE.
3. "TYPICAL" MEANS TYPICAL FOR ALL SIMILAR CONDITIONS, UNO.
4. WHEREVER THE TERM "OR EQUAL" IS USED, IT SHALL MEAN EQUAL
PRODUCT AS APPROVED BY CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
DEFINITIONS:
CONTRACTOR'S AND SUBCONTRACTOR'S
RESPONSIBILITIES:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE SUPERVISION
AND COORDINATION OF ALL CONSTRUCTION PROCEDURES
2. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE
WITH THE APPLICABLE CODES AND ORDINANCES IN EFFECT AT
THE TIME OF PERMIT. IN THE EVENT OF A CONFLICT, THE
MORE STRINGENT REQUIREMENT SHALL GOVERN AND BE MET
3. ALL DIMENSIONS MUST BE VERIFIED BY THE CONTRACTOR AND
THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) MUST
BE NOTIFIED OF ANY DISCREPANCIES BEFORE PROCEEDING
WITH THE WORK.
4. COORDINATE LOCATIONS AND/OR ELEVATIONS OF FLOOR
DRAINS, REGISTERS, GRILLES, LOUVERS, DUCTS, UNIT
HEATERS, PANELS, ETC. WITH MECHANICAL AND ELECTRICAL
CONTRACTORS AND ARCHITECTURAL DRAWINGS
5. WHERE A DETAIL IS SHOWN FOR ONE CONDITION, IT SHALL
APPLY TO ALL LIKE OR SIMILAR CONDITIONS, EVEN THOUGH
NOT SPECIFICALLY MARKED ON THE DRAWINGS
6. CONTRACTOR SHALL ENSURE THAT CONSTRUCTION
ENVIRONMENT IS MAINTAINED IN SUCH A WAY TO INHIBIT MOLD
AND MILDEW GROWTH
7. PROVIDE FINISHED SURFACE UNDER AND BEHIND ALL
EQUIPMENT AND CASEWORK
8. CONTRACTOR SHALL REMOVE PROMPTLY AND LEGALLY ALL
ACCUMULATED DEBRIS, PROTECT ALL EXPOSED PORTIONS OF
WORK FROM ELEMENTS, AVOID OVER- LOADING STRUCTURE,
AND SECURELY STORE ALL ITEMS TO BE USED FOR
CONSTRUCTION
9. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING
UNDERGROUND UTILITIES PRIOR TO EXCAVATION.
10. THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONARY MEASURES TO PROTECT THE PUBLIC AND
ADJACENT PROPERTIES FROM DAMAGE THROUGHOUT
CONSTRUCTION
11. ANY EXISTING UTILITIES TO BE ABANDONED SHALL BE
PROPERLY DISCONNECTED, PLUGGED OR CAPPED, AS
REQUIRED BY CODE OR SOUND CONSTRUCTION PRACTICE.
12. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS OR SPECIFICATIONS WITHOUT FIRST
SECURING WRITTEN PERMISSION FROM THE CONTRACTING
OFFICER'S (CO).
13. WHERE LACK OF INFORMATION, OR ANY DISCREPANCY
SHOULD APPEAR IN THE DRAWINGS OR SPECIFICATIONS,
REQUEST WRITTEN INTERPRETATION FROM THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK.
14. PROVIDE ADEQUATE CONCEALED BLOCKING AND ANCHORING
FOR ALL CEILING AND WALL MOUNTED EQUIPMENT,
HARDWARE AND ACCESSORIES.
15. WHEN A SYSTEM OR ASSEMBLY IS SPECIFIED, ALL NECESSARY
PARTS AND MATERIALS REQUIRED FOR A COMPLETE
INSTALLATION / SYSTEM SHALL BE INSTALLED ACCORDING TO
THE MANUFACTURERS INSTRUCTIONS.
GENERAL NOTES:
@ AT
AVG AVERAGE
AUTO AUTOMATIC
ARCH ARCHITECT (URAL)
ANOD ANODIZED
ALUM ALUMINUM
ALT ALTERNATE
A/C AIR CONDITIONING
ADMIN ADMINISTRATION
ABV ABOVE
AG AMERICANS W/ DISABILITIES
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ACT ACOUSTICAL TILE
BM BEAM
BRG BEARING
BOT BOTTOM
BLDG BUILDING
CAB CABINET
CARP CARPET
CJ CONTROL JOINT
CLG CEILING
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
CONST CONSTRUCTION
CONC CONCRETE
CONT CONTINUOUS
CW COMPOSITE WOOD
DEM DEMOLISH, DEMOLITION
DN DOWN
DBL DOUBLE
DIFF DIFFUSER
DIA DIAMETER
DIM DIMENSION
DTL DETAIL
DWG DRAWING
EA EACH
ENCL ENCLOSE (URE)
ELEC ELECTRICAL
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EP ELECTRICAL PANEL
EL, ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRICAL WATER COOLER
EXT EXTERIOR
EXIST EXISTING
EXP J EXPANSION JOINT
FD FIELD DETERMINE
FFE FINISHED FLOOR ELEVATION
FFL FINISHED FLOOR LINE
FE FIRE EXTINGUISHER
FRP FIBER REINFORCED PANEL
FT FOOT/FEET
FRT FIRE RETARDANT TREATED
FLUOR FLUORESCENT
FTG FOOTING
GEN GENERAL
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GWB GYPSUM WALL BOARD
HDWR HARDWARE
HVAC HEATING, VENTILATION & AIR CONDITIONING
HC HANDICAP
HCB HANDICAP COUPON BOOTH
HGT HEIGHT
H HIGH
HM HOLLOW METAL
HORIZ HORIZONTAL
INSUL INSULATION
INT INTERIOR
ID INSIDE DIAMETER
JAN JANITOR
LBL LABEL
LAV LAVATORY
L LONG
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
MAX MAXIMUM
NIC NOT IN CONTRACT
MAINT MAINTENANCE
MAT MATERIAL
MCG METAL CORNER GUARD
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
MIN MINIMUM
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPP OPPOSITE
OS OVERFLOW SCUPPER
PREFAB PREFABRICATED
PL PLATE
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PT PRESSURE TREATED
QTY QUANTITY
REINF REINFORCE (D) (ING)
R, RAD RADIUS
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
SHT SHEET
SPK SPEAKER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STRUCT STRUCTURAL
ST STEEL TUBE
STL STEEL
STO STORAGE
SUSP SUSPENDED
TEMP TEMPERED
TE TOP ELEVATION
TEL TELEPHONE
TV TELEVISION
THK THICK
TBD TO BE DETERMINED
T & G TONGUE & GROOVE
TOB TOP OF BEAM
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VAR VARIES
VERT VERTICAL
VIF VERIFY IN FIELD
VCT VINYL COMPOSITION TILE
ABBREVIATIONS:
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2018-12-20
2/ 8/
:2
5:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
G-002
G E
N E
R A
L I
N F
O R
M A
T
IO
N
2018-150
J. RYAN
J. MORGAN
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
C 2018-11-02 95% SUBMITTAL
P 320 R 144
R P 160
TRAV DIST 1
TRAV DIST 3
CONFERENCE
ROOM
FOYER AREA
WOMEN
MEN
NEW VISITOR
LOUNGE
NEW
ELECTRICAL
NEW OFFICE
NEW STORAGE
FOLDING PARTITIONS
STORAGE
JAN.
OFFICE
STORAGE
STORAGE
STORAGE
RESTROOM
CLOSET
STORAGE
JAN.
REF. GARBAGE
MECHANICAL
ROOM
R P 160
R P 160
PH
TRAV DIST 2
NEW IT CLOSET
1007A
100 OCCUPANTS / EACH = 2 EXITS / EACH,
WITH PANIC DEVICES
DOOR SWING IN DIRECTION OF EGRESS
C
FACP
F
FEC
LIFE SAFETY LEGEND:
1-HOUR FIRE RATED WALL
1-HOUR FIRE & SMOKE RATED WALL
2-HOUR FIRE RATED WALL
2-HOUR FIRE & SMOKE RATED WALL
SMOKE RATED WALL
EXIT SIGN
FIRE ALARM PULL STATION
FIRE ALARM STROBE
FIRE ALARM HORN
FIRE ALARM HORN/STROBE
FIRE ALARM CONTROL PANEL
SMOKE DETECTOR
CO2 DETECTOR
EMERGENCY LIGHT
TRAVEL DISTANCE
FIRE EXTINGUISHER & CABINET
FIRE EXTINGUISHER & BRACKET
DOOR RATING (MINUTES)
TRAVEL DISTANCE TO FEC
DOOR EGRESS LOAD TAG
P = PROVIDED R = REQUIRED
PANIC HARDWARE
FEB
S
R P 160
PH
CODE RESEARCH:
GROUP A-3
ASSEMBLY TYPE IIB
TYPE II(000)
OCCUPANCY CLASSIFICATION & TYPE OF CONSTRUCTION
INTERNATIONAL
BUILDING CODE
EDITION
NFPA 101
APPLICABLE CODE OCCUPANCY CLASS. TYPE OF CONST.
2018 EDITION
THIS BUILDING IS NON-SPRINKLERED
HEIGHT / STORY(S) / AREA / PERIMETER
HEIGHT STORY(S) AREA PERIM.
ALLOW.
PROVIDED
UNLIM.
PER IBC TABLE 503 (2015)
UNLIM.
(W/ OUT
INCREASES)
ALLOW. (W/
INCREASES)
SPRINKLER INCREASE
NOT USED
FRONTAGE INCREASE
NOT USED
TOTAL HGT & STORY(S) INCREASE
NOT USEDNOT USED
TOTAL AREA INCREASE
NOT USED
75'-0" 4 23000 SF
PER IBC 506.2 (2015)
IBC EQUATION 5-2
55'-0"
18'-0" 1300'-0"
3 23000 SF
10900 SF1
ASSEMBLY
EXITS PROVIDED
SIZE # OF DOORS NUMBER OF OCCUPANTS
= 1120 OCC. PROVIDED FOR@ 160 OCC/ DR7 DOOR(S)3'-0"
PROVIDED AREA
TOTAL REFERS TO
FIRST FLOOR
(LARGEST FLOOR)
1. PER BASE FIRE MARSHAL DIRECTION - ALL FIRE
EXTINGUISHERS ARE TO BE REMOVED FROM FACILITY
NOTE:
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2018-12-20
2/ 8/
:2
6:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
LS101
O V
E R
A L
L L
IF
E
S A
F E
T Y
P L
A N
2018-150
J. RYAN
J. MORGAN
0 5 25 FT10
1/8" = 1'-0"
LS101
LIFE SAFETY PLAN
TRAVEL DISTANCES
PATH TOTAL DISTANCE MAX
TRAV DIST 1 52'-6" 250'
TRAV DIST 2 62'-6" 250'
TRAV DIST 3 74'-2" 250'
OCCUPANT LOAD TABLE
OCCUPANCY AREA OCC. FACTOR OCC. LOAD
37 SF 0
ASSEMBLY 3758 SF 15 SF 251
BUSINESS 218 SF 100 SF 2
CIRCULATION 370 SF 0 SF 0
CLOSET 14 SF 0 SF 0
ELECTRICAL 37 SF 0 SF 0
MECHANICAL 725 SF 0 SF 0
OTHER 518 SF 0 SF 0
STORAGE 2253 SF 7
7929 SF 260
PLAN
NORTH
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
AD201
AD201
AD201
AD201
1002 1003
3 4
25 25
4 4
10131012
13 13
1017 1018
REMOVE FIXTURES AS
INDICATED - SEE PLUMBING
REMOVE LOW WALLS
AND FLOWER BED
EXISTING RAMP AND
RAILING TO REMAIN
EXISTING RAMP AND
RAILING TO REMAIN
EXISTING STAIR AND
RAILING TO REMAIN
REMOVE CEMENT
PLANTERS
PREP FLOOR TO
RECEIVE NEW FLOOR
FINISH
EXISTING CONCRETE PLANTING BED TO REMAIN
EXISTING CONCRETE
PLANTING BED TO REMAIN
R E
M O
V E
C O
N C
W
A L K
W A
Y
REMOVE CONC. WALKWAY
EXISTING CONC.
WALKWAY TO REMAIN
EXISTING RAMP AND
RAILING TO REMAIN
EXISTING RAMP AND
RAILING TO REMAIN
EXISTING STAIR AND
RAILING TO REMAIN
EXISTING CONC. WALKWAY
TO REMAIN
REMOVE RAILING
REMOVE CONC. WALKWAY
E X
IS
T
IN
G
C O
N C
W
A L K
W A
Y T
O R
E M
A
IN
EXISTING RAMP
TO REMAIN
6 6
22 FEB
FEC
FEC
DEMO EXISTING EQUIPMENT PLAN
PRESSURE WASH
24 24
DEMO EXISTING CONCRETE /
RAMP AS REQUIRED FOR
INSTALLATION OF NEW WALL
1. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR)
IMMEDIATELY OF DISCREPANCIES BEFORE PROCEEDING WITH THE
WORK.
3. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
4. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) FOR ANY LACK OF OR
AMBIGUITY OF INFORMATION IN THE DRAWINGS PRIOR TO
PROCEEDING WITH THAT PORTION OF THE WORK.
GENERAL NOTES:
LEGEND:
EXISTING WALL TO BE DEMOLISHED
EXISTING WALL TO REMAIN
EXISTING DOOR TO BE DEMOLISHED
Croft & Associates
3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
L
IF
T W
IN
G
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G E
O R
G
IA
P R
O
JE
C T
L O
C A
T
IO
N
D R
A W
IN
G
C O
N T
A C
T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N T
A C
T
R O
B E
R T
E R
N S
T
D S
N
-3 ro b e rt
.e rn st .5 u s.
a f.
m il
R E
P A
IR
F
A C
IL
IT
Y
B U
IL
D
IN
G
F
G W
B
-0
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G E
O R
G
IA
J. MORGAN
C o p yr ig h t b y C ro ft
A ss o ci a te s, P
C A ll ri g h ts r e se rv e d T h is d o cu m e n t is p ro p e rt y o f C ro ft
A ss o ci a te s, P
C I t is t o b e u se d o n ly f o r th e s p e ci fic p ro je ct r e fe rr e d t o o r id e n tif ie d h e re in a n d is n o t to b e u se d o n o th e r p ro je ct s, in w h o le o r in p a rt e xc e p t b y th e e xp re ss w ri tt e n a g re e m e n t o f
C ro ft
A ss o ci a te s, P
C
2019-02-07
/3
/2
:2
:5
A
M C
U s e rs
\T im
\D o c u m e n ts
\2
-1
D
O B
B
IN
S A
R B
A
C
E N
T R
A L tr id le y Q
Z R
Q .r v t
AD101
D E
M O
L
IT
IO
N
P L
A N
2018-150
J. RYAN
J. MORGAN
KEYNOTES - DEMO PLAN
1 REMOVE EXISTING STOREFRONT SYSTEM & PREP FOR NEW WALL.
CONTRACTOR SHALL PROVIDE TEMPORARY WEATHERPROOF BARRIER
WHILE NEW WALL CONSTRUCITON IS IN PROGRESS. DETAILS FOR
WEATHER PROOF BARRIER SHALL BE PROVIDED TO THE CO FOR
APPROVAL PRIOR TO CONSTRUCTION.
2 REMOVE EXISTING DOOR & FRAME & ASSOCIATED HARDWARE
3 REMOVE EXISTING FLOOR FINISH & BASE IN THIS ROOM
4 REMOVE EXISTING ACOUSTICAL CEILING IN THIS ROOM. SEE AD131
5 REMOVE EXISTING CONCRETE WALKWAY
6 REMOVE COUNTER TOP, BASE CABINETS, AND SINK
7 REMOVE EXISTING SCREEN WALL AND FOOTINGS. PREP FOR NEW
SCREEN WALL AND FOOTINGS
8 REMOVE WINDOW AND FRAME AND PREP FOR NEW DOOR OPENING
9 REMOVE EXISTING WINDOW & FRAME, REMOVE CUT CMU BLOCKS FROM
EXISTING OPENING TO ALLOW FOR PLACEMENT OF WHOLE BLOCK
TOOTHED INFILL
10 REMOVE EXISTING STEPS
11 REMOVE EXISTING FRAME AND CUT CMU BLOCKS FROM EXISTING
OPENING TO ALLOW FOR PLACEMENT OF WHOLE BLOCK INFILL
12 REMOVE EXISTING INSIGNIA ON WALL. REPAIR AS REQUIRED
13 REMOVE EXISTING BLINDS
14 REMOVE EXISTING HALF WALL
15 REMOVE EXISTING DECORATIVE CEILING STEP DOWN HEADER
16 REMOVE AIR CURTAIN ABOVE DOOR AND REPLACE WITH WINDOW
17 REMOVE TREES, STUMPS AND ROOTS LOCATED AT THE SOUTH SIDE OF
BUILDING. FILL AREA AND SEED TO MATCH SURROUNDING GRASS
19 REMOVE EXISTING HVAC SYSTEM - SEE MECHANICAL DRAWINGS
20 REMOVE WALL TILES ON ALL WALLS
21 REMOVE FIRE EXTINGUISHER AND CABINET
22 REMOVE FIRE EXTINGUISHER AND BRACKET
23 REMOVE DESIGNATED PORTION OF THURN DOWN FLOOR SLAB
24 AFTER DEMOLITION OF FLOOR TILE IN NOTE 3, CONTRACTOR SHALL
DEMO SLAB AS REQUIRED FOR INSTALLATION OF SLOPING SLAB AS
INDICATED ON FLOOR PLAN 1/A101
25 REMOVE EXISTING FLOOR SLAB TO FACILITATE INSTALLATION OF NEW
SLOPING FLOOR SLAB AND FLOOR DRAINS. SEE A-101 FLOOR PLAN FOR
EXTENT.
PLAN
NORTH
0 5 25 FT10
1/8" = 1'-0"
AD101
DEMOLITION FLOOR PLAN
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
C 2018-11-02 95% SUBMITTAL
1002 1003
1017 1018
1 TYP
1TYP
1 TYP
1 1
9'-0" 9'-0"
9'-0"
9'-0"
12'-0"
9'-0"
9'-0"
8'-0"
8'-0"9'-0" 9'-0"
9'-0"
9'-0"
9'-0"
9'-0" 9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
TYP
TYP
4 4
2' x 2' PARABOLIC LIGHT
2' x 4' PARABOLIC LIGHT
6" RECESSED CAN LIGHT
STRIP LIGHT
RCP LEGEND:
2' x 2' ACT GRID
GWB CEILING
2' x 2' SUPPLY DIFFUSER
2' x 2' RETURN REGISTER
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2018-12-20
2/ 8/
:2
5:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
AD131
D E
M O
L
IT
IO
N
R E
F L
E C
T E
D C
E
IL
IN
G
P L
A N
2018-150
J. RYAN
J. MORGAN
0 5 25 FT10
1/8" = 1'-0"
AD131
DEMOLITION REFLECTED CEILING PLAN
PLAN
NORTH
KEYNOTES - DEMO REFLECTED CEILING PLAN
1 DEMOLISH EXISTING LIGHT FIXTURES, SUPPLY & RETURN DIFFUSERS,
AND EXHAUST GRILLS
2 EXISTING SOFFIT TO REMAIN. PRESSURE WASH, PRIME, AND PREP FOR
NEW PAINT
3 REMOVE EXISTING DECORATIVE CEILING STEP DOWN
4 EXISTING LIGHT FIXTURE LOCATION. PROTECT FIXTURE DURING
PRESSURE WASHING AND PAINTING.
NOTE: PRESSURE WASH EXTERIOR FACADE WITHIN SCOPE OF
PROJECT
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
FIRST FLOOR
0'-0"
3TYP
76 8TYP
TOP OF JOIST
12'-2 1/2"
TOP OF JOIST 2
16'-3"
FIRST FLOOR
0'-0"
3 TYP
8TYP
TOP OF JOIST
12'-2 1/2"
TOP OF JOIST 2
16'-3"
FIRST FLOOR
0'-0"
3TYP
TOP OF JOIST
12'-2 1/2"
TOP OF JOIST 2
16'-3"
FIRST FLOOR
0'-0"
T/O NAILER - HIGH
ROOF
16'-9"
3TYP
TOP OF JOIST
12'-2 1/2"
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2018-12-20
2/ 8/
:2
5:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
AD201
D E
M O
L
IT
IO
N
E L
E V
A T
IO
N
S
2018-150
J. RYAN
J. MORGAN
KEYNOTES - DEMO ELEVATION
1 REMOVE EXISTING STOREFRONT SYSTEM & PREP FOR NEW WALL.
CONTRACTOR SHALL PROVIDE TEMPORARY WEATHERPROOF BARRIER
WHILE NEW WALL CONSTRUCITON IS IN PROGRESS. DETAILS FOR
WEATHER PROOF BARRIER SHALL BE PROVIDED TO THE COR FOR
APPROVAL PRIOR TO CONSTRUCTION.
2 REMOVE EXISTING SCREEN WALL
3 PRESSURE WASH EXISTING ENTIRE BUILDING FACADE AND PREP
STUCCO SURFACES FOR REPAINTING
4 REPAIR EXTERIOR FINISHES, SAND EXISTING FINISH & RE-APPLY NEW
STUCCO FINISH TO MATCH EXISTING.
5 REMOVE EXISTING RAILING UNDER MAIN ENTRANCE CANOPY
6 REMOVE EXISTING STEPS
7 REMOVE EXISTING INSIGNIA ON WALL. REPAIR IF NEEDED.
8 EXTERIOR WINDOWS TO BE THROUGHLY CLEANED
9 WATERPROOF ENCLOSURE AFTER REMOVING EXISTING STOREFRONT
SYSTEM
0 5 25 FT10
1/8" = 1'-0"
AD201
DEMOLITION ELEVATION - SOUTH
0 5 25 FT10
1/8" = 1'-0"
AD201
DEMOLITION ELEVATION - EAST
0 5 25 FT10
1/8" = 1'-0"
AD201
DEMOLITION ELEVATION - NORTH
0 5 25 FT10
1/8" = 1'-0"
AD201
DEMOLITION ELEVATION - WEST
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
LINE OF
STRUCTURE
CAULK, BOTH
SIDES
REFER TO PARTITION
HEAD DETAILS FOR
RATED OR NON-RATED
CONDITIONS
LINE OF
CEILING
LINE OF
STRUCTURE
PLAN
CMU
CMU
CMU
*NON RATED BLOCKS ASSUMED TO BE HOLLOW, NORMAL WEIGHT
BLOCK, NON STRUCTURAL.
**RATED BLOCKS ASSUMED TO BE PERLITE LOOSE CAVITY FILL
SOUND CAULK,
BOTH SIDES
LINE OF
STRUCTURE
METAL RUNNER
5/8" GYPSUM
BOARD, EACH SIDE
CAULK, BOTH SIDES
METAL RUNNER
REFER TO PARTITION
HEAD DETAILS FOR RATED
OR NON-RATED
CONDITIONS
REFER TO SCHEDULE
BELOW FOR PARTITION
WIDTH
WIDTH
LINE OF
CEILING
LINE OF
STRUCTURE
ADDITIONAL 5/8" GYPSUM
BOARD, EACH SIDE. FOR
FIRE RATING PER
SCHEDULE BELOW
M A
R K
S T
U D
W
ID
T
H
G W
B T
H K
(L
Y
E R
P E
E
P A
R T
N
W
T H
UL
LISTING S
T
CFIRE
RATING
G2
G3
G6
G4
2-1/2" 5/8" 3-3/4" NA 38
3-5/8" 5/8" 4-7/8" U407 42
4" 5/8" 5-1/4" U407 NA
6" 5/8" 7-1/4" U407 NA
G8 8" 5/8" 9-1/4" U407 NA
1G3 3-5/8" 5/8" 4-7/8" U419 49
1G4 4" 5/8" 5-1/4" U419 49
1G6 6" 5/8" 7-1/4" U419 49
1G8 8" 5/8" 9-1/4" U419 49
2G3 3-5/8" (2) 5/8" 6-1/8" U419 54
2G4 4" (2) 5/8" 6-1/2" U419 54
2G6 6" (2) 5/8" 8-1/2" U419 54
2G8 8" (2) 5/8" 10-1/2" U419 54
3G3 3-5/8" (3) 5/8" 7-3/8" U419 59
3G4 4" (3) 5/8" 7-3/4" U419
3G6 6" (3) 5/8" 9-3/4" U419 59
NA
.5 HR
.5 HR
.5 HR
.5 HR
1 HR
1 HR
1 HR
1 HR
2 HR
2 HR
2 HR
2 HR
3 HR
3 HR
3 HR
3G8 8" (3) 5/8" 11-3/4" U419 593 HR
PARTITION TYPE 'G'
PLAN 1G3BS1
SOUND ATTENUATION BLANKETS
(SAB), (WHERE APPLICABLE)
PARTITION HEAD CONDITION
STUD SIZE (SEE STUD OR CMU
WIDTH SCHEDULE)
PARTITION TYPE (SEE PARTITION
TYPES ON THIS SHEET)
FIRE RATING (WHERE APPLICABLE)
PARTITION TYPE NOMENCLATURE
UNIQUE PARTITION TYPE
IDENTIFIER (WHERE APPLICABLE)
PARTITION TYPES
C
F
H
G
CHASE
FURRING
GYPSUM WALLBOARD
HYBRID
M MASONRY
P PANEL - EX. METAL WALL PANEL
S SHAFT
T TEMPORARY
W WOOD
NUMBER
CHARACTER
METAL
STUD
WIDTH
WOOD
STUD
WIDTH
CMU
WIDTH
REMARKS
PARTITION METAL / WOOD STUD OR CMU WIDTH
7/8" NA 7/8" FURRING CHANNEL
1-5/8" NA
2-1/2" 1-1/2" CMU = SOAP BLOCK
3-5/8" 2-1/2"
4 4" 3-1/2"
6 6" 5-1/2"
8 8" 7-1/4"
10 10" 9-1/4"
12 12" 11-1/4"
NA
NA
1-5/8"
NA
3-5/8"
5-5/8"
7-5/8"
9 5/8"
11-5/8"
PARTITION HEAD CONDITION DESIGNATOR
A
B
D
C
PARTITION TO BOTTOM OF STRUCTURAL ROOF OR
FLOOR DECK ABOVE
PARTITION TO 6" ABOVE CEILING - EXTEND METAL
STUD TO STRUCTURE PER SPECIFICATIONS
PARTITION TO BOTTOM OF CEILING ABOVE
PARTIAL HEIGHT PARTITION - SEE FLOOR PLAN FOR
HEIGHT
UNIQUE PARTITION TYPE IDENTIFIER
1 SOUND ATTENUATING BLANKETS
TE=3'-6"
TOP OF PARTIAL HEIGHT PARTITION
(PARTITION HEAD CONDITION 'D')
(WHERE APPLICABLE)
1. "LINE OF STRUCTURE" INDICATED FOR EACH PARTITION IS DIAGRAMMATIC
ONLY AND DOES NOT INDICATE EXACT CONSTRUCTION CONDITIONS OR
GEOMETRY.
2. ALL DIMENSIONS ARE FROM FACE OF GYPSUM BOARD TO FACE OF
GYPSUM BOARD. REFER TO PARTITION TYPE FOR PARTITION WIDTH
DIMENSIONS UNLESS NOTED OTHERWISE TO BE SHOWN ON PLAN.
3. CAULK:
A. FIRE RESISTANCE RATED PARTITIONS SHALL USE RATED FIRE /
SMOKE RESISTANT FILL MATERIAL IN CONJUNCTION WITH AN
APPROPRIATE RATED FIRE / SMOKE FIRE STOPPING SYSTEM.
B. NON-RATED PARTITIONS AND NON-RATED SMOKE RESISTANT
PARTITIONS SHALL USE ACOUSTICAL CAULK.
6. INSULATION:
A. FIRE RESISTANCE RATED PARTITIONS SHALL USE MINERAL
INSULATION.
B. NON-RATED PARTITIONS REQUIRING SOUND ATTENUATION SHALL
USE SOUND ATTENUATION BLANKETS (SAB).
7. REFER TO SPECIFICATIONS FOR MINIMUM STUD THICKNESS, MAXIMUM
SPACING AND ALLOWABLE LIMITING HEIGHTS DEFLECTION CRITERIA FOR
GYPSUM BOARD.
8. EACH PARTITION SHOWN ON THE DRAWINGS TO HAVE A FIRE AND OR
SMOKE RESISTANT RATING SHALL BE IDENTIFIED WITH A LABEL ABOVE
THE CEILING ON EACH SEGMENT OF WALL AND 20'-0" O.C. MAX. EACH SIDE
OR AS REQUIRED BY THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
9. PROVIDE METAL STRAPPING @ 24" VERT. TO HOLD INSULATION AT AREAS
WITHOUT GYPSUM WALLBOARD.
10. ALL WALLS SCHEDULED TO RECEIVE SOUND BATTS OR THERMAL
INSULATION, EXTEND BATTS OR INSULATION ON FULL HEIGHT OF WALL.
11. ALL BOTTOM WALL TRACKS TO BE SET IN STRIP OF SOUND CAULK.
12. ALL BLOCKING TO BE FIRE RETARDANT TREATED.
13. ALL RATED PARTITIONS SHALL BE LABELED ABOVE CEILING WITH LABELS
PER THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AS REQUIRED.
IBC CHAPTER 7 AT MINIMUM.
14. SEE FLOOR PLAN FOR EXTENT AND LOCATIONS.
PARTITION NOTES:
CONT 2" WIDE x 22 GA
METAL STRAP FOR
TOP ATTACHMENT OF
GYPSUM WALLBOARD
CONT 22 GA 3" DEEP
LEG DEFLECTION
TRACK ATTACH TO
DECK AT 12" OC MAX
LINE OF CEILING
AS SCHEDULED
CONT 2" WIDE x 22 GA
METAL STRAP FOR
TOP ATTACHMENT OF
STUDS
CONT 2" WIDE x 22 GA
METAL STRAP FOR
TOP ATTACHMENT OF
GYPSUM WALLBOARD
CONT 2" WIDE x 22 GA
METAL STRAP FOR TOP
ATTACHMENT OF
GYPSUM WALLBOARD
CONT 2" WIDE x 22 GA
METAL STRAP FOR
TOP, ATTACH TO DECK
AT 12" OC MAX
CONT 2" WIDE x 22 GA
METAL STRAP FOR
TOP ATTACHMENT OF
GYPSUM WALLBOARD
WHERE GYPSUM
WALLBOARD IS
CONCURRENT WITH
DECK FLUTE RECESS,
EXTEND UP INTO
RECESS AS SHOWN
DO NOT ATTACH
GYPSUM WALLBOARD
OR STUDS TO
DEFLECTION TRACK IN
THIS AREA
DO NOT ATTACH
GYPSUM BOARD OR
STUDS TO
DEFLECTION TRACK
IN THIS AREA
WHEN PARTITION IS ALIGNED AT
DECK FLUTE RECESS - PROVIDE A
6"x10"x22 GA METAL PLATE AT
DECK FLUTE RECESS THAT IS
CONTIGUOUS WITH PARTITION -
ATTACH METAL PLATE TO DECK
WITH POWER DRIVEN FASTENERS
AT SAME SPACING REQUIRED FOR
PARTITION TOP TRACK
SEAL ONE SIDE OF
PARTITION AGAINST
PASSAGE OF SMOKE
WHEN PARTITION IS ALIGNED
AT DECK FLUTE RECESS,
PROVIDE A 6"x10"x22 GA METAL
PLATE AT DECK FLUTE RECESS
THAT IS CONTIGUOUS WITH
PARTITION - ATTACH METAL
PLATE TO DECK WITH POWER
DRIVEN FASTENERS AT SAME
SPACING REQUIRED FOR
PARTITION TOP TRACK
DO NOT ATTACH GYPSUM
WALLBOARD OR STUDS
TO DEFLECTION TRACK IN
THIS AREA
FLUTED STEEL DECK / CONCRETE FLOOR
OR ROOF PERPENDICULAR OR DIAGONAL
TO FLUTES
NON-RATED OR SMOKE
RESISTANT
FLUTED STEEL DECK / CONCRETE FLOOR
OR ROOF PERPENDICULAR OR DIAGONAL
TO FLUTES
NON-RATED
FLUTED STEEL DECK / CONCRETE
FLOOR OR ROOF PARALLEL TO FLUTES
NON-RATED OR SMOKE
RESISTANT
FLUTED STEEL DECK / CONCRETE
FLOOR OR ROOF PERPENDICULAR OR
DIAGONAL TO FLUTES
NON-RATED
EXTEND AT MINIMUM
ONE LAYER UP INTO
FLUTE RECESS AND
SEAL
LINE OF CEILING
AS SCHEDULED
DO NOT ATTACH GYPSUM
WALLBOARD OR STUDS
TO DEFLECTION TRACK IN
THIS AREA
1"
3/ 4"
1"
3/ 4"
1"
1"
CONT 22 GA 3" DEEP LEG
DEFLECTION TRACK
ATTACHED TO DECK AT
12" OC MAX
SEAL ONE SIDE OF
PARTITION AGAINST
PASSAGE OF SMOKE
WHEN PARTITION IS ALIGNED
AT DECK FLUTE RECESS,
PROVIDE A 6"x10"x22 GA METAL
PLATE AT DECK FLUTE RECESS
THAT IS CONTIGUOUS WITH
PARTITION - ATTACH METAL
PLATE TO DECK WITH POWER
DRIVEN FASTENERS AT SAME
SPACING REQUIRED FOR
PARTITION TOP TRACK
FLUTED STEEL DECK / CONCRETE
FLOOR OR ROOF PARALLEL TO FLUTES
NON-RATED OR SMOKE
RESISTANT
CONT 22 GA 3" DEEP LEG
DEFLECTION TRACK
ATTACHED TO DECK AT
12" OC MAX
LINE OF CEILING
AS SCHEDULED
CMU BOND BEAM
SOUND CAULK
LINE OF
STRUCTURE
METAL RUNNER
5/8" GYPSUM
WALLBOARD
CAULK
METAL RUNNER
REFER TO PARTITION
HEAD DETAILS FOR
RATED OR NON-RATED
CONDITIONS
REFER TO SCHEDULE
BELOW FOR PARTITION
WIDTH
LINE OF
CEILING
LINE OF
STRUCTURE
5/8" GYPSUM BOARD
WIDTH
BRACE EACH
STUD AT 4'-0"
OC
VERTICALLY
LINE OF STRUCTURE
OR OTHER WALL
CONSTRUCTION
PROVIDING BACK-UP
FOR STUD BRACING
BRACE EACH
STUD AT 4'-0"
OC
VERTICALLY
PLAN
*NON RATED BLOCKS ASSUMED TO BE HOLLOW, NORMAL WEIGHT
BLOCK, NON STRUCTURAL.
**RATED BLOCKS ASSUMED TO BE PERLITE LOOSE CAVITY FILL
4"
TOP OF SLAB
EXPANSION JOINT BOARD
MATERIAL
1/2"
1/ 4"
4"
TOP OF SLAB
1/4"x1/4" SLAB DEPTH TOOLED
WITH PICTURE FRAME FINISH1/4"
3/4" CHAMFER (TYP)
(MATCH EXISTING)
5'-0" V.I.F.
4"
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2019-02-07
2/ 8/
:2
4:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
A-001
P A
R T
IT
IO
N T
Y P
E S
2018-150
J. RYAN
J. MORGAN
PARTITION TYPE "M"
M A
R K
BLOCK
WIDTH
FIRE
RATING
UL
LISTING P
T S
-M S
T C
R A
T
IN
G
COMMENTS
M4 3 5/8" NA NA 44
M6 5 5/8" NA NA 45
M8 7 5/8" NA NA 48
M12 11 5/8" NA NA 51
1M4 3 5/8" 1 HR U905 48
1M6 5 5/8" 1 HR U905 53 IBC T 7.21.2.2, SOLID ONLY
1M8 7 5/8" 1 HR U905 57 IBC T 7.21.2.2
1M12 11 5/8" 1 HR U905 63
2M4 3 5/8" 2 HR U905 48
2M6 5 5/8" 2 HR U905 53
2M8 7 5/8" 2 HR U905 57
2M12 11 5/8" 2 HR U905 63
3M4 3 5/8" 3 HR U904 48 IBC T 7.21.2.2
3M6 5 5/8" 3 HR U904 53 IBC T 7.21.2.2
3M8 7 5/8" 3 HR U904 57
3M12 11 5/8" 3 HR U904 63
1 1/2" = 1'-0"
A-001
PARTITION HEAD CONDITIONS
PARTITION TYPE "F"
M A
R K
STUD
WIDTH
GWB THK (LAYERS
PER SIDE)
PARTN
WIDTH
FIRE
RATING UL LISTING S
T C
R A
T
IN
G
STC
LISTING COMMENTS
F0 7/8" 5/8" 1 1/2" NA NA NA NA
F1 1 5/8" 5/8" 3 1/8" NA NA NA NA
F2 2 1/2" 5/8" 4 1/4" NA NA NA NA
F3 3 5/8" 5/8" 4 1/4" NA NA NA NA
F6 6" 5/8" 6 5/8" NA NA NA NA
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
C 2018-11-02 95% SUBMITTAL
D 2018-12-20 100% SUBMITTAL
1 2019-02-07 100% COMMENTS
3 6 9 12 IN0
3" = 1'-0"
A-001
EXPANSION JOINT
3 6 9 12 IN0
3" = 1'-0"
A-001
CONCRETE CONTROL JOINT
0 1 2 FT6"
1 1/2" = 1'-0"
A-001
SIDEWALK SECTION
A-201
A-201
A-201
A-201
I-751
10031002
CONFERENCE
ROOM
FOYER AREA
MEN
WOMEN
NEW VISITOR
LOUNGE
NEW
ELECTRICAL
NEW OFFICE
NEW STORAGE
EXISTING CONCRETE PLANTING BED TO REMAIN
EXISTING CONCRETE
PLANTING BED TO REMAIN
STORAGE
STORAGE
RESTROOM
CLOSET
STORAGE
STORAGE
OFFICE
JAN.
REF. GARBAGE
STORAGE
MECHANICAL
ROOM
JAN.
NEW 3'-0" HIGH CAST-IN-
PLACE CONCRETE WALL
(TYP. @ 2 LOCATIONS)
EXISTING RAMP AND
RAILING TO REMAIN
EXISTING RAMP AND
RAILING TO REMAIN
PROTECT DURING
CONSTRUCTION
EXISTING STAIR AND
RAILING TO REMAIN
PROTECT DURING
CONSTRUCTION
8 8 8
N E
W P
A V
E R
S
A-401
A-401
A-311
20' - 1"
G3A
NEW CONC. WALKWAY
NEW PAVERS
A-311
V.I.F.
24' - 0"
A-352
ALIGN
ALIGN
PRE-FINISHED
GALVANIZED STEEL GATE
WITH LOUVER DESIGN
V .I .F
V.I.F.
25' - 9"
V.I.F.
6' - 6"
EXISTING STAIRS AND
LANDING TO REMAIN
PROTECT DURING
CONSTRUCTION
EXISTING CONCRETE
PAD TO REMAIN
EXISTING CONCRETE
PAD TO REMAIN
E X
IS
T
IN
G
C O
N C
W
A L K
W A
Y T
O R
E M
A
IN
A-352
NEW CONC. WALKWAY EXISTING CONC.
WALKWAY TO REMAIN
EQ 8' - 0" EQ
A-352
EXISTING GRASS
AREA TO REMAIN
EXISTING GRASS
AREA TO REMAIN
E X
IS
T
IN
G
G R
A
E A
T O
R E
M A
IN
G3A G3A
(4) NEW BOLLARDS -
SEE DETAIL 3/A-601
A-352
NEW IT CLOSET
1007A
4' - 10" 3' - 7" 6' - 0" 13' - 8"
STEEL TUBE
HSS 4x4x1/4 (TYP)
21 3
A
3' - 0" 3' - 0"
N E
W C
O N
C W
A L K
W A
Y
EXISTING CONC.
WALKWAY TO REMAIN
A-352
A-351
17 17
(3) REWORK EXISTING
DOWNSPOUTS TO
EXTEND TO GRADE
AROUND NEW WALL
A-351
LEGEND:
NEW CMU WALL
EXISTING WALL TO REMAIN
DOOR TAGX
NEW MTL STUD / GYP. BD. WALL
1. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
JOB CONDITIONS AND NOTIFY COR IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE
WORK.
3. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL
BE MADE FROM THE DRAWINGS WITHOUT FIRST
SECURING WRITTEN PERMISSION FROM THE COR.
4. REQUEST WRITTEN INTERPRETATION FROM THE COR
FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN
THE DRAWINGS PRIOR TO PROCEEDING WITH THAT
PORTION OF THE WORK.
5. DOORS SHALL BE LOCATED 4" FROM THE ADJACENT
WALL, UNLESS NOTED OTHERWISE.
6. ALL WALLS OR PORTION OF WALLS WITH TILE FINISH
SHALL HAVE CEMENTITIOUS TILE BACKER BOARD IN
LIEU OF GYPSUM WALL BOARD.
7. DIMENSIONS ARE TO FACE OF GWB OR MASONRY OR
GRIDLINE U.N.O.
8. REFRAME EXISTING WALL AS REQUIRED FOR NEW
DOORS AND CORRIDORS.
9. INSTALL NEW HARDWARE ON ALL DOORS
ASSOCIATED WITH THE AREAS BEING RENOVATED
10. ALL WALLS TO BE PAINTED IN THE AREAS BEING
RENOVATED
GENERAL NOTES:
Croft & Associates
3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
L
IF
T W
IN
G
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G E
O R
G
IA
P R
O
JE
C T
L O
C A
T
IO
N
D R
A W
IN
G
C O
N T
A C
T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N T
A C
T
R O
B E
R T
E R
N S
T
D S
N
-3 ro b e rt
.e rn st .5 u s.
a f.
m il
R E
P A
IR
F
A C
IL
IT
Y
B U
IL
D
IN
G
F
G W
B
-0
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E
G E
O R
G
IA
J. MORGAN
C o p yr ig h t b y C ro ft
A ss o ci a te s, P
C A ll ri g h ts r e se rv e d T h is d o cu m e n t is p ro p e rt y o f C ro ft
A ss o ci a te s, P
C I t is t o b e u se d o n ly f o r th e s p e ci fic p ro je ct r e fe rr e d t o o r id e n tif ie d h e re in a n d is n o t to b e u se d o n o th e r p ro je ct s, in w h o le o r in p a rt e xc e p t b y th e e xp re ss w ri tt e n a g re e m e n t o f
C ro ft
A ss o ci a te s, P
C
2019-02-07
/3
/2
:2
:5
A
M C
U s e rs
\T im
\D o c u m e n ts
\2
-1
D
O B
B
IN
S A
R B
A
C
E N
T R
A L tr id le y Q
Z R
Q .r v t
A-101
P R
O P
O S
E D
F L
O O
R P
L A
N
2018-150
J. RYAN
J. MORGAN
PLAN
NORTH
0 5 25 FT10
1/8" = 1'-0"
A-101
PROPOSED FLOOR PLAN
KEYNOTES - FLOOR PLAN:
1 NEW CONCRETE WALKWAY. SEE SHEET A-001 FOR DETAILS
2 NEW 8" CMU WALL WITH BRICK VENEER - SEE SECTION AND
DETAILS
3 NEW FIXTURES IN RESTROOMS - SEE PLUMBING
4 NEW WATER FOUNTAIN - SEE PLUMBING
5 INSTALL NEW CONCRETE FLOWER BED TO MATCH EXISTING.
LEVEL FOR PROPER DRAINAGE AND SLOPE - SEE DETAILS
6 INSTALL NEW MILLWORK AND SINK
7 PREP & PAINT EXISTING EXTERIOR DOOR & FRAME
8 NEW BLINDS TO BE INSTALLED ON WINDOWS - SEE INTERIOR
9 LAN/COMM QUAD PORTS TO BE INSTALLED EVERY 10'-0" ALONG
INTERIOR WALLS. SEE ELEC DWGS.
10 AREA BETWEEN BUILDING AND SIDEWALK TO HAVE PAVERS.
LEVEL FOR PROPER DRAINAGE AND SLOPE. PAVERS SHALL BE
MODULINE PAVER BY BELGARD (OR EQUAL), CONCRETE, SMOOTH
FINISH, 12"X12"X2" LAID ON TOP OF 2" COMPACTED SAND BED LAID
ON TOP OF 6" CRUSHER RUN GRAVEL BAS
11 NEW 6'-0" PRIVACY WALL TO MATCH BUILDING BRICKS
12 NEW HUFCOR ELECTRICALLY OPERATED CONTINUOUSLY HINGED
FOLDING PARTITION WITH 51 STC RATING
13 INSTALL NEW DRYWALL ON ALL WALLS OF THIS ROOM. EXTEND
DRYWALL MINIMUM 1' -0" ABOVE NEW ACOUSTICAL CEILING TILE
14 ALL GRASS SHALL BE REPLACED WITH SOD IN AREAS AFFECTED
BY CONSTRUCTION
15 NEW AIR FORCE INSIGNIA TO BE MOUNTED ON SOUTH WALL.
CONTRACTOR SHALL PROVIDE PER AIR FORCE SIGNAGE
STANDARD AND INSTALL. CORDINATE FINAL LOCATION AND
HEIGHT WITH COR PRIOR TO INSTALLATION.
16 NEW CONCRETE SLAB WITH 10 MIL VAPOR BARRIER AND 4" STONE
BED BELOW
17 SCARIFY THE SLAB PER MANUFACTURER'S REQUIREMENTS TO
RECIEVE FLOOR LEVELING GROUT TO INFILL EXISTING SLOPED
CONCRETE STRUCTURE TO PROVIDE FLAT AND LEVEL FLOOR AS
SHOWN TO RECEIVE NEW FINISHES INDICATED ON FINISH PLAN
I-101
18 NEW FLOOR DRAIN AND SLOPE NEW FLOOR TO DRAIN. SAW CUT
EXISTING SLAB IF NEEDED. SEE PLUMBING
19 EXISTING RAMP TO REMAIN, PROTECT DURING CONSTRUCTION
20 NEW CONCRETE SLAB TO ALIGN WITH EXISTING RAMP
21 PROVIDE NEW SLOPED 4" CONCRETE SLAB WITH 10 MIL. VAPOR
BARRIER OVER 4" STONE BED, SEE TIE IN DETAIL 6/A-352. SLOPE
FLOOR AS SHOWN AND RECEIVE NEW FINISHES INDICATED ON
FINISH PLAN I-101
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
C 2018-11-02 95% SUBMITTAL
CONFERENCE
ROOM
FOYER AREA
MEN
WOMEN
NEW VISITOR
LOUNGE
NEW
ELECTRICAL
NEW OFFICE
STORAGE
STORAGE
1017 RESTROOM
CLOSET
STORAGE
OFFICE
JAN.
STORAGE
STORAGE
JAN.
NEW STORAGE
1 1
12'-0" 12'-0"
9'-0"
9'-0"9'-0"
9'-0"
9'-0"
9'-0"
1 1
REF. GARBAGE
MECHANICAL
ROOM
A-311
A-311
INSTALL NEW EXTERIOR GRADE
GYPSUM BOARD CEILING AT
EXISTING MAIN ENTRANCE
CANOPY AND NEW LED LIGHTING
- SEE SECTION
NEW IT CLOSET
1007A
9'-0"
9'-0"
9'-0"9'-0"
9'-0"
9'-0" 9'-0"
9'-0"
9'-0"
9'-0"
8'-0"
8'-0"
9'-0"
9'-0"
9'-0"
21 3
A
A-351
A-351
2' x 2' PARABOLIC LIGHT
2' x 4' PARABOLIC LIGHT
6" RECESSED CAN LIGHT
STRIP LIGHT
RCP LEGEND:
2' x 2' ACT GRID
GWB CEILING
2' x 2' SUPPLY DIFFUSER
2' x 2' RETURN REGISTER
SOUND ATTENUATION
BATTS (TYP)
5/8" GYPSUM BOARD ON
3 5/8" METAL STUDS
(TYP)
2 LAYERS 5/8" GYPSUM
BOARD SOFFIT (TYP.)
ACOUSTICAL
CEILING (TYP)
CAULK TRACK AT GYP,
CONTINUOUS (TYP)
2 1/4"
1' - 0"1' - 0"
METAL STUDS AND GYPSUM
BOARD SHALL EXTEND AND
SEAL TO ROOF DECK ABOVE
10'-7 13/32"0'-0" A.F.F.
FINISH FLOOR
11'-11 235/256"
WT 7x19
3/8" HANGER RODS PER
MFGR REQUIREMENTS
12'-7 123/256"
12'-0" A.F.F.
CEILING HEIGHT
12'-6" A.F.F.
BOTTOM OF WT 7x19
1/4" PLATE
NOTE: MEMBERS EXTENDS
CONTINUOUS FROM BACK NORTH
WALL OF PANEL STORAGE AREA
TO SOUTH WALL OF CONFERENCE
ROOM
3 5/8" MTL STUDS 16" O.C.
(TYP)
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2019-02-07
2/ 8/
:2
4:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
A-131
R E
F L
E C
T E
D C
E
IL
IN
G
P L
A N
2018-150
J. RYAN
J. MORGAN
0 5 25 FT10
1/8" = 1'-0"
A-131
REFLECTED CEILING PLAN
PLAN
NORTH
KEYNOTES - REFLECTED CEILING PLAN
1 INSTALL NEW 24"x 24" ACOUSTICAL CEILING GRID & TILE IN THIS ROOM.
CEILING HEIGHT TO MATCH EXISTING.
2 EXISTING CEILING TO REMAIN AND BE PAINTED
3 EXISTING SOFFIT TO REMAIN. TO BE PAINTED
3 6 9 12 IN0
3" = 1'-0"
A-131
FOLDING PARTITION SECTION
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
C 2018-11-02 95% SUBMITTAL
A-201
A-201
A-201
A-201
EXISTING ROOF TO
REMAIN
EXISTING ROOF TO
REMAIN
EXISTING FANS
DEMO, INFILL
STRUCTURE (METAL
ROOF) AND PATCH
ROOF MEMBRANE
EXISTING FANS
DEMO, INFILL
STRUCTURE (METAL
ROOF) AND PATCH
ROOF MEMBRANE
INTAKE/FLUE
DEMO, INFILL
STRUCTURE (METAL
ROOF) AND PATCH
ROOF MEMBRANE
INTAKE/FLUE
DEMO, INFILL
STRUCTURE (METAL
ROOF) AND PATCH
ROOF MEMBRANE
COMBUSTION AIR
DEMO, INFILL
STRUCTURE (METAL
ROOF) AND PATCH
ROOF MEMBRANE
A-311
A-352
LINE OF EXTERIOR
WALL BELOW (TYP)
1/ 4"
1'
-0
EXISTING CANOPY
ROOF TO REMAIN
EXISTING CRICKETS
TO REMAIN
A-352
INTAKE/FLUE
DEMO, INFILL STRUCTURE
(METAL ROOF) AND PATCH
ROOF MEMBRANE
INTAKE/FLUE
DEMO, INFILL STRUCTURE
(METAL ROOF) AND
PATCH ROOF MEMBRANE
INTAKE/FLUE
DEMO, INFILL
STRUCTURE (METAL
ROOF) AND PATCH
ROOF MEMBRANE
- EXISTING FANS
- COMBUSTION AIR
- INTAKE/FLUE
LEGEND:
REWORK EXISTING
DOWNSPOUTS TO
EXTEND TO GRADE
AROUND NEW WALL
NEW METAL CAP
FLASHING, TO BE 24
GAUGE GALVANIZED
PREFINISHED WITH
HEMMED EDGE
EXISTING WOOD
BLOCKING AND CURB
TO REMAIN
EXISTING ROOF
TO REMAIN
NEW 2" X 6" SPACED
AS NEEDED
NEW FASTENER
NEW SEALANT
(ALL SIDES)
4"
3/4"
R-19 BATT INSULATION
INFILL BETWEEN DUCT
AND CURB, ALL
LOCATIONS
DUCT, SEE MECH.
DECK TO REMAIN EXCEPT
AT DUCT PENETRATION
AS SHOWN
VERIFY OPENING IN FIELD FOR DUCTWORK
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2018-12-20
2/ 8/
:2
4:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
A-151
R O
O F
P L
A N
2018-150
J. RYAN
J. MORGAN
0 5 25 FT10
1/8" = 1'-0"
A-151
LEVEL 1 - ROOF PLAN
PLAN
NORTH
0 1 2 3 FT6"
1" = 1'-0"
A-151
TYP. ROOF SHEET METAL CURB DETAIL
REV. DATE/BY DESCRIPTION
B 2018-09-07 65% SUBMITTAL
TOP OF JOIST
12'-2 1/2"
TOP OF JOIST 2
16'-3"
5510 EXISTING SIGN TO REMAIN
FIRST FLOOR
0'-0"
TOP OF JOIST
12'-2 1/2"
TOP OF JOIST 2
16'-3"
FIRST FLOOR
0'-0"
TOP OF JOIST
12'-2 1/2"
TOP OF JOIST 2
16'-3"
A-352
4 9 EXISTING RAMP AND RAILING TO REMAIN
FIRST FLOOR
0'-0"
TOP OF JOIST
12'-2 1/2"
TOP OF JOIST 2
16'-3"
ABOVE
FINISHED
GRADE
EXHAUST LOUVERS
Croft & Associates 3400 Blue Springs Road, Suite 200 Kennesaw, GA 30144
770.529.7714 (p)
770.529.7716 (f) www.croftae.com
CONSTRUCTION DOCS.
C
IV
IL
E
N G
IN
E
E R
IN
G th
A
IR
LI
FT
W
IN
G D
O B
B
IN
S A
IR
R
E S
E R
V E
B A
S E
, G E
O R
G
IA
P R
O
JE
C T
LO
C
A
TI
O N
D R
A W
IN
G
C O
N
TA
C T
PROJECT No.
PROJ. OFFICER
DESIGNED
CHECKED
DATE
DRAWING OF
P R
O
JE
C T
C O
N
TA
C T:
R O
B E
R T
E R
N S
T
- D
S N
-3 ro be rt.
er ns t.5 us .a f.m il
R E
P A
IR
F
A C
IL
IT
Y B
U
IL
D
IN
G
FG
W B
6-
D O
B B
IN
S
A
IR
R E
S E
R V
E B
A S
E , G
E O
R G
IA
J. MORGAN
C op yr ig ht by
C ro ft
A ss oc ia te s, P C
A ll rig ht s re se rv ed
T hi s do cu m en t i s pr op er ty o f C ro ft
A ss oc ia te s, P
C
It is to b e us ed o nl y fo r th e sp ec ifi c pr oj ec t r ef er re d to o r id en tif ie d he re in a nd is n ot to b e us ed o n ot he r pr oj ec ts
, i n w ho le o r in p ar t, ex ce pt b y th e ex pr es s w rit te n ag re em en t o f C ro ft
A ss oc ia te s, P
C
2018-12-20
2/ 8/
:2
4:
A M
C :\U se rs
\J ac ki e\
D oc um en ts \2
8-
_D O
B B
IN
S
A R
B
_A
_C
E N
T R
A L_ jry an cr of ta e.
co m .r vt
A-201
O V
E R
A L
L E
X T
E R
IO
R
E L
E V
A T
IO
N
S
2018-150
J. RYAN
J. MORGAN
KEYNOTES - EXTERIOR ELEVATIONS
1 BRICK 1 (BR1)
2 INSTALL NEW CONCRETE FLOWER BED TO MATCH EXISTING - SEE
DETAILS & STRUCTURAL
3 NEW PRIVACY WALL TO MATCH BUILDING BRICKS
4 NEW WALL ON BOTH SIDES OF CANOPY
5 EXISTING EXTERIOR WINDOWS TO GET TINTED FILM GLAZING
INSTALLED ON EACH PANE
6 NEW EXTERIOR LIGHTING TO MATCH EXISTING
7 PAINT / CLEAN EXISTING CANOPY
8 PRIME AND REFINISH EXISTING EXTERIOR STUCCO. REPAIR AREAS
WHERE NEEDED AND REMOVE AND REPLACE ALL SEALANT AND
BACKER RODS AT ALL JOINTS WHERE EXISTING SEALANT OCCURS
9 NEW SWING GATE
10 NEW BUILDING SIGNAGE TO BE PROVIDED BY CONTRACTOR.
CONTRACTOR SHALL CARRY $10,000 ALLOWANCE FOR COORDINATE
INSIGNIA. DETAILS WITH DOBBINS COR PRIOR TO BEGINNING WORK.
INSTALL VERIFYING LOCATION AND REQUIREMENTS WITH CO.
11 PREP & PAINT EXISTING RAILINGS
0 5 25 FT10
1/8" = 1'-0"
A-201
OVERALL ELEVATION - SOUTH
0 5 25 FT10
1/8" = 1'-0"
A-201
OVERALL ELEVATION - WEST
0 5 25 FT10
1/8" = 1'-0"
A-201
OVERALL ELEVATION - NORTH
0 5 25 FT10
1/8" = 1'-0"
A-201
OVERALL ELEVATION - EAST
EXISTING RAMP AND RAILING TO REMAIN
REV. DATE/BY DESCRIPTION
A 2018-07-20 35% SUBMITTAL
B 2018-09-07 65% SUBMITTAL
TOP OF NAILER
12'-9"
CEILING HEIGHT
9'-0"
TOP OF JOIST
12'-2 1/2"
NEW BRICK VENEER TO
MATCH EXISTING W/ BRICK
TIES AT 24" HORIZONTAL &
16" VERTICAL
NEW 1 1/2" BATT
INSULATION
NEW 5/8" GYB ATTACHED
TO Z CHANNEL STUD AT
16" O.C.
NEW R-7.5 RIGID
INSULATION
EXISTING SOFFIT
SYSTEM TO REMAIN
NEW MASONRY
ANCHORS AT
16" VERTICAL
NEW FLUID APPLIED
MOISTURE BARRIER
NEW CEILING - SEE
REFLECTED CEILING
PLAN
NEW FLOWER BED
TO MATCH EXISTING
NEW THRU WALL
FLASHING
WEEPS AT 32" O.C.
2'
6"
2X8 TREATED
WOOD NAILER
BU ROOF
8"
#4 @ 12" EW
PLANTER WALL
1"
#3 @ 12" O.C.
2 #4 CONT
2' - 5"
3/4" CHAMFER
(TYP.)
A-311
A-311
2 2 X 1/4" SUPPORT ANGLE EXISTING TO REMAIN
EXISTING 2 X 2 X 1/4
FRAMING TO REMAIN EXISTING 3 X 3 X 1/4 L TO
REMAIN
NEW 8" CMU WALL W/ #5 AT
32" ON CENTER, GROUT
REINFORCED CELLS SOLID
#5 DOWELS AT 32"
ON CENTER, EMBED
9" INTO SLAB, LAP W/
VERTICAL BAR 30"
#4 AT 18" ON CENTER
6" 1'
-6
M
IN
EXISTING BAR JOISTS
AND BRACING (BEYOND)
1/4" X 8" X 3" LLV BENT PLACE, ATTACH TO
METAL DECK WITH #10 SCREW AT 18" ON
CENTER
1/2" DIAMETER EPOXY
ANCHOR AT 2'-0" ON
CENTER WIT H VERTICAL
SLOTTED HOLE
8" BOND BEAM W/ (1)-#5
CONTINUOUS BOTTOM
#4 CONTINUOUS (TYP.)
CONCRETE
12"X12"X2" PAVERS
4"
GRADE SLOPE
2" 4"
COMPACTED SAND
GRAVEL BASE
2' - 0"
1' - 6"
6"
6"
EXIST. SLAB
NEW TOPPING SLAB
TO REPLACE DEMO
SLAB
NEW FINISH
AT DEMO, FOLD BACK
VAPOR BARRIER AND
REINSTALL AS SHOWN
NEW VAPOR BARRIER
NEW 4" STONE BED
NEW CONCRETE
TURNDOWN SLAB
DEMO SAWCUT LINE
8" RECESSED CAN LIGHT,
SEE ELECTRICAL
EXTERIOR GRADE
GYPSUM
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.