This is a Statement of Need for SCBA (Self-Contained Breathing Apparatus) equipment modifications to the NOAA Ship Gordon Gunter in support of an upcoming drydock availability. The document specifies procurement requirements for Central Alabama Training Solutions, a professional SCBA equipment supplier, to provide equipment as long lead time material (LLTM) for delivery to Pascagoula, Mississippi by September 1, 2026. The equipment must be new and in new condition, include all operational and maintenance manuals, technical documentation, and installation drawings.
The specific equipment requirements include: (1) an EconoAir Model EA07H breathing air compressor module rated at 6000 PSI, 20.7 CFM, 460-volt three-phase electric drive with 15 HP motor and integrated purification system; (2) a MAKO Model SCFS2-3HP two-SCBA fill station with 6000 PSI cascade control capability; (3) two 6000 PSI ISO/DOT cylinders with 10-year hydro rating rated for 2036 CF with associated storage rack and charging station components; and (4) all items palletized and packed in wooden crates. The compressor unit must measure less than 30 inches in one horizontal dimension with removable components, while the bottle foundation and charging station must measure less than 24 inches in one horizontal dimension. The related solicitation number is 1333MK26Q0068, issued as a notice of intent for sole source procurement under FAR 6.103 authority with the Department of Commerce's National Oceanic and Atmospheric Administration (NOAA). Firms believing they can meet requirements may submit substantiating documentation within 5 days to christopher.baker@noaa.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1333MK26Q0068.pdf | ||
| JOFOC.pdf | ||
| Sole_Source_Letter_-_NOAA__MS_-_4_16_2026_(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED
for MODS to NOAA SHIP GORDON GUNTER to Procure SCBA Equipment
1.0 Purpose: This Statement of Need contains requirements for Central Alabama Training Solutions, a professional supplier of SCBA equipment, to provide equipment as Long Lead Time Material (LLTM) in support of the upcoming Drydock Availability. Material to be delivered to Pascagoula, MS by September 01, 2026. Equipment to be supplied with: operational, maintenance, and technical manuals, installation information and drawings, and similar documentation for installation, maintenance, and operation of the equipment.
2.0 References:
2.1.1 None
3.0 Government Furnished Material: None additional.
4.0 Requirements:
4.1 Procure Model # EA07H, 6000 PSI, 20.7 CFM, 460 Volt, Three Phase Electric Driven, 4 Stage Breathing Air Module, EconoAir Open Frame [complete with automatic drain valve, emergency stop button, hour meter, final stage pressure gauge, visual CO/Moisture indicator, Low Oil Pressure switch, auto start/stop air pressure switch, 15 HP motor, MK5C Grade E purifier (57,400 CF)], and Electronic CO and Moisture (CMM) Mounting System
4.2 MAKO Model # SCFS2-3HP, Two SCBA Fill, 6000 PSI Rated, Three Bank Cascade Control, Containment Style Fill Station (complete with inlet & outlet gauges, 0-6000 PSI inlet & outlet regulator, “To & From” bank control valves & gauges, regulated auxiliary outlet with QD, master fill valve & gauge, three fill whips with bleeder valve & control valve, bypass valve, & all interconnecting fittings for cascade operation).
4.3 Two 6000 psi ISO/DOT cylinders 10 year hydro, 2036 CF, Storage Cylinder Rack MKBVS22C2D, Breathing Air Storage System (complete with 2 cylinders with CGA-702 nuts and nipples and all interconnecting hoses for cascade operation).
4.4 All items to be new and new condition.
4.5 Compressor unit to be less than 30” in one horizonal dimension, or have components removable and able to be reinstalled without damage to the unit.
4.6 Bottle foundation and charging station to be less than 24” in one horizontal dimension.
4.7 Delivery address to be: 151 Watts Ave, Pascagoula, MS, 39567
4.8 All items to be palletized and packed in wooden crates.
5.0 Period of Performance:
September 01, 2026 Delivery of equipment to delivery address to support loading on vessel prior to the vessel departing for shipyard.
6.0 Notes
6.1 Technical POCs
6.1.1 GU Port Engineer - Lucas Chapman lucas.chapman@noaa.gov, 301-346-5421
6.2 Shipcheck Dates – 6/16/26 to 6/20/26 in Pascagoula, MS;
End of Statement of Need