SolicitationAttachment4WageDetermination_1232SA26Q1001.pdf
PDF 57 KB Posted
- Attached to
- Blueberry Greenhouse Demolition and Construction
- Solicitation number
- 123SA26Q1001
About this file
This is a General Decision wage determination document (NJ20260027) issued by the U.S. Department of Labor's Wage and Hour Division, effective May 18, 2026, establishing prevailing wage rates for building construction work in Burlington County, New Jersey.
The document specifies hourly wage rates and fringe benefits for over 40 construction trade classifications required on federal contracts subject to the Davis-Bacon Act. Rates vary by trade and geographic location within Burlington County, with examples including: Asbestos Worker/Heat & Frost Insulator ($55.80-$60.84 base rate with $40.80-$48.38 fringe); Bricklayer ($45.20 base with $33.26 fringe); Electrician and Cable Splicer ($55.05-$63.82 base with $41.99-$48.76 fringe); Elevator workers ($71.85 base with $38.44 fringe); Plumbers/Pipefitters ($46.23-$59.57 base with $29.23-$50.76 fringe); Roofers ($35.95-$46.03 base with $21.85-$34.27 fringe); and numerous other trades. The determination includes paid holiday provisions, shift differentials, and hazard pay supplements for specialized work such as asbestos abatement and hazardous waste removal. The document incorporates Executive Orders 13706 (paid sick leave requirements) and 13658 (minimum wage thresholds of $13.65 per hour through December 31, 2026). Contractors must comply with these rates for all employees on covered federal construction projects and may request appeals through the Department of Labor's Wage Determination Appeals Process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"General Decision Number: NJ20260027 05/18/2026
State: New Jersey
Construction Types: Building
Counties: New Jersey Counties of Burlington
Modification Number Publication Date 1 01/30/2026 2 05/18/2026
ASBE0014-003 05/01/2025
Rates Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: (INCLUDES
THE APPLICATION OF ALL INSULATING MATERIALS,
PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO
ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE
APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS
AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND
CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT)
(BURLINGTON COUNTY (CITY OF BEVERLY; TOWNSHIPS OF
CINNAMINSON, DELANCO, DELRON, EDGEWATER PARK,
EVESHAM, HAINESPORT AND LUMBERTON; BOROUGH OF MAPLE
SHADE; TOWNSHIP OF MEDFOD; BOROUGH OF MEDFORD
LAKES; TOWNSHIP OF RIVERSIDE; BOROUGH OF RIVERTON;
TOWNSHIPS OF SHAMONG, SOUTHAMPTON, TABERNACLE,
WESTHAMPTON AND WILLINGBORO)).......................$ 60.84 48.38
ASBE0089-003 07/01/2025
Rates Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR: (INCLUDES
THE APPLICATION OF ALL INSULATING MATERIALS,
PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO
ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE
APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS
AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND
CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT)
(BURLINGTON COUNTY (TOWNSHIPS OF BORDENTOWN,
BURLINGTON, CHESTERFIELD, EASTHAMPTON, FLORENCE,
MANSFIELD, MT. HOLLY, NEW HANOVER, NORTH HANOVER,
PEMBERTON, SPRINGFIELD AND WOODLAND) PAID HOLIDAYS:
The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay....................$ 55.80 40.80
BRNJ0002-013 05/01/2021
Rates Fringes
BRICKLAYER
Work on high stacks: 22% per hour additional........$ 45.20 33.26
BRNJ0007-012 07/07/2025
Rates Fringes
MARBLE SETTER.......................................$ 64.66 40.97
BRNJ0007-014 07/01/2025
Rates Fringes
TERRAZZO WORKER/SETTER..............................$ 61.77 42.82
BRNJ0007-017 06/02/2025
Rates Fringes
TILE SETTER........................................$ 52.31 38.01
TILE
Work grouting all epoxy: $10.00 additional per day..$ 43.63 32.12
CARP0006-009 05/01/2025
Rates Fringes
CARPENTER (SCAFFOLD
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter..........................................$ 57.42 34.17
CARP0006-010 05/01/2025
Rates Fringes
CARPENTER, INCLUDING ACOUSTICAL CEILING
INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND
BLOWN INSULATION ...................................$ 57.42 34.17
CARP0029-006 05/01/2025
Rates Fringes
SOFT FLOOR LAYER....................................$ 57.42 34.17
CARP0454-009 05/01/2023
Rates Fringes
PILEDRIVERMAN PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY;
PROVIDED THAT THE WORKER WORKS ANY OF THE THREE
DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE
HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY. ..$ 46.73 41.69
CARP0715-007 05/01/2025
Rates Fringes MILLWRIGHT (Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.)..................$ 58.84 35.06
ELEC0269-017 01/05/2026
Rates Fringes
ELECTRICIAN AND CABLE SPLICER: INCLUDES LOW VOLTAGE
WIRING (BURLINGTON COUNTY (NORTH OF A LINE
FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON
BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY
DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD;
THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT.
HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT.
HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD
TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON;
THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO
THE OCEAN COUNTY LINE)).............................$ 63.82 41.99
ELEC0351-001 09/30/2024
Rates Fringes
ELECTRICIAN AND CABLE SPLICER (ATLANTIC COUNTY;
BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt.
Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE
MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES).....$ 55.05 48.76
ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (ATLANTIC
COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road;
then, south-southeast along the Burlington - Mt.
Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND
SALEM COUNTIES).....................................$ 45.51 34.39
ELEV0005-004 01/01/2025
Rates Fringes
ELEVATOR
A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day;
Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day..............................$ 71.85 38.44
ENGI0825-020 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS
WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY
DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER
IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND
WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR
RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR
ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY,
WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS
DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE
PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR,
THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY
AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS
THE WORK DAY BEFORE AND THE WORK DAY AFTER THE
HOLIDAY.............................................$ 52.88 37.50
POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID
LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT
END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER,
GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL
WORK: WORK ON A STATE OR FEDERALLY DESIGNATED
HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT
CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
1) THAT THE WORKER WORKS THREE OF THE PRECEDING
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 56.59 37.50
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT
SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY)
(WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1
CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL;
MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP;
TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE,
WHERE THE WORKER IS IN DIRECT CONTACT WITH
HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE
EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE
PROTECTION: 20% PER HOUR ADDITIONAL. PAID
HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY
OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1)
THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE
WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 58.22 37.50
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER
COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH);
HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT
END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.);
SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK:
WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS
WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT
WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL
PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY,
SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S
BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED
1) THAT THE WORKER WORKS THREE OF THE PRECEDING
FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 60.13 37.50
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE,
INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING
MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND
STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE
DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC
DRILL, SELF-POWERED DRILL); ELEVATING GRADER;
EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER);
PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF
LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE);
TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A
STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE,
WHERE THE WORKER IS IN DIRECT CONTACT WITH
HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE
EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE
PROTECTION: 20% PER HOUR ADDITIONAL. PAID
HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY
OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,
THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1)
THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE
WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY
BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE
HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY
BEFORE AND THE WORK DAY AFTER THE HOLIDAY...........$ 61.72 37.50
IRON0399-005 07/01/2024
Rates Fringes
IRONWORKER: STRUCTURAL AND ORNAMENTAL...............$ 54.24 38.40
IRONWORKER: REINFORCING.............................$ 53.24 38.40
LABO0008-001 05/01/2011
Rates Fringes
ASBESTOS REMOVAL
The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials;
and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)..............$ 28.37 21.62
LABO0077-002 05/01/2022
Rates Fringes
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE........$ 36.50 30.22
LABO0077-004 05/01/2022
Rates Fringes
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER,
LANDSCAPE LABORER, PIPELAYER, POWER TOOLE OPERATOR
AND SCREEDMAN.......................................$ 35.75 30.22
PAIN0021-032 05/01/2025
GLAZIER (BURLINGTON COUNTY (south of a line drawn between these cities: Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional..............$ 49.96 35.11
PAIN0711-011 05/01/2025
Rates Fringes GLAZIER (BURLINGTON COUNTY (north of a line drawn between these cities: Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Work welding or using a cutting torch: $1.00 per hour Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30
ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet: $1.00 per hour additional..........................................$ 52.68 31.29
PAIN0711-018 05/01/2025
Rates Fringes
DRYWALL FINISHER/TAPER..............................$ 44.87 30.15
PAIN0711-019 05/01/2025
Rates Fringes
PAINTER (SPRAY).....................................$ 45.55 29.86
PAINTER (BRUSH & ROLLER)............................$ 45.55 29.86
PLAS0592-036 05/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 53.21 33.42
PLUM0009-015 07/01/2025
Rates Fringes
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION
(BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE
TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY;
THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN
AS HIGH ST., UNTIL IT REACHES THE CITY OF MT.
HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG
MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38
EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT
CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES
COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD
ROUTE 530 TO Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545);
then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)...........................$ 59.57 46.45
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION
(BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE
TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY;
THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN
AS HIGH ST., UNTIL IT REACHES THE CITY OF MT.
HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG
MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38
EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT
CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES
COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD
ROUTE 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545);
then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)...........................$ 59.57 46.45
PLUMBER: SERVICE AND REPAIR (BURLINGTON COUNTY
(NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON
CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY
ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL
IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY
OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY
TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD
ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD
ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN,
ALONG COUNTY ROAD ROUTE 530 TO Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)........$ 46.23 29.23
PIPEFITTER: SERVICE AND REPAIR (BURLINGTON COUNTY
(NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON
CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY
ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL
IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY
OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY
TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD
ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD
ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN,
ALONG COUNTY ROAD ROUTE 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)........$ 46.23 29.23
PLUM0322-008 05/01/2025
Rates Fringes
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION
(BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE
TOWN OF BURLINGTON CITY, DOES NOT INCLUDE
BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541
EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE
CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT.
HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO
STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD
ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD
ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES
NOT INCLUDE Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)..$ 56.30 50.76
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION
(BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE
TOWN OF BURLINGTON CITY, DOES NOT INCLUDE
BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541
EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE
CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT.
HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO
STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD
ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD
ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES
NOT INCLUDE Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)..$ 56.30 50.76
ROOF0030-027 05/01/2025
Rates Fringes
ROOFER:
Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay.................................................$ 35.95 21.85
ROOFER: SLATE AND
Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay.................................................$ 38.95 21.85
ROOFER: ALL OTHER
Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay.................................................$ 46.03 34.27
SFNJ0669-006 04/01/2025
Rates Fringes
SPRINKLER FITTER (FIRE SPRINKLERS)..................$ 59.19 36.51
SFNJ0692-002 05/01/2021
Rates Fringes
SPRINKLER FITTER (FIRE SPRINKLERS) (WITHIN 15 MILES
BEYOND THE CITY LIMITS OF PHILADELPHIA).............$ 60.83 30.34
SHEE0027-009 06/01/2024
Rates Fringes
SHEET METAL WORKER (INCLUDING HVAC DUCT
INSTALLATION).......................................$ 59.08 47.06
SUNJ2004-003 01/02/2009
PLASTERER...........................................$ 42.33 0.00
LABORER: COMMON OR GENERAL.........................$ 19.27 12.42
TEAM0469-003 05/01/2025
Rates Fringes
TRUCK DRIVER: DUMP TRUCK (BURLINGTON COUNTY (EAST
OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE
DELAWARE
HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection:
$3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection:
$1.00 per hour PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours)..$ 48.63 42.66
TRUCK DRIVER: OFF THE ROAD TRUCK (BURLINGTON
COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY
TURNPIKE TO THE DELAWARE
HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection:
$3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection:
$1.00 per hour PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours)..$ 48.78 42.66
TEAM0676-002 05/01/2025
TRUCK DRIVER: OFF THE ROAD TRUCK (BURLINGTON COUNTY
(WEST OF THE LINE DRAWN FROM THE NEW JERSEY
TURNPIKE TO THE DELAWARE RIVER))
HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday BEREAVEMENT PAY: In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays..$ 44.65 34.11
TRUCK DRIVER: DUMP TRUCK DRIVERS (BURLINGTON
COUNTY (WEST OF THE LINE DRAWN FROM THE NEW JERSEY
TURNPIKE TO THE DELAWARE RIVER))
HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday BEREAVEMENT PAY: In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays..$ 44.30 34.11
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .