This is a Quality Assurance Surveillance Plan (QASP) for a Performance Based Service Contract covering Building 20 & 24 Wall Panel Repairs. The QASP is a government-developed document designed to ensure the contractor performs in accordance with contract performance metrics, delivers quality services as specified, and that the government only pays for acceptable work received. The QASP applies to the contract and all subsequent task orders issued under it.
The Contracting Officer maintains ultimate responsibility for determining the adequacy of contractor performance and ensuring equitable treatment, while the Contracting Officer's Representative (COR) is responsible for technical administration and ensures proper government surveillance of contractor performance. The COR is not empowered to make contractual commitments or authorize changes. The identified QA surveillance items require the contractor to: submit a schedule of repair activities within 10 business days of notice to proceed; provide necessary equipment, fall protection, and a safety plan for approval; inspect metal wall panel locations for integrity and attachment to the building; provide a sample metal panel inspection report; and submit a final inspection report in PDF format at project completion. The COR shall conduct periodic inspections on a daily basis, typically by verifying appropriate conditions for materials and methods, and may document progress with photographs. The COR is responsible for maintaining a complete Quality Assurance file with all records retained for the life of the contract. Service standards must comply with those specified in the PR&C, commercial/industry standards, and military/government standards.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR
Building 20 & 24 Wall Panel Repairs
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued there under. The intent is to ensure that the
Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
The QASP has been developed by the requiring activity. It is designed to provide direction to personnel performing contract surveillance activities. Personnel surveying the contract terms and conditions and SOW requirements will periodically review the QASP throughout the life of the contract.
The Contracting Officer’s Representative (COR) will monitor the Building 402 Roof Repairs to monitor the materials and methods used to make the repairs in a satisfactory manner.
SCOPE
The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to ensure the products/results specified in the PR&C or task order are delivered on time and meet the requirements of the PR&C or task order. The QASP is not intended to duplicate the Contractor’s Management Plan.
2. GOVERNMENT RESOURCES
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the
Government.
Contracting Officer’s Representative (COR) - An individual designated in writing by the
Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
3. RESPONSIBILITIES:
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that ensures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the project and ensures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the
Contractor deems may affect contract, price, terms, or conditions shall be referred to the
Contracting Officer for action.
Periodic Inspection – The COR shall conduct periodic inspections by verifying the conditions are appropriate for the materials and methods used to prepare and apply the MMA floor coating to make a durable surface. The COR may take photos to document the progress when work is being completed for the potential tasks identified in the Performance Work
Statement, the COR typically performs the periodic inspection on a daily basis.
Final Inspection – The COR will schedule a final inspection with the contractor when all of punch-list items have been completed.
4. LEVELS AND STANDARDS OF SERVICE
The standards of services are held to and comply with the standards specified in the PR&C, commercial/industry, and military/government standards.
5. IDENTIFIED QA SURVEILLANCE ITEMS
Performance Requirements
Required
Services
Performance Objective Performance Requirement
Provide schedule
Provide schedule of activities necessary to complete the metal panel repairs and inspection.
Submitted no later than (10) business days after notice to proceed.
Provide necessary equipment including Fall
Protection and
Safety Plan for approval.
Contractor shall provide access and safety equipment described in
3.7 & 3.12 - of Statement of Work and Safety Plan per 8.1 Item 1.
Approval of Safety Plan. Verify contractor has used appropriate equipment and used proper Fall Protection equipment to access metal siding locations to be repaired and inspected.
Inspection Inspect metal wall panel area as described in 3.2
Inspect metal wall panel locations for integrity and attachment to the building.
Provide sample report
Provide sample metal panel inspection report as described in section 7.1.4
Review report to determine it meets the scope of work, estimated costs appear reasonable and meet the needs of USDA.
Provide report Provide documentation for inspection and repairs as described in 1.1 & 3.2.
Submit final inspection report to COR in pdf format at the end of the project.
6. DOCUMENTATION
The COR shall, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract.